"> Gravity Davit - Equipment Database

Gravity Davit

medium 306 models total

Uses the lifeboat's own weight to swing it out on rollers or a curved track, then lowers it on wire falls through a centrifugal brake — no external power needed once the gripes are released.

Read more — Gravity Davit explained

What makes this type

A gravity davit launches a lifeboat by letting the boat's own weight do the work: once the securing gripes are released, the boat rolls or slides down a track or on rollers until the arms swing out fully over the ship's side, after which the crew lowers it on wire falls controlled by a brake. This differs from a luffing (radial) davit, which swings the boat out using a powered winch through an arc, and from a free-fall davit, where the boat drops directly into the water without a controlled lowering phase. Gravity davits remain common on cargo ships and tankers because the mechanism needs no electrical power to launch, only to recover.

Gravity davit, launching arrangement
Side view of a gravity davit swinging a lifeboat out from its stowed position on the curved track and lowering it on wire falls through a brake unit.

Main components

Davit arms and track

Curved or straight tracks along which the boat cradle travels outboard under gravity, stopping at the fully swung-out position where the falls take over.

Winch and wire falls

A drum winch pays out the falls under control of a centrifugal brake during lowering, and hauls the boat back up after recovery using a motor or hand crank as backup.

Centrifugal brake

Limits lowering speed regardless of load, the single part that keeps the boat descending at a controlled rate instead of in free fall.

Limit switches and hydrostatic release

Stop the winch at the top and bottom of travel and, on the lifeboat's painter, provide a hydrostatic release so the boat floats free if the ship sinks before launching.

Selection / Sizing

  • Safe working load, set well above the fully loaded lifeboat weight including all persons and equipment.
  • Outreach needed to clear the ship's side at the relevant freeboard and any flare in the hull.
  • Lowering speed, kept within the range the brake is designed to hold under full and light load.
  • Number of falls and drum arrangement, matched to the boat's weight and the required recovery speed.

Regulations / Class

Gravity davits fall under SOLAS Chapter III and the LSA Code, which set requirements for launching arrangements, load testing, and periodic operational testing including lowering the boat fully loaded or with an equivalent test weight. Class and flag administration surveys check the winch brake, wire falls, and hydrostatic release on the same schedule as the lifeboat itself, and davit winches are subject to a defined wire rope renewal interval based on age and condition rather than a single fixed number across all types.

Typical faults

FaultConsequence
Corroded or slack wire fallsUneven lowering, boat hangs off level or a fall parts under load
Seized or worn track rollersBoat does not swing out fully, davit arms jam mid-travel
Brake lining wearLowering speed exceeds the safe rate, risk of uncontrolled descent
Neglected hydrostatic release servicingRelease fails to activate or fires prematurely

What to look for in a supplier

  • Load test certification for the specific davit and winch combination, not a generic type approval alone.
  • Spare parts availability for the brake and winch, since these are the components that wear fastest.
  • Compatibility confirmed with the ship's existing lifeboat weight and outreach requirement before ordering a replacement unit.

A gravity davit that has never been load tested with the actual boat aboard is unproven; a paper certificate for the davit alone does not confirm the full system works together.

16 manufacturers · 306 models

Palfinger Marine

50 ✓ 15 verified
Palfinger Marine Palfinger DKL SWL-5t
Palfinger DKL SWL-5t unverified
Safe Working Load (t)
5
Palfinger Marine Palfinger DKL SWL-10t
Palfinger DKL SWL-10t unverified
Safe Working Load (t)
10
Palfinger Marine Palfinger DKL SWL-15t
Palfinger DKL SWL-15t unverified
Safe Working Load (t)
15
Palfinger DKL SWL-20t unverified
Safe Working Load (t)
20
Palfinger Marine Palfinger DKL SWL-25t
Palfinger DKL SWL-25t unverified
Safe Working Load (t)
25
Palfinger Marine Palfinger DKL SWL-30t
Palfinger DKL SWL-30t unverified
Safe Working Load (t)
30
Palfinger Marine Palfinger DKL SWL-40t
Palfinger DKL SWL-40t unverified
Safe Working Load (t)
40
Palfinger DKL SWL-50t unverified
Safe Working Load (t)
50
Palfinger Marine Palfinger DKCM SWL-5t
Palfinger DKCM SWL-5t unverified
Safe Working Load (t)
5
Palfinger Marine Palfinger DKCM SWL-10t
Palfinger DKCM SWL-10t unverified
Safe Working Load (t)
10
Palfinger Marine Palfinger DKCM SWL-15t
Palfinger DKCM SWL-15t unverified
Safe Working Load (t)
15
Palfinger Marine Palfinger DKCM SWL-20t
Palfinger DKCM SWL-20t unverified
Safe Working Load (t)
20
Palfinger DKCM SWL-25t unverified
Safe Working Load (t)
25
Palfinger Marine Palfinger DKCM SWL-30t
Palfinger DKCM SWL-30t unverified
Safe Working Load (t)
30
Palfinger DKCM SWL-40t unverified
Safe Working Load (t)
40
Palfinger Marine Palfinger DKCM SWL-50t
Palfinger DKCM SWL-50t unverified
Safe Working Load (t)
50
Palfinger Marine Palfinger Marine Gravity SWL-2t-B
Palfinger Marine Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-3t-B
Palfinger Marine Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-5t-B
Palfinger Marine Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-7t-B
Palfinger Marine Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-10t-B
Palfinger Marine Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-12t-B
Palfinger Marine Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-15t-B
Palfinger Marine Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-18t-B
Palfinger Marine Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-20t-B
Palfinger Marine Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-22t-B
Palfinger Marine Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-25t-B
Palfinger Marine Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-28t-B
Palfinger Marine Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-30t-B
Palfinger Marine Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Palfinger Marine Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-40t-B
Palfinger Marine Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-45t-B
Palfinger Marine Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-50t-B
Palfinger Marine Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-55t-B
Palfinger Marine Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
Palfinger Marine Palfinger Marine Gravity SWL-60t-B
Palfinger Marine Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja
Palfinger Marine FPG 85-2
FPG 85-2 ✓ verified
Application
Offshore gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine FPG 120
FPG 120 ✓ verified
Application
Offshore gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine FPG 180
FPG 180 ✓ verified
Application
Offshore gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine FAD 1000.1
FAD 1000.1 ✓ verified
Application
Fixed platform offshore davit for fast rescue boats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine PLG 60-2
PLG 60-2 ✓ verified
Application
Single pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

PLG 130-2 ✓ verified
Application
Single pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine NPT85DL
NPT85DL ✓ verified
Application
Single pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine NPT138DL
NPT138DL ✓ verified
Application
Single pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine NPT170DL
NPT170DL ✓ verified
Application
Single pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine NPT205DL
NPT205DL ✓ verified
Application
Single pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine VIP 8
VIP 8 ✓ verified
Application
Double pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine VIP 1000
VIP 1000 ✓ verified
Application
Double pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

LPLG 135 ✓ verified
Application
Double pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine VIP 18 S
VIP 18 S ✓ verified
Application
Double pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Palfinger Marine P-LD 24
P-LD 24 ✓ verified
Application
Double pivoting gravity davit for lifeboats
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, checking for corrosion, deformation, and loose fasteners
  • Area: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
    Check: Examination of wire ropes and sheaves for kinks, broken strands, and inadequate lubrication
  • Area: Inspection and testing of the static brake system (holding mechanism) for proper operation
    Check: Inspection and testing of the static brake system (holding mechanism) for proper operation
  • Area: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
    Check: Inspection and testing of the centrifugal brake system (lowering speed control) for smooth controlled descent
  • Area: Monthly operational testing of gravity lowering and electric hoisting mechanisms
    Check: Monthly operational testing of gravity lowering and electric hoisting mechanisms
  • Area: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
    Check: Annual comprehensive inspection and operational testing of on-load release gear (when applicable)
  • Area: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
    Check: Five-yearly complete disassembly and inspection of winches, gearboxes, and hydraulic components
  • Area: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
    Check: Five-yearly dynamic load testing at 1.1x Safe Working Load (SWL) to verify structural integrity
  • Area: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
    Check: Renewal of all wire rope falls in accordance with SOLAS Chapter III requirements
  • Area: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements
    Check: Verification of compliance with SOLAS Chapter III and IMO Life-Saving Appliance (LSA) Code requirements

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Fassmer

27 ✓ 1 verified
Fassmer Gravity SWL-5t unverified
Safe Working Load (t)
5
Fassmer Gravity SWL-10t unverified
Safe Working Load (t)
10
Fassmer Gravity SWL-15t unverified
Safe Working Load (t)
15
Fassmer Gravity SWL-20t unverified
Safe Working Load (t)
20
Fassmer Gravity SWL-25t unverified
Safe Working Load (t)
25
Fassmer Gravity SWL-30t unverified
Safe Working Load (t)
30
Fassmer Gravity SWL-40t unverified
Safe Working Load (t)
40
Fassmer Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Fassmer Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
Fassmer Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Fassmer Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
Fassmer Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Fassmer Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
Fassmer Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Fassmer Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
Fassmer Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Fassmer Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
Fassmer Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Fassmer Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
Fassmer Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Fassmer Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
Fassmer Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Fassmer Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
Fassmer Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Fassmer Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
Fassmer Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja
Fassmer FPD-D60 Pivot Gravity Davit
FPD-D60 Pivot Gravity Davit ✓ verified
Application
Davit-launched lifeboat system for Dragon 26/32/38/C/T totally enclosed lifeboats
Common Failures & Inspection Points
  • Area: Check davit structure and welds for cracks, deformation or corrosion
    Check: Check davit structure and welds for cracks, deformation or corrosion
  • Area: Inspection of all wire ropes, brake ropes and chains for wear, damage and correct tension
    Check: Inspection of all wire ropes, brake ropes and chains for wear, damage and correct tension
  • Area: Lubrication and functional test of all moving parts (bearings, bolts, pivot points)
    Check: Lubrication and functional test of all moving parts (bearings, bolts, pivot points)
  • Area: Check static brake and centrifugal brake under full load
    Check: Check static brake and centrifugal brake under full load
  • Area: Functional test of release gear (Duplex On-Load-Off-Load System) and lifting device
    Check: Functional test of release gear (Duplex On-Load-Off-Load System) and lifting device
  • Area: Check hydraulic/electric drive systems, pumps and valves
    Check: Check hydraulic/electric drive systems, pumps and valves
  • Area: Control remote control, safety switches and emergency shutdown
    Check: Control remote control, safety switches and emergency shutdown
  • Area: Annual maintenance by certified service partner (ABS, DNV, ClassNK approval required)
    Check: Annual maintenance by certified service partner (ABS, DNV, ClassNK approval required)

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

[08.08.2026] Datenblattlink entfernt (fehler 404): http://www.fassmer-marland.com/en/Product.aspx?c=03&id=24

Davit International

5 ✓ 5 verified
Davit International D-FO
D-FO ✓ verified
Application
Fixed deck gravity/electric lifeboat davit - lowering by gravity, hoisting by electric winch with manual backup
Common Failures & Inspection Points
  • Area: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
    Check: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
  • Area: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
    Check: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
  • Area: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
    Check: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
  • Area: Functional test of emergency lowering device and brake systems under load with weight test and drop test
    Check: Functional test of emergency lowering device and brake systems under load with weight test and drop test
  • Area: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
    Check: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
  • Area: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
    Check: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
  • Area: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
    Check: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
  • Area: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)
    Check: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Davit International D-RT
D-RT ✓ verified
Application
Roller track gravity lifeboat davit - pure gravity launching, track-guided pivot arm
Common Failures & Inspection Points
  • Area: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
    Check: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
  • Area: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
    Check: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
  • Area: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
    Check: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
  • Area: Functional test of emergency lowering device and brake systems under load with weight test and drop test
    Check: Functional test of emergency lowering device and brake systems under load with weight test and drop test
  • Area: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
    Check: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
  • Area: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
    Check: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
  • Area: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
    Check: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
  • Area: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)
    Check: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

D-BR ✓ verified
Application
Rescue boat davit with gravity lowering - hydraulic luffing, gravity descent
Common Failures & Inspection Points
  • Area: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
    Check: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
  • Area: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
    Check: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
  • Area: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
    Check: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
  • Area: Functional test of emergency lowering device and brake systems under load with weight test and drop test
    Check: Functional test of emergency lowering device and brake systems under load with weight test and drop test
  • Area: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
    Check: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
  • Area: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
    Check: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
  • Area: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
    Check: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
  • Area: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)
    Check: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Davit International D-NP.SP
D-NP.SP ✓ verified
Application
Normal pivot semi-gravity lifeboat davit with hydraulic stored power
Common Failures & Inspection Points
  • Area: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
    Check: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
  • Area: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
    Check: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
  • Area: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
    Check: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
  • Area: Functional test of emergency lowering device and brake systems under load with weight test and drop test
    Check: Functional test of emergency lowering device and brake systems under load with weight test and drop test
  • Area: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
    Check: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
  • Area: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
    Check: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
  • Area: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
    Check: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
  • Area: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)
    Check: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Davit International D-NP.MP
D-NP.MP ✓ verified
Application
Normal pivot semi-gravity lifeboat davit with mechanical stored power (spring)
Common Failures & Inspection Points
  • Area: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
    Check: Check the functionality of all safety locks and locking mechanisms in the stowed position and lowered position
  • Area: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
    Check: Visual inspection of all steel structures for corrosion, cracks and wear marks, especially at welds and bolted connections
  • Area: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
    Check: Test rope control for wear marks, damage, elongation and compliance with SOLAS requirements regarding safe working load and breaking strength
  • Area: Functional test of emergency lowering device and brake systems under load with weight test and drop test
    Check: Functional test of emergency lowering device and brake systems under load with weight test and drop test
  • Area: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
    Check: Check all pins, rollers and sliding surfaces for correct function, lubrication and wear (particularly on track systems such as D-RT)
  • Area: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
    Check: Check fan and pump play in hydraulic or electric drive systems; test of pressure and tightness
  • Area: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
    Check: Test manual emergency hand crank function and test of redundancy / locking mechanism during operation
  • Area: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)
    Check: Complete test according to SOLAS LSA Code including dynamic load and drop load (minimum 1.5–2.0× design load)

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Global Davit GmbH

4 ✓ 4 verified
Global Davit GmbH GS(L)P.FP
GS(L)P.FP ✓ verified
Application
Lifeboat and combined life-/rescue boat launch and recovery with gravity-powered turning-out
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, including checks for corrosion, misalignment, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, including checks for corrosion, misalignment, deformation, and loose fasteners
  • Area: Monthly functional testing: Move lifeboats to launch position and verify davit and winch operation
    Check: Monthly functional testing: Move lifeboats to launch position and verify davit and winch operation
  • Area: Wire rope and sheave examination for kinks, visible broken strands, signs of inadequate lubrication, and overall condition
    Check: Wire rope and sheave examination for kinks, visible broken strands, signs of inadequate lubrication, and overall condition
  • Area: Centrifugal brake and static brake inspection (gravity davit models) - verify brake pad condition and replace if worn (typically during annual servicing)
    Check: Centrifugal brake and static brake inspection (gravity davit models) - verify brake pad condition and replace if worn (typically during annual servicing)
  • Area: Examination of hydraulic systems including accumulators, pressure control systems, and wave compensation units (for hydraulic models)
    Check: Examination of hydraulic systems including accumulators, pressure control systems, and wave compensation units (for hydraulic models)
  • Area: Examination of electrical systems including motor condition, control panels, starter boxes, and push-button stations
    Check: Examination of electrical systems including motor condition, control panels, starter boxes, and push-button stations
  • Area: Structural examination of davit arm welds, connections, foundation mounting points, and gusset plate reinforcements for cracks and stress marks
    Check: Structural examination of davit arm welds, connections, foundation mounting points, and gusset plate reinforcements for cracks and stress marks
  • Area: Five-yearly load testing with certified documentation, structural assessment, and recertification by classification societies
    Check: Five-yearly load testing with certified documentation, structural assessment, and recertification by classification societies

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Global Davit GmbH GS(L)P.FPh
GS(L)P.FPh ✓ verified
Application
Lifeboat launch and recovery with hydraulic-powered turning-out and turning-in (low-profile design)
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, including checks for corrosion, misalignment, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, including checks for corrosion, misalignment, deformation, and loose fasteners
  • Area: Monthly functional testing: Move lifeboats to launch position and verify davit and winch operation
    Check: Monthly functional testing: Move lifeboats to launch position and verify davit and winch operation
  • Area: Wire rope and sheave examination for kinks, visible broken strands, signs of inadequate lubrication, and overall condition
    Check: Wire rope and sheave examination for kinks, visible broken strands, signs of inadequate lubrication, and overall condition
  • Area: Centrifugal brake and static brake inspection (gravity davit models) - verify brake pad condition and replace if worn (typically during annual servicing)
    Check: Centrifugal brake and static brake inspection (gravity davit models) - verify brake pad condition and replace if worn (typically during annual servicing)
  • Area: Examination of hydraulic systems including accumulators, pressure control systems, and wave compensation units (for hydraulic models)
    Check: Examination of hydraulic systems including accumulators, pressure control systems, and wave compensation units (for hydraulic models)
  • Area: Examination of electrical systems including motor condition, control panels, starter boxes, and push-button stations
    Check: Examination of electrical systems including motor condition, control panels, starter boxes, and push-button stations
  • Area: Structural examination of davit arm welds, connections, foundation mounting points, and gusset plate reinforcements for cracks and stress marks
    Check: Structural examination of davit arm welds, connections, foundation mounting points, and gusset plate reinforcements for cracks and stress marks
  • Area: Five-yearly load testing with certified documentation, structural assessment, and recertification by classification societies
    Check: Five-yearly load testing with certified documentation, structural assessment, and recertification by classification societies

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Global Davit GmbH RHP.HC
RHP.HC ✓ verified
Application
Fast rescue boat launch and recovery with hydraulic-powered A-frame pivot davit
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, including checks for corrosion, misalignment, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, including checks for corrosion, misalignment, deformation, and loose fasteners
  • Area: Monthly functional testing: Move lifeboats to launch position and verify davit and winch operation
    Check: Monthly functional testing: Move lifeboats to launch position and verify davit and winch operation
  • Area: Wire rope and sheave examination for kinks, visible broken strands, signs of inadequate lubrication, and overall condition
    Check: Wire rope and sheave examination for kinks, visible broken strands, signs of inadequate lubrication, and overall condition
  • Area: Centrifugal brake and static brake inspection (gravity davit models) - verify brake pad condition and replace if worn (typically during annual servicing)
    Check: Centrifugal brake and static brake inspection (gravity davit models) - verify brake pad condition and replace if worn (typically during annual servicing)
  • Area: Examination of hydraulic systems including accumulators, pressure control systems, and wave compensation units (for hydraulic models)
    Check: Examination of hydraulic systems including accumulators, pressure control systems, and wave compensation units (for hydraulic models)
  • Area: Examination of electrical systems including motor condition, control panels, starter boxes, and push-button stations
    Check: Examination of electrical systems including motor condition, control panels, starter boxes, and push-button stations
  • Area: Structural examination of davit arm welds, connections, foundation mounting points, and gusset plate reinforcements for cracks and stress marks
    Check: Structural examination of davit arm welds, connections, foundation mounting points, and gusset plate reinforcements for cracks and stress marks
  • Area: Five-yearly load testing with certified documentation, structural assessment, and recertification by classification societies
    Check: Five-yearly load testing with certified documentation, structural assessment, and recertification by classification societies

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

Global Davit GmbH FRC Launch and Recovery System (L.A.R.S.)
FRC Launch and Recovery System (L.A.R.S.) ✓ verified
Application
Fast Response Craft (FRC) launch and recovery system for stern-mounted vessel slipway
Common Failures & Inspection Points
  • Area: Weekly visual inspection of davit structural integrity, including checks for corrosion, misalignment, deformation, and loose fasteners
    Check: Weekly visual inspection of davit structural integrity, including checks for corrosion, misalignment, deformation, and loose fasteners
  • Area: Monthly functional testing: Move lifeboats to launch position and verify davit and winch operation
    Check: Monthly functional testing: Move lifeboats to launch position and verify davit and winch operation
  • Area: Wire rope and sheave examination for kinks, visible broken strands, signs of inadequate lubrication, and overall condition
    Check: Wire rope and sheave examination for kinks, visible broken strands, signs of inadequate lubrication, and overall condition
  • Area: Centrifugal brake and static brake inspection (gravity davit models) - verify brake pad condition and replace if worn (typically during annual servicing)
    Check: Centrifugal brake and static brake inspection (gravity davit models) - verify brake pad condition and replace if worn (typically during annual servicing)
  • Area: Examination of hydraulic systems including accumulators, pressure control systems, and wave compensation units (for hydraulic models)
    Check: Examination of hydraulic systems including accumulators, pressure control systems, and wave compensation units (for hydraulic models)
  • Area: Examination of electrical systems including motor condition, control panels, starter boxes, and push-button stations
    Check: Examination of electrical systems including motor condition, control panels, starter boxes, and push-button stations
  • Area: Structural examination of davit arm welds, connections, foundation mounting points, and gusset plate reinforcements for cracks and stress marks
    Check: Structural examination of davit arm welds, connections, foundation mounting points, and gusset plate reinforcements for cracks and stress marks
  • Area: Five-yearly load testing with certified documentation, structural assessment, and recertification by classification societies
    Check: Five-yearly load testing with certified documentation, structural assessment, and recertification by classification societies

Typ-universelle Inspektionspunkte fuer Davits (verifiziert, 2026-06).

d-i davit international-hische

43
d-i davit international-hische d-i Type A SWL-5t
d-i Type A SWL-5t unverified
Safe Working Load (t)
5
d-i davit international-hische d-i Type A SWL-10t
d-i Type A SWL-10t unverified
Safe Working Load (t)
10
d-i davit international-hische d-i Type A SWL-15t
d-i Type A SWL-15t unverified
Safe Working Load (t)
15
d-i davit international-hische d-i Type A SWL-20t
d-i Type A SWL-20t unverified
Safe Working Load (t)
20
d-i davit international-hische d-i Type A SWL-25t
d-i Type A SWL-25t unverified
Safe Working Load (t)
25
d-i davit international-hische d-i Type A SWL-30t
d-i Type A SWL-30t unverified
Safe Working Load (t)
30
d-i davit international-hische d-i Type B SWL-5t
d-i Type B SWL-5t unverified
Safe Working Load (t)
5
d-i davit international-hische d-i Type B SWL-10t
d-i Type B SWL-10t unverified
Safe Working Load (t)
10
d-i davit international-hische d-i Type B SWL-15t
d-i Type B SWL-15t unverified
Safe Working Load (t)
15
d-i davit international-hische d-i Type B SWL-20t
d-i Type B SWL-20t unverified
Safe Working Load (t)
20
d-i davit international-hische d-i Type B SWL-25t
d-i Type B SWL-25t unverified
Safe Working Load (t)
25
d-i davit international-hische d-i Type B SWL-30t
d-i Type B SWL-30t unverified
Safe Working Load (t)
30
d-i davit international-hische d-i Type C SWL-5t
d-i Type C SWL-5t unverified
Safe Working Load (t)
5
d-i davit international-hische d-i Type C SWL-10t
d-i Type C SWL-10t unverified
Safe Working Load (t)
10
d-i davit international-hische d-i Type C SWL-15t
d-i Type C SWL-15t unverified
Safe Working Load (t)
15
d-i davit international-hische d-i Type C SWL-20t
d-i Type C SWL-20t unverified
Safe Working Load (t)
20
d-i davit international-hische d-i Type C SWL-25t
d-i Type C SWL-25t unverified
Safe Working Load (t)
25
d-i davit international-hische d-i Type C SWL-30t
d-i Type C SWL-30t unverified
Safe Working Load (t)
30
d-i davit international-hische d-i Type D SWL-5t
d-i Type D SWL-5t unverified
Safe Working Load (t)
5
d-i davit international-hische d-i Type D SWL-10t
d-i Type D SWL-10t unverified
Safe Working Load (t)
10
d-i davit international-hische d-i Type D SWL-15t
d-i Type D SWL-15t unverified
Safe Working Load (t)
15
d-i davit international-hische d-i Type D SWL-20t
d-i Type D SWL-20t unverified
Safe Working Load (t)
20
d-i davit international-hische d-i Type D SWL-25t
d-i Type D SWL-25t unverified
Safe Working Load (t)
25
d-i davit international-hische d-i Type D SWL-30t
d-i Type D SWL-30t unverified
Safe Working Load (t)
30
d-i davit international-hische d-i davit international-hische Gravity SWL-2t-B
d-i davit international-hische Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-3t-B
d-i davit international-hische Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-5t-B
d-i davit international-hische Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-7t-B
d-i davit international-hische Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-10t-B
d-i davit international-hische Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-12t-B
d-i davit international-hische Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-15t-B
d-i davit international-hische Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-18t-B
d-i davit international-hische Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-20t-B
d-i davit international-hische Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-22t-B
d-i davit international-hische Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-25t-B
d-i davit international-hische Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-28t-B
d-i davit international-hische Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-30t-B
d-i davit international-hische Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-35t-B
d-i davit international-hische Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-40t-B
d-i davit international-hische Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-45t-B
d-i davit international-hische Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-50t-B
d-i davit international-hische Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-55t-B
d-i davit international-hische Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
d-i davit international-hische d-i davit international-hische Gravity SWL-60t-B
d-i davit international-hische Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja

Norsafe / Survitec

29
Norsafe / Survitec Norsafe Gravity SWL-2t
Norsafe Gravity SWL-2t unverified
Safe Working Load (t)
2
Norsafe / Survitec Norsafe Gravity SWL-5t
Norsafe Gravity SWL-5t unverified
Safe Working Load (t)
5
Norsafe / Survitec Norsafe Gravity SWL-10t
Norsafe Gravity SWL-10t unverified
Safe Working Load (t)
10
Norsafe / Survitec Norsafe Gravity SWL-15t
Norsafe Gravity SWL-15t unverified
Safe Working Load (t)
15
Norsafe Gravity SWL-20t unverified
Safe Working Load (t)
20
Norsafe / Survitec Norsafe Gravity SWL-25t
Norsafe Gravity SWL-25t unverified
Safe Working Load (t)
25
Norsafe Gravity SWL-30t unverified
Safe Working Load (t)
30
Norsafe Gravity SWL-40t unverified
Safe Working Load (t)
40
Norsafe Gravity SWL-50t unverified
Safe Working Load (t)
50
Norsafe Gravity SWL-60t unverified
Safe Working Load (t)
60
Norsafe / Survitec Norsafe Gravity SWL-2t-B
Norsafe Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-3t-B
Norsafe Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-5t-B
Norsafe Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-7t-B
Norsafe Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-10t-B
Norsafe Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-12t-B
Norsafe Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-15t-B
Norsafe Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-18t-B
Norsafe Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-20t-B
Norsafe Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-22t-B
Norsafe Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
Norsafe Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-28t-B
Norsafe Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
Norsafe Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-35t-B
Norsafe Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-40t-B
Norsafe Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-45t-B
Norsafe Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-50t-B
Norsafe Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Norsafe / Survitec Norsafe Gravity SWL-55t-B
Norsafe Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
Norsafe Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja

Schat-Harding / Survitec

29
Schat-Harding Gravity SWL-2t unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Schat-Harding Gravity SWL-5t unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Schat-Harding / Survitec Schat-Harding Gravity SWL-10t
Schat-Harding Gravity SWL-10t unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Schat-Harding Gravity SWL-15t unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Schat-Harding Gravity SWL-20t unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Schat-Harding Gravity SWL-25t unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Schat-Harding Gravity SWL-30t unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Schat-Harding Gravity SWL-40t unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Schat-Harding Gravity SWL-50t unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Schat-Harding Gravity SWL-60t unverified
Safe Working Load (t)
60
SOLAS Approved
ja
Schat-Harding / Survitec Schat-Harding Gravity SWL-2t-B
Schat-Harding Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Schat-Harding Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
Schat-Harding Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Schat-Harding / Survitec Schat-Harding Gravity SWL-7t-B
Schat-Harding Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
Schat-Harding / Survitec Schat-Harding Gravity SWL-10t-B
Schat-Harding Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Schat-Harding Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
Schat-Harding Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Schat-Harding / Survitec Schat-Harding Gravity SWL-18t-B
Schat-Harding Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
Schat-Harding Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Schat-Harding Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
Schat-Harding Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Schat-Harding / Survitec Schat-Harding Gravity SWL-28t-B
Schat-Harding Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
Schat-Harding Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Schat-Harding Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
Schat-Harding Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Schat-Harding Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
Schat-Harding Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Schat-Harding / Survitec Schat-Harding Gravity SWL-55t-B
Schat-Harding Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
Schat-Harding / Survitec Schat-Harding Gravity SWL-60t-B
Schat-Harding Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja

Jiangyin Neptune

27
NPT Gravity SWL-5t unverified
Safe Working Load (t)
5
NPT Gravity SWL-10t unverified
Safe Working Load (t)
10
NPT Gravity SWL-15t unverified
Safe Working Load (t)
15
NPT Gravity SWL-20t unverified
Safe Working Load (t)
20
NPT Gravity SWL-25t unverified
Safe Working Load (t)
25
NPT Gravity SWL-30t unverified
Safe Working Load (t)
30
NPT Gravity SWL-40t unverified
Safe Working Load (t)
40
NPT Gravity SWL-50t unverified
Safe Working Load (t)
50
Jiangyin Neptune Jiangyin Neptune Gravity SWL-2t-B
Jiangyin Neptune Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
Jiangyin Neptune Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja

Global Davit

25
Global Davit Global Gravity SWL-5t
Global Gravity SWL-5t unverified
Safe Working Load (t)
5
Global Davit Global Gravity SWL-10t
Global Gravity SWL-10t unverified
Safe Working Load (t)
10
Global Davit Global Gravity SWL-15t
Global Gravity SWL-15t unverified
Safe Working Load (t)
15
Global Davit Global Gravity SWL-20t
Global Gravity SWL-20t unverified
Safe Working Load (t)
20
Global Davit Global Gravity SWL-25t
Global Gravity SWL-25t unverified
Safe Working Load (t)
25
Global Davit Global Gravity SWL-30t
Global Gravity SWL-30t unverified
Safe Working Load (t)
30
Global Davit Global Davit Gravity SWL-2t-B
Global Davit Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-3t-B
Global Davit Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-5t-B
Global Davit Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-7t-B
Global Davit Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-10t-B
Global Davit Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-12t-B
Global Davit Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-15t-B
Global Davit Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-18t-B
Global Davit Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-20t-B
Global Davit Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-22t-B
Global Davit Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-25t-B
Global Davit Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-28t-B
Global Davit Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-30t-B
Global Davit Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-35t-B
Global Davit Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-40t-B
Global Davit Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-45t-B
Global Davit Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-50t-B
Global Davit Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-55t-B
Global Davit Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
Global Davit Global Davit Gravity SWL-60t-B
Global Davit Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja

Survival Systems International

24
SSI Gravity SWL-2t unverified
Safe Working Load (t)
2
SSI Gravity SWL-5t unverified
Safe Working Load (t)
5
SSI Gravity SWL-10t unverified
Safe Working Load (t)
10
SSI Gravity SWL-15t unverified
Safe Working Load (t)
15
SSI Gravity SWL-20t unverified
Safe Working Load (t)
20
Survival Systems International Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Survival Systems International Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
Survival Systems International Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Survival Systems International Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
Survival Systems International Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Survival Systems International Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
Survival Systems International Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Survival Systems International Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
Survival Systems International Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Survival Systems International Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
Survival Systems International Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Survival Systems International Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
Survival Systems International Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Survival Systems International Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
Survival Systems International Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Survival Systems International Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
Survival Systems International Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Survival Systems International Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
Survival Systems International Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja

Hatecke

19
Hatecke Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Hatecke Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
Hatecke Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Hatecke Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
Hatecke Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Hatecke Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
Hatecke Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Hatecke Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
Hatecke Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Hatecke Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
Hatecke Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Hatecke Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
Hatecke Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Hatecke Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
Hatecke Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Hatecke Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
Hatecke Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Hatecke Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
Hatecke Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja

Vestdavit

19
Vestdavit Vestdavit Gravity SWL-2t-B
Vestdavit Gravity SWL-2t-B unverified
Safe Working Load (t)
2
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-3t-B
Vestdavit Gravity SWL-3t-B unverified
Safe Working Load (t)
3
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-5t-B
Vestdavit Gravity SWL-5t-B unverified
Safe Working Load (t)
5
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-7t-B
Vestdavit Gravity SWL-7t-B unverified
Safe Working Load (t)
7
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-10t-B
Vestdavit Gravity SWL-10t-B unverified
Safe Working Load (t)
10
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-12t-B
Vestdavit Gravity SWL-12t-B unverified
Safe Working Load (t)
12
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-15t-B
Vestdavit Gravity SWL-15t-B unverified
Safe Working Load (t)
15
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-18t-B
Vestdavit Gravity SWL-18t-B unverified
Safe Working Load (t)
18
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-20t-B
Vestdavit Gravity SWL-20t-B unverified
Safe Working Load (t)
20
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-22t-B
Vestdavit Gravity SWL-22t-B unverified
Safe Working Load (t)
22
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-25t-B
Vestdavit Gravity SWL-25t-B unverified
Safe Working Load (t)
25
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-28t-B
Vestdavit Gravity SWL-28t-B unverified
Safe Working Load (t)
28
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-30t-B
Vestdavit Gravity SWL-30t-B unverified
Safe Working Load (t)
30
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-35t-B
Vestdavit Gravity SWL-35t-B unverified
Safe Working Load (t)
35
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-40t-B
Vestdavit Gravity SWL-40t-B unverified
Safe Working Load (t)
40
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-45t-B
Vestdavit Gravity SWL-45t-B unverified
Safe Working Load (t)
45
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-50t-B
Vestdavit Gravity SWL-50t-B unverified
Safe Working Load (t)
50
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-55t-B
Vestdavit Gravity SWL-55t-B unverified
Safe Working Load (t)
55
SOLAS Approved
ja
Vestdavit Vestdavit Gravity SWL-60t-B
Vestdavit Gravity SWL-60t-B unverified
Safe Working Load (t)
60
SOLAS Approved
ja

MacGregor

2
MacGregor G-type: fast rescue craft davit
Model Number
G Type Fast Rescue Craft Davit
MacGregor (Harding) Gravity Davit Type A
Gravity Davit Type A
up to 50 persons · Lifeboat / Rescue Boat Launching · gravity davit
Type
gravity
Solas
ja
Safe Working Load (kg)
5000
Common Failures & Inspection Points
  • Wire rope corrosion
  • Brake lining wear
  • Limit switch failure
  • Grease nipple blockage
Service: Annual load test (1.1x SWL). Wire rope renewal every 5 years.
Spare Parts: Spare parts via MacGregor (Harding) or authorized distribution partners. Lead time: 2-6 weeks.
Strengths
  • No external power required – fully operable by gravity and manual control
  • Simple mechanical design reduces maintenance and downtime
  • SOLAS‑compliant with built‑in load‑test factor (1.1 × SWL)
  • High reliability in harsh marine environments
  • Compact footprint suitable for many cargo vessel deck layouts
Weaknesses
  • Limited to the rated SWL of 5 t – not suitable for larger lifeboats
  • Requires sufficient clearance and deck space for swing‑out operation
  • Manual handling of wire rope can be labor‑intensive during drills
  • Brake lining wear and limit‑switch failures are known recurring issues
  • Wire‑rope corrosion demands strict renewal schedule (every 5 years)
Typical Vessels: TankerBulk CarrierContainer ShipGeneral Cargo VesselPassenger Ferry
Certifications: SOLASDNV
Decision Guide: Choose if you need a low‑maintenance, power‑independent launch system for lifeboats up to 5 t on vessels where deck space allows a swing‑out davit and reliability is paramount. Avoid if the vessel requires higher load capacity, rapid automated deployment, or has restricted deck clearance that precludes gravity‑type operation.
Use Cases: Commonly installed on cargo ships and ferries for launching SOLAS‑required lifeboats; also used on offshore supply vessels for rescue boat deployment where power availability may be limited.

Jiangyin Beihai

1
BH Gravity Davit
up to 40 persons · Lifeboat / Rescue Boat Launching · gravity davit
Type
gravity
Solas
ja
Origin
China
Common Failures & Inspection Points
  • Wire rope deterioration
  • Brake lining wear
  • Paint/coating failure
Service: CCS approved, budget option
Spare Parts: Spare parts via Jiangyin Beihai or authorized distribution partners. Lead time: 2-6 weeks.
Strengths
  • No external power required – operates solely on gravity and manual effort
  • SOLAS compliant and CCS approved, meeting key regulatory requirements
  • Budget‑friendly compared with hydraulic or pneumatic alternatives
  • Simple construction reduces installation complexity and maintenance training
Weaknesses
  • Wire rope is susceptible to corrosion and deterioration if not inspected regularly
  • Brake lining wear can limit safe operation and requires periodic replacement
  • Paint/coating failures have been reported in harsh marine environments
  • Limited lifting capacity relative to powered davit systems, unsuitable for heavy rescue craft
Typical Vessels: Coastal passenger ferriesSmall cargo vesselsOffshore supply boatsTraining shipsWorkboats
Certifications: SOLASCCS
Decision Guide: Choose if you need a low‑cost, power‑free lifeboat launch system on a vessel where lifting requirements are modest and regulatory compliance (SOLAS, CCS) is essential. Avoid if the ship requires high‑capacity or rapid automated launches, operates in highly corrosive conditions without robust maintenance programs, or when budget allows for more advanced hydraulic/pneumatic davits.
Use Cases: Commonly installed on small to medium‑size passenger ferries and offshore supply vessels operating near coastlines, where crew can manually operate the davit for lifeboat deployment during drills or emergencies. Also used on training ships to teach manual launch procedures.

Nishi-F

1
Nishi-F Gravity Davit NGD
up to 50 persons · Lifeboat / Rescue Boat Launching · gravity davit
Type
gravity
Solas
ja
Origin
Japan
Common Failures & Inspection Points
  • Wire rope corrosion
  • Brake wear
  • Sheave seizure
Service: ClassNK approved. Standard on Japanese-built tonnage.
Spare Parts: Spare parts via Nishi-F or authorized distribution partners. Lead time: 2-6 weeks.
Strengths
  • Simple mechanical operation – no hydraulic or electric power required
  • ClassNK approved and SOLAS compliant, facilitating regulatory acceptance
  • Compact footprint suitable for vessels with limited deck space
  • Low initial cost and reduced routine maintenance compared to powered davits
  • Widely installed on Japanese‑built tonnage, indicating proven service record
Weaknesses
  • Manual operation can be slower than hydraulic/pneumatic systems in emergency situations
  • Known failure modes include wire‑rope corrosion, brake wear and sheave seizure, requiring diligent inspection
  • Limited lifting capacity relative to larger powered davits; not ideal for very heavy lifeboats
  • Crew fatigue may increase on repeated launches due to manual effort
  • May require more frequent lubrication and rope replacement in harsh marine environments
Typical Vessels: Bulk CarrierOil TankerContainer ShipGeneral Cargo VesselRo‑Ro Ferry
Certifications: SOLASClassNK Approval
Decision Guide: Choose if: you need a reliable, low‑maintenance davit on a vessel where space and power are limited, and the lifeboat size fits within the NGD's capacity. Avoid if: rapid high‑speed launch of heavy lifeboats is required or you prefer fully powered systems for reduced crew effort.
Use Cases: The NGD is typically installed on Japanese‑built merchant ships to provide a dependable means of launching SOLAS‑required lifeboats and life rafts during emergencies, especially where deck space constraints preclude larger powered davits.

TTS Marine

1
TTS Marine TTS Gravity Davit GD-40
TTS Gravity Davit GD-40
40 persons · Lifeboat / Rescue Boat Launching · gravity davit
Type
gravity
Solas
ja
Common Failures & Inspection Points
  • Wire corrosion
  • Winch brake degradation
  • Limit switch failure
Service: Annual survey requirements per SOLAS
Spare Parts: Spare parts via TTS Marine or authorized distribution partners. Lead time: 2-6 weeks.
Strengths
  • Simple, power‑free operation – reliable in all weather conditions
  • Low maintenance with few moving parts
  • SOLAS compliant and approved for small to medium lifeboats (up to ~4 t)
  • Compact installation footprint suitable for limited deck space
  • Robust construction with corrosion‑resistant fittings
Weaknesses
  • Limited lifting capacity compared with hydraulic or electric davits
  • Manual handling may require additional crew effort during launch/recovery
  • Reach and swing radius are fixed, restricting placement of larger craft
  • Requires regular inspection of wire ropes and brake mechanisms to prevent corrosion‑related failures
Typical Vessels: Passenger ferryCoastal cruise vesselOffshore supply boatWorkboat / tugLarge yacht
Certifications: SOLAS
Decision Guide: Choose if you need a reliable, low‑maintenance davit for small lifeboats on vessels with limited power availability and space. Avoid if the vessel requires high‑capacity or fully automated launch systems for larger rescue craft.
Use Cases: Commonly installed on regional ferries, offshore supply vessels, and workboats where a compact, gravity‑operated system provides quick lifeboat deployment without reliance on hydraulic or electric power.