Turbocharger · Turbochargers
Hitachi HT-S HT-71S — HT-S, 30000 kW max.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Compressor water washing | Daily to weekly, or as indicated by performance degradation (e.g., reduced boost pressure, increased differential pressure across compressor). |
|---|---|
| Turbine water washing (if fitted) | Every 250-500 running hours, or as per manufacturer's recommendations based on fuel type and exhaust gas quality. |
| Bearing inspection and renewal | 8,000 - 12,000 running hours (or every 1-2 years), often coinciding with intermediate engine overhauls. Includes inspection of thrust and journal bearings, and renewal of sealing rings. |
| Major overhaul (rotor out, balancing) | 16,000 - 24,000 running hours (or every 3-5 years), involving complete disassembly, cleaning, inspection of all components, rotor balancing, and renewal of all wear parts. |
| Air filter cleaning/renewal | Every 500 - 1000 running hours, or more frequently in dusty environments. |
Typical intervals for this design class, not the manufacturer’s figures for your model. The manufacturer’s manual is binding.
| Rotor axial play | New: 0.15 - 0.30 mm. Wear limit: 0.40 - 0.60 mm (refer to specific Hitachi manual for exact values). |
|---|---|
| Rotor radial play | New: 0.05 - 0.15 mm. Wear limit: 0.20 - 0.30 mm (refer to specific Hitachi manual for exact values). |
| Blade erosion/damage | Any visible cracks, significant pitting, or material loss exceeding 10-15% of original blade thickness is typically cause for replacement or repair. |
| Casing cracks | Any visible crack on pressure-retaining parts (turbine casing, compressor casing) is unacceptable and requires repair or replacement. |
| Bearing clearances | Journal bearing clearance: New 0.08-0.12 mm, wear limit 0.20-0.25 mm (indicative, consult manual). |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Class surveyors typically check the turbocharger's external condition for leaks, cracks, and proper securing. They will review maintenance records, running hours, and performance logs to ensure compliance with planned maintenance systems. During major surveys (e.g., 5-year special survey), an internal inspection of the turbocharger (rotor out) is often required to assess the condition of blades, bearings, and casings, ensuring structural integrity and safe operation. Verification of overspeed trip functionality and alarm settings is also a common check. The surveyor will ensure that critical spares are onboard as per class requirements.
Estimated lifetime: 80,000 - 120,000 running hours before major component replacement (e.g., new rotor assembly) or end-of-life, assuming regular maintenance and adherence to overhaul schedules.
Free of charge — send us your request for Hitachi equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, Hitachi first.
Tell us what you need for this Hitachi HT-S HT-71S — a part, a service call, a second opinion. Are you Hitachi? Claim this brand page.
Service engineer? Write the day report for this HT-S HT-71S in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.