Turbocharger · Turbochargers
Hitachi HT-C HT-65C — HT-C, 40000 kW max.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Daily/Weekly | Visual inspection, performance monitoring, compressor water washing (if fitted). |
|---|---|
| 4,000 - 8,000 hours | Compressor dry cleaning, minor inspection of compressor side, oil filter replacement. |
| 12,000 - 16,000 hours | Bearing inspection and/or replacement (journal and thrust), full cleaning of compressor and turbine sides, nozzle ring inspection. |
| 24,000 - 36,000 hours | Major overhaul including rotor balancing, comprehensive inspection of all components, replacement of worn parts (e.g., seals, bearings, nozzle ring segments), casing crack detection. |
| Rotor axial clearance | Refer to manufacturer's service manual for exact values. Typically, new: 0.15 - 0.30 mm; wear limit: +0.10 mm from new value. |
|---|---|
| Rotor radial clearance | Refer to manufacturer's service manual for exact values. Typically, new: 0.30 - 0.60 mm; wear limit: +0.15 mm from new value. |
| Bearing wear | Visual inspection for scoring, pitting, discoloration, and excessive play. Replacement if any significant damage or out-of-spec clearances. |
| Blade tip clearance | Visual inspection for rubbing marks on casing. Specific measurement if possible, but often assessed during overhaul. Excessive clearance reduces efficiency. |
| Nozzle ring opening | Visual inspection for erosion, corrosion, or blockage. Erosion can increase opening, reducing efficiency. Blockage reduces gas flow. |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Class surveyors typically review the turbocharger's maintenance records, running hours, and previous survey reports. They will conduct an external visual inspection for leaks, cracks, and secure mounting. During scheduled overhauls, they will verify bearing clearances (axial and radial), inspect the condition of the compressor and turbine sides (fouling, damage), and confirm the integrity of the casings. Functionality of safety devices such as overspeed trips and alarms will be checked. Compliance with the manufacturer's recommended service schedule and the availability of critical spare parts onboard are also key points of verification.
Estimated lifetime: 100,000 - 150,000 hours for main structural components (casings, rotor shaft) with regular maintenance and replacement of wear parts (bearings, seals, nozzle ring, etc.).
Free of charge — send us your request for Hitachi equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, Hitachi first.
Tell us what you need for this Hitachi HT-C HT-65C — a part, a service call, a second opinion. Are you Hitachi? Claim this brand page.
Service engineer? Write the day report for this HT-C HT-65C in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.