"> Alfa Laval Smit Smit Gas FIN (Smit Flue Gas)
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 80 verified suppliers & service companies for Alfa Laval Smit in the Maritime Network Find suppliers →
Alfa Laval Smit

Smit Gas FIN (Smit Flue Gas)

Alfa Laval Smit Smit Gas FIN (Smit Flue Gas) — Crude Oil Tanker, Product Tanker, FPS.

Alfa Laval Smit Smit Gas FIN (Smit Flue Gas)

Components & Design

Component data being added…

Technical Data

Capacity 3,000-30,000 m³/h
Pressure 0.1 bar(g)
Type Saturated flue gas inert gas system
Fuel Source Heavy Fuel Oil (HFO) boiler flue gas
Dew Point Dry saturated
Introduced Enhanced version 2004 with improved particle removal and compact design

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Combustion Chamber Deterioration, Burner Erosion, Soot/Scale Buildup

Visual inspection of combustion chamber for corrosion, erosion, scale deposits, or soot; verify Ultramizing® burner nozzles for proper spray pattern and flame stability; check fuel oil atomization quality; minimum annual inspection, more frequent if operating in harsh marine conditions

Oxygen Analyzer Calibration Drift, Sensor Malfunction, False Readings

Calibrate oxygen analyzer per manufacturer schedule (typical: quarterly to semi-annually); verify actual oxygen levels match analyzer display; check for sensor contamination or fouling; ensure blow-back system (if equipped) functions properly; test analyzer accuracy across full range (0.5-4% O₂ depending on system type)

Scrubber Fouling, Demisters Blockage, Particulate Accumulation, Corrosion

Inspect scrubber nozzles, cooling pipes, floats, sensors and demisters for fouling or scaling; verify cooling spray system operates uniformly; check for salt crystal formation (especially in water evaporation zones); inspect for corrosion on contact surfaces (SUS 316 material); clean demisters and verify gas-liquid separation; recommended twice yearly or per manufacturer schedule

Dew Point Control Failure, Moisture Ingress (Critical for LNG/LPG Systems)

Monitor dew point readings continuously (target: below -45°C for LNG/LPG, dry saturated for flue gas systems); test cooler and chiller effectiveness; inspect dryer unit redundancy (LNG/LPG systems); verify salt-crystal-free spray system functionality; check condensate drain lines for blockage; perform annual dew point trending analysis

Seawater Cooling System Corrosion, Leakage, Blockage (FU/FIN Systems)

Inspect seawater inlet/outlet for scale or debris; check for leaks in combustion chamber cooling jackets (particularly FU-type where seawater cooling is used); evaluate biofouling in cooling pipes; consider FU-type air-cooled burner alternative if corrosion issues persist; verify pump/fan operation; half-yearly inspection recommended, full dry dock overhaul per IMO intervals (typically 5-10 years)

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #149253 · ✓ still in production