Turbocharger · Turbochargers
The NA295 295M is a high‑capacity turbocharger from Napier (Wabtec) designed to boost two‑stroke slow‑speed marine diesel engines up to about 20 MW, offering a compact multi‑stage design for maximum pressure ratio.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Water washing (compressor side) | Daily to weekly, depending on fuel quality and operating conditions. |
|---|---|
| Minor inspection (visual, cleaning of compressor/turbine) | 500-1000 running hours. |
| Intermediate inspection (bearings, seals, nozzle ring check) | 4,000-8,000 running hours or annually. |
| Major overhaul (rotor removal, bearing replacement, full cleaning, balancing) | 12,000-16,000 running hours or every 2-3 years. |
| Axial bearing clearance (thrust) | New: 0.10-0.15 mm; Max wear limit: 0.20-0.25 mm. |
|---|---|
| Radial bearing clearance (journal) | New: 0.15-0.25 mm; Max wear limit: 0.30-0.35 mm. |
| Shaft run-out (at bearing journals) | Max allowable: 0.03 mm. |
| Nozzle ring erosion/burning | Significant increase in gas passage area (e.g., >10% from new) leading to performance drop; visual signs of severe erosion or cracking. |
| Turbine/Compressor blade damage | Any visible cracks, significant erosion, or foreign object damage (FOD) requires immediate attention and potential replacement. |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Class surveyors typically focus on the overall operational integrity and safety of the turbocharger. They will check for external signs of leaks (oil, exhaust gas), excessive vibration, and general cleanliness. Documentation of maintenance, overhauls, and any repairs (especially rotor balancing or casing repairs) is crucial. Operational parameters like boost pressure, exhaust gas temperatures, and lube oil conditions will be reviewed. The surveyor may request to witness bearing clearance checks if the unit is opened for maintenance during the survey period, and will verify the functionality of safety devices such as the overspeed trip.
Estimated lifetime: 12,000-16,000 hours (before major overhaul, assuming proper maintenance and component replacement as per schedule)
Free of charge — send us your request for Napier (Wabtec) equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, Napier (Wabtec) first.
Tell us what you need for this Napier (Wabtec) NA295 295M — a part, a service call, a second opinion. Are you Napier (Wabtec)? Claim this brand page.
Service engineer? Write the day report for this NA295 295M in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.