MacGregor

10
MacGregor CW Combined Windlass/Mooring (Family)
Model Family
MacGregor CW
Equipment Type
combined
Drive Type
electro-hydraulic
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

MacGregor CW-400
Model Family
MacGregor CW
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
400
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

MacGregor CW-500
Model Family
MacGregor CW
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
500
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

MacGregor CW-600
Model Family
MacGregor CW
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
600
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

MacGregor CW-800
Model Family
MacGregor CW
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
800
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

MacGregor CW-1000
Model Family
MacGregor CW
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
1000
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

MacGregor CW-1200
Model Family
MacGregor CW
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
1200
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

MacGregor CW-1500
Model Family
MacGregor CW
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
1500
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

Pusnes Combined Windlass/Mooring
Pull 100-500 kN · Anchor Chain + Mooring Lines
Type
Combined Anchor Windlass / Mooring Winch
Size Range
  • CWM-100
  • CWM-200
  • CWM-350
  • CWM-500
Power range (kW)
  • 30
  • 250
Drive Type
Electric / Hydraulic
Construction
Cast steel, wildcat + warping drum + split drum, band brake
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

Service: Band brake inspection every 6 months. Wildcat measurement at drydock. Clutch adjustment per OEM manual. Auto-tension calibration annually.
Spare Parts: MacGregor/Cargotec (ehem. Pusnes). Lead time: 3-6 weeks. Brake linings onboard.
TWISTLOCK FOUNDATION, TF-2/COMBI, COMBINED TOP PLATE
Pull force per Hersteller-Datenblatt · Anchor Chain / Mooring Lines
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

Service: Bremsbelag-Inspektion alle 6 Monate. Getriebeöl-Wechsel alle 2 Jahre. Wildcat-Messung bei Dockung. Motor-Isolationstest jährlich.
Spare Parts: MacGregor Finland Oy: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.

Towimor

8
Towimor TW-CMS Combined Mooring System (Family) unverified
Model Family
TW-CMS
Equipment Type
combined
Drive Type
electro-hydraulic
TW-CMS-100 unverified
Model Family
TW-CMS
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
100
TW-CMS-150 unverified
Model Family
TW-CMS
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
150
TW-CMS-200 unverified
Model Family
TW-CMS
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
200
TW-CMS-300 unverified
Model Family
TW-CMS
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
300
TW-CMS-400 unverified
Model Family
TW-CMS
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
400
TW-CMS-500 unverified
Model Family
TW-CMS
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
500
TW-CMS-600 unverified
Model Family
TW-CMS
Equipment Type
combined
Drive Type
electro-hydraulic
Pull capacity (kN)
600

DMT Marine Equipment (South Korea)

1
DMT Combined Windlass/Mooring
Pull 100-400 kN · Anchor Chain + Mooring Lines
Type
Combined Anchor Windlass / Mooring Winch
Size Range
  • DMT-CWM-100
  • DMT-CWM-200
  • DMT-CWM-300
Power range (kW)
  • 30
  • 180
Drive Type
Electric / Hydraulic
Construction
Cast steel, planetary gear
Common Failures & Inspection Points
  • Band brake quality varies
  • Casting quality inconsistency
  • Clutch adjustment issues
Service: Standard maintenance, kürzere Intervalle als europäische OEMs empfohlen.
Spare Parts: DMT Busan. Lead time: 2-4 weeks Korea.

Kawasaki Heavy Industries (Japan)

1
KCW Combined Windlass/Mooring
Pull 100-400 kN · Anchor Chain + Mooring Lines
Type
Combined Anchor Windlass / Mooring Winch
Size Range
  • KCW-100
  • KCW-200
  • KCW-300
  • KCW-400
Power range (kW)
  • 30
  • 200
Drive Type
Electric
Construction
Cast steel, planetary gear, wildcat + drum
Common Failures & Inspection Points
  • Band brake wear
  • Planetary gear bearing fatigue
  • Motor insulation issues
Service: Standard combined windlass/mooring maintenance per KHI manual.
Spare Parts: KHI Japan. Lead time: 3-5 weeks Asia.

Kongsberg

1
Combined Windlass/Mooring Winch
Pull 100-500 kN · Anchor Chain + Mooring Lines
Type
Combined Anchor Windlass / Mooring Winch
Size Range
  • RR-CWM-100
  • RR-CWM-200
  • RR-CWM-350
Power range (kW)
  • 30
  • 200
Drive Type
Electric / Hydraulic
Construction
Cast steel, wildcat + warping drum, band brake
Common Failures & Inspection Points
  • Band brake wear
  • Wildcat pocket erosion
  • Hydraulic motor seal failure
Service: Standard combined windlass/mooring maintenance.
Spare Parts: Kongsberg Maritime. Lead time: 3-6 weeks.

MAN Energy Solutions

1
Type CWM Combined Windlass/Mooring
Pull 100-500 kN · Anchor Chain + Mooring Lines
Type
Combined Anchor Windlass / Mooring Winch
Size Range
  • CWM-100
  • CWM-200
  • CWM-350
  • CWM-500
Power range (kW)
  • 30
  • 250
Drive Type
Electric / Hydraulic
Construction
Cast steel, wildcat + warping drum, band brake
Common Failures & Inspection Points
  • Band brake wear
  • Worm gear wear on older models
  • Motor insulation degradation from deck exposure
  • Clutch wear between functions
Service: Standard combined windlass/mooring maintenance. Band brake every 6 months.
Spare Parts: MAN PrimeServ. Lead time: 3-6 weeks.

Towimor (Poland)

1
Combined Windlass/Mooring Winch
Pull 50-200 kN · Anchor Chain + Mooring Lines
Type
Combined Anchor Windlass / Mooring Winch
Size Range
  • TW-CWM-50
  • TW-CWM-100
  • TW-CWM-200
Power range (kW)
  • 15
  • 100
Drive Type
Electric / Hydraulic
Construction
Cast steel, worm/planetary gear
Common Failures & Inspection Points
  • Band brake wear
  • Gear oil leakage
  • Motor bearing failure
Service: Standard maintenance.
Spare Parts: Towimor Torun. Lead time: 2-4 weeks Europe.