"> ZHEJIANG ENERGY MARINE ENVIRONMENTAL TECHNOLOGY CO.,LTD MPUSOx/U-2400 installed onboard BULGARIA (IMO: 9968475)
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
ZHEJIANG ENERGY MARINE ENVIRONMENTAL TECHNOLOGY CO.,LTD

MPUSOx/U-2400 installed onboard BULGARIA (IMO: 9968475)

MPUSOx/U-2400 installed onboard BULGARIA (IMO: 9968475) by ZHEJIANG ENERGY MARINE ENVIRONMENTAL TECHNOLOGY CO.,LTD. DNV MED certificate MEDG00001B9.

Inspector Detail

Common issues

  • Scrubber tower internal corrosion (acid attack) at packing, demister, and shell in wash-water-wetted zones
  • Demister/mist eliminator fouling or damage causing carryover into the exhaust stream
  • Wash water pump or spray nozzle fouling/wear reducing spray coverage and SOx removal efficiency
  • Effluent treatment unit fouling or reduced separation efficiency (hybrid-mode operation)
  • CEMS sensor (pH, SO2/CO2 ratio, turbidity, PAH) drift or fouling giving unreliable compliance readings
  • Overboard discharge line and valve corrosion or scaling
  • Exhaust gas bypass damper seizure or leakage past the seal

Inspection checklist

  • Verify CEMS calibration (SO2/CO2 ratio, PAH, turbidity, pH) is current
  • Inspect scrubber tower internals (packing, demister) for corrosion/fouling at dry-dock or internal access
  • Check wash water pump and spray nozzle condition and coverage pattern
  • Inspect bypass damper operation and seal condition
  • Check the effluent treatment unit function and sludge/residue handling arrangements (hybrid mode)
  • Verify wash water discharge quality against the applicable MARPOL Annex VI Scrubber Guidelines limits
  • Check coating/lining condition in wash-water-wetted areas
  • Confirm the EGCS record book (operation, exceedance events) is complete and current

Service intervals

CEMS sensor calibration per manufacturer, typically every 3-12 months depending on sensor type
Demister/packing inspection at dry-dock or annually where accessible
Wash water pump/nozzle inspection every 2000-4000 running hours or annually
Effluent treatment unit service (hybrid mode) per manufacturer's schedule, typically annual
Coating/lining survey at each dry-docking

Typical wear limits

Tower shell/lining corrosion allowance governed by the approved coating/lining system and class scantling requirement - confirm against approved drawings, no generic figure applies
Demister element pressure drop renew when differential pressure exceeds the manufacturer's clean-condition baseline by a significant margin - confirm against the MPUSOx/U-2400 manual
Wash water nozzle spray pattern renew nozzles when spray coverage visibly degrades or SOx removal efficiency trends downward against manufacturer's baseline testing

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Wash water spray nozzles
  • Demister/mist eliminator elements
  • CEMS sensor modules (SO2, CO2, pH, turbidity, PAH)
  • Wash water pump seals/impeller
  • Bypass damper actuator/seal kit
  • Effluent treatment consumables/filters for hybrid operation

Safety

  • Acidic wash water presents a corrosive-fluid contact hazard - PPE required for internal or effluent-system work
  • Confined space entry for scrubber tower internal inspection requires gas-freeing and ventilation checks
  • Bypass damper failure could misroute hot, corrosive exhaust gas - verify damper interlocks before internal entry
  • Unauthorised wash water discharge or sensor bypass is a MARPOL Annex VI compliance violation, not just a maintenance issue

Class survey

Exhaust gas cleaning systems are a Continuous Survey Machinery item under MARPOL Annex VI/the applicable class EGC notation: continuous monitoring of wash water discharge and CEMS parameters is reviewed, discharge exceedance events in the record book are checked, and internal survey of the scrubber unit (corrosion, lining) is carried out at renewal or dry-docking. Confirm the unit remains within the approved monitoring scheme of the applicable EGCS Guidelines revision, and that the DNV MED certificate (MEDG00001B9) matches the installed unit.

Estimated lifetime: The scrubber tower structure is generally designed for the vessel's operating life, with lining/coating renewal tied to dry-docking (typically 5-yearly); wear components (nozzles, demister elements, sensors) are renewed on a running-hours or condition basis well before that - confirm against manufacturer documentation for this specific unit.

Components & Design

Component data being added…

Technical Data

imo approved True

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

DNV type approval

Verified against the DNV Approval Finder — the certificate below is issued by DNV, not by us.

Certificate
MEDG00001B9
Approved as
On board exhaust gas cleaning systems
Open the certificate at DNV →
Equipment Model #44250 · ✓ still in production