"> Alfa Laval Aalborg (Denmark) Mission Series (Composite Boiler)
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 114 verified suppliers & service companies for Alfa Laval Aalborg (Denmark) in the Maritime Network Find suppliers →
Alfa Laval Aalborg (Denmark)

Mission Series (Composite Boiler)

The Mission series is Alfa Laval Aalborg's composite boiler, combining oil firing and exhaust gas heat recovery in one unit. At sea, the boiler uses waste heat from the main engine; in port or during slow steaming, the oil firing switches on. Space-saving compared to separate auxiliary boiler + economizer. Standard on modern medium-sized vessels.

200-5,000 kg/h steam
Capacity
Steam (Oil-Fired + Exhaust Gas Heat Recovery)
Medium

Components & Design

Component data being added…

Technical Data

type Composite Boiler (Oil-Fired + Exhaust Gas Section)
variant count approx 4
period start year 1995
drive type Oil-Fired + Exhaust Gas Economiser
construction Fire tube + exhaust gas sections in one unit, vertical
boiler type Alfa Laval Aalborg Combined Oil/Thermal-Oil Heater (Composite)

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Thermoölabbau (Oxidation, thermische Zersetzung)

Take oil samples and check acid number (TAN), viscosity, colour; check temperature exceedances in dataset; monitor electronic controllers for setpoint drift (±1°C target exceeded = oil degradation risk)

Coil fouling and corrosion (deposits, slagging)

Visually inspect coils through removable cover for coating, fly ash, corrosion spots; perform differential pressure measurement inlet/outlet (elevated pressure = contamination); measure tube diameter ultrasonic wall thickness if suspected

Feuerraum-Wärmeschutz & Refraktärbeschichtung (Risse, Abplatzungen, thermische Schäden)

Visual inspection of furnace inner walls for cracks in refractory brickwork, particularly front/burner area; check quarls and air registers for slagging/scale; cracks with dark closure (not closed during operation) must be repaired

Brenner & Brennstoff-Zerstäubung (Zerstäuberqualität, Flammenform, Ruß-Ablagerung)

Visually inspect burner condition (mounted/swingable); observe flame shape (stable, no soot discharge); check nozzle holes for contamination; excessive soot deposits opposite burner indicate need for adjustment

Druckprüfung & Klassifizierungsbesichtigung (Hydrostatic Test, Klassifizierungs-Compliance)

Perform hydropneumatic pressure test after maintenance (no stress >90% yield strength); coordinate inspection progress & certificate with classification society (DNV, ABS, LR); accumulator test on new installation (pressure build-up <10% nominal value during 15-min continuous operation)

Sicherheitsventile & Wasserstandsglas (Ventilhub-Einstellung, Dichtprüfung, Schauglas-Durchblasen)

Safety valves must open at max. 3% above operating pressure, settle at 5% below operating pressure; annual inspections required; perform water level indicator blowdown to verify correct water level indication; minimum 2 independent water level measuring instruments required (SOLAS)

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Soot blowing daily when exhaust gas section active. Burner maintenance weekly. Feedwater treatment daily. Exhaust gas tube inspection at annual survey. Hydraulic test per Class requirements.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Alfa Laval Aalborg network. Lead time: 2-4 weeks for burner parts, 6-10 weeks for tubes.
Equipment Model #37754 · ✓ still in production