"> WinGD RTA58T
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 1 verified suppliers & service companies for WinGD in the Maritime Network Find suppliers →
WinGD

RTA58T

The WinGD RTA58T (RT‑flex58T) is a low‑speed, two‑stroke marine diesel main engine delivering up to ~30 MW per unit, distinguished by its large bore (580 mm), electronic common‑rail injection and fuel flexibility.

WinGD RTA58T
Per Hersteller-Datenblatt
Capacity
HFO/MDO/MGO/VLSFO
Medium

Engine Specifications

580 mm
Bore
2-stroke
Stroke Type

Inspector Detail ✓ verified

Designation decoded

RTA stands for the Sulzer mechanically controlled series, 58 for 580 mm bore, T for long-stroke/tanker variant.

Background

The RTA58T is a medium-size mechanically controlled 2-stroke engine with 580 mm bore. Fitted to Panamax bulkers and tankers of the 1990s-2000s. Purely mechanical control with camshaft, injection pump and mechanical exhaust valve. Sulzer-specific bore (MAN: 600 mm).

Calculated metrics

Inspector checklist

Running Gear & Tribology
  • Cylinder liners: 580 mm bore. Long-term wear.
  • Piston rings: Older generation.
  • Crosshead bearings: Long-term fatigue.
Mechanical Control
  • Camshaft: Cam profile, gear, chain/gearwheel.
  • Injection pump: Plunger/barrel wear, delivery quantity.
  • Exhaust valve: Mechanical. Pushrod, roller tappet.
  • VIT: Free movement.
Fuel System
  • Injection pump: Delivery pressure and timing.
  • Nozzles: Opening pressure.
  • Cat fines: <10 ppm.
Sealing Systems
  • Stuffing box: Drainage.
  • Exhaust valve: Spindle and seat.

Logbook reference values

Parameter Expected Deviation means
Exhaust gas temperature after cylinder 355-415 degrees C at 75% MCR Spread >25 degrees C -> pump/timing
Pmax 125-155 bar Check VIT and pump
Injection pump delivery pressure >800 bar Pressure drop -> pump worn

Common Failure Modes

Fuel injection pump wear
Symptoms: SFOC increase, power loss
Causes: Long-term wear, Cat fines
Preventive: Overhaul at 12,000-16,000 h.
Camshaft wear
Symptoms: Timing drift
Causes: Fatigue
Preventive: Check cam profile.
Liner end-of-life
Symptoms: Wear limit
Causes: 20+ years
Preventive: Trend analysis.

Expert tips

  • 💡 RTA58T with 580 mm bore is Sulzer-specific — do not confuse spare parts with the MAN 600 mm.
  • 💡 Mechanical VIT on RTA: If the VIT piston sticks, the Pmax curve versus load will be off — a typical finding on older engines.

Related components

Turbocharger (ABB) Camshaft Injection pumps Cylinder oil dosing Fuel separator

Classification & regulatory

IMO Tier I. EEXI for existing vessels.

Reference content for inspector orientation. Always verify against manufacturer's manual, latest service letters and class society requirements.

Components & Design

Component data being added…

Technical Data

Bohrung/Hub-Verhältnis RT-flex58T 4.17 (2416/580 mm)
Bohrung/Hub-Verhältnis RT-flex50 4.1 (2050/500 mm)
MEP (mittl. Druck) RT-flex58T @ R1 21,0 bar @ 105 RPM
MEP RT-flex50 @ R1 21,0 bar @ 124 RPM
SFOC RT-flex58T @ R1 not verifiable (manufacturer specification in Installation Manuals)
SFOC RT-flex50-D @ R1 169 g/kWh (optimiert von 171)
Leistung pro Zylinder RT-flex58T-E 2350 kW/Zyl @ 105 RPM
Leistung pro Zylinder RT-flex50-D 1745 kW/Zyl @ 124 RPM
Steuerung Elektronisch gesteuert Common-Rail-System mit WECS
Injektoren pro Zylinder 3 unabhängig gesteuerte Injektoren

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Fretting on exhaust valve actuator pipes between interface and hydraulic pressure pipe; caused by faulty washer installation or tight fit
Injection system failures in compliance with fuel standards: ICU malfunction and fuel leaks at high-pressure lines (up to 70% unplanned engine shutdowns
High-temperature scavenge air and scavenge air cooler blockage due to salt deposits/fouling; leads to increasing scavenge temperature, higher exhaust
Inspector check point scavenge space temperature monitoring: sensors above scavenge openings required; alarm at temperature above reference value

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Follow Sulzer/WinGD PMS. Mechanical injection timing, camshaft drive, scavenge space and liner condition require regular checks.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Maintain fuel pump elements, exhaust valves, fuel injectors, piston rings, cylinder cover seals and starting air valve kits.
Equipment Model #36776 · discontinued