"> WinGD RT-flex82C
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 1 verified suppliers & service companies for WinGD in the Maritime Network Find suppliers →
WinGD

RT-flex82C

The WinGD RT-flex82C is a low‑speed, two‑stroke marine diesel engine delivering up to 54 MW, known for its large 820 mm bore and flexible fuel capability.

Per Hersteller-Datenblatt
Capacity
HFO/MDO/MGO/VLSFO
Medium

Engine Specifications

820 mm
Bore
2-stroke
Stroke Type

Inspector Detail ✓ verified

Designation decoded

RT-flex steht für Sulzer/Wärtsilä Common-Rail-Baureihe, 82 für 820 mm Bohrung, C für die C-Version (höhere Leistungsdichte).

Background

Der RT-flex82C ist ein großer 2-Takt-Motor mit 820 mm Bohrung für VLCCs und große Containerschiffe. C-Version = höherer MEP. Vorgänger des WinGD X82-B. Viele RT-flex82C sind noch auf VLCCs der 2005–2015-Generation in Betrieb.

Calculated metrics

Inspector checklist

Laufzeug & Tribologie
  • Zylinderlaufbuchsen: 820 mm Bohrung — große Buchse mit Langzeit-Verschleißhistorie.
  • Kolbenringe: Ältere Generation. Verfügbarkeit.
  • Kreuzkopf-Lager: Große Kolbenmasse. Langzeit-Ermüdung.
  • Kolbenkrone: NDT zwingend bei Altmotoren.
Common-Rail-System
  • Common-Rail: Langzeit-Verschleiß. HP-Pumpen und Injektoren.
  • WECS: Ersatzteil-Support.
Fundamentierung
  • Motorfundament: Schwerer Motor. Langzeit-Chocking und Bolzen.
  • Alignment: Deflection historisch vergleichen.

Logbook reference values

Parameter Expected Deviation means
Abgastemperatur nach Zylinder 335–390 °C bei 75% MCR Spread >20 °C → Injektor/Kompression
Pmax 148–178 bar Einzelzylinder >7 bar ab → Diagnose
Kreuzkopf-Lager-Temperatur 55–70 °C >75 °C → Inspektion

Common Failure Modes

Liner-End-of-Life
Symptoms: Verschleißlimit
Causes: normaler Verschleiß nach >40.000 h
Preventive: Trend-Analyse. Ersatzliner bestellen.
Kolbenkronen-Rissbildung
Symptoms: Abgastemperatur-Anstieg
Causes: thermische Ermüdung
Preventive: NDT.
WECS-Obsoleszenz
Symptoms: Modulausfall
Causes: Alterung
Preventive: Ersatzteilbestand.

Expert tips

  • 💡 RT-flex82C auf 15+ Jahre alten VLCCs: Ganzheitliche Betrachtung — Motor, Schiffsstruktur, Rohrleitungen und Hilfssysteme altern gemeinsam.
  • 💡 VLSFO-Kompatibilität bei Altmotoren systematisch evaluieren.

Related components

Turbolader (ABB, 2+ TC) Common-Rail-HP-Pumpen WECS-Steuerung Grundlager/Kurbelwelle Motorfundament

Classification & regulatory

IMO Tier I/II. EEXI. MARPOL Annex I bei VLCC.

Reference content for inspector orientation. Always verify against manufacturer's manual, latest service letters and class society requirements.

Components & Design

Component data being added…

Technical Data

Bore 820 mm (verified: Wärtsilä news 2005-2007, Yumpu technical data)
Stroke (C/T) 2646 mm / 3375 mm (verified: Scribd technical data)
Power Range 21,720 - 54,240 kW at 87-102 rpm (verified: Wärtsilä official news 2007)
Mean Effective Pressure 20.0/19.0 bar (R1/R1+) (verified: Yumpu technical data)
Cylinder Oil Feed Rate (PLS) 0.7-0.8 g/kWh at 50-100% load (verified: Wartsila news 2006)
Fuel Injection Pressure up to 1000 bar common-rail (verified: Wärtsilä technical specs)
Servo Oil Pressure up to 200 bar (verified: Yumpu technical data)
Scavenging Type Uniflow with exhaust valves (verified: Yumpu specs)

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Cold corrosion and cylinder liner peeling from piston ring degradation due to inadequate cylinder oil BN (70 BN insufficient, switch to 100 BN Mobilgard 5100 re

Monitor piston ring top land deposits, check piston ring coating condition for peeling, measure chrome coating integrity via borescope

Auxiliary blower bearing seizure and winding burnout from prolonged low-speed operation when scavenge pressure drops below minimum (indicates turbocharger fault

Check blower motor insulation resistance quarterly, verify auxiliary blower is NOT used at sea speeds, monitor scavenge pressure trend, inspect fuel tank documentation for bunker quality

Common-rail fuel injection system ICU (Injection Control Unit) malfunction and high-pressure fuel leakage (70% of unexpected stoppages per service bulletins), f

Monitor fuel leakage tank level daily, inspect high-pressure pipe metallic hose encasing for rupture/pinhole leaks, test ICU solenoid valve operation, verify fuel injection timing accuracy

Low-viscosity fuel causing fuel pump timing disruption and altered injection advance due to internal leakage between plunger and spill port

Monitor fuel viscosity (ISO 3104 at 40°C) before each bunker, verify fuel meets specification (3.5-5.5 cSt typical), monitor fuel injection timing electronically

Exhaust valve seat erosion and carbon accumulation under transient/low-load operation, exacerbated by fuel sulphur content and inadequate blow-by lubrication ti

Schedule exhaust valve inspection every 3 years (overhaul interval), photograph valve seat seat via borescope for erosion patterns, monitor exhaust temperature distribution across cylinders

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Condition-based cylinder maintenance using scavenge inspection and drain-oil trend. Common rail and control oil system checks per PMS.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Maintain rail/control valves, fuel injectors, exhaust valves, piston ring packs, bearing shells and seals.
Equipment Model #36773 · discontinued