Hilfsdiesel (Generatorsatz) · Hilfsdiesel
MTU Onsite Energy Series 60 G-12cyl — Common Rail, 12 cyl × 165mm bore, 1800 rpm, MGO, 1320 kW.
Haben Sie das Herstellerdatenblatt zu diesem Modell? Schicken Sie es mit dem Anfrageformular — wir prüfen es und nennen die Quelle.
| Lube Oil & Filters | 500-750 hours (or based on oil analysis) |
|---|---|
| Fuel Filters (Primary/Secondary) | 500-750 hours |
| Air Filters | 1000-2000 hours (or as per differential pressure) |
| Cooling Water Analysis | Annually or 1000 hours |
| Fuel Injector Inspection/Overhaul | 6000-8000 hours |
| Turbocharger Overhaul | 8000-12000 hours |
| Top Overhaul (Cylinder Heads, Valves) | 12000-16000 hours |
| Major Overhaul | 24000-30000 hours |
| Cylinder Liner Wear (max diameter increase) | 0.6 - 0.8 mm |
|---|---|
| Piston Ring Gap (top ring, max) | 1.0 - 1.2 mm |
| Crankshaft Deflection (max deviation between adjacent webs) | 0.05 - 0.10 mm |
| Main Bearing Clearance (max) | 0.15 - 0.20 mm |
| Connecting Rod Bearing Clearance (max) | 0.15 - 0.20 mm |
| Valve Seat Recession (max) | 1.5 - 2.0 mm |
| Turbocharger Rotor Axial Play (max) | 0.15 - 0.25 mm |
Die Bereiche sind für diese Bauklasse typisch. Maßgeblich sind stets die Herstellerunterlagen zur jeweiligen Seriennummer.
Class surveyors typically focus on: 1. Documentation: Review of engine logbooks, maintenance records, oil analysis reports, and fuel quality documentation. 2. Performance: Verification of engine performance parameters under load (e.g., exhaust gas temperatures, lube oil pressure, cooling water temperatures, fuel pressure) against manufacturer's specifications. 3. Safety Devices: Functional testing of overspeed trip, low lube oil pressure shutdown, high cooling water temperature shutdown, and emergency stop mechanisms. 4. Alarms: Checking the functionality of all critical alarms on the local and bridge panels. 5. Visual Inspection: Thorough inspection for leaks (fuel, oil, water), corrosion, loose fastenings (especially foundation bolts), condition of exhaust lagging, and general cleanliness. 6. Fuel System Integrity: Inspection of high-pressure fuel lines, double-walled piping (if fitted), and fuel oil filters for leaks or damage. 7. Cooling System: Examination of cooling pumps, heat exchangers, expansion tank, and associated piping for integrity and leaks. 8. Vibration: Assessment of engine mounts and couplings for signs of wear or degradation. 9. Fire Safety: Verification of remote shutdowns for fuel and lube oil pumps, and proper operation of engine room fire flaps.
Geschätzte Lebensdauer: 24000-30000 hours before major overhaul, with potential for 50000+ hours with proper maintenance and subsequent overhauls.
Kostenlos — senden Sie uns Ihre Anfrage zu MTU Onsite Energy-Ausrüstung. Unser Team prüft sie und antwortet per E-Mail.
Weitere Modelle desselben Ausrüstungstyps, zuerst MTU Onsite Energy.
Sagen Sie uns, was Sie für diesen MTU Onsite Energy Series 60 G-12cyl benötigen — ein Ersatzteil, einen Serviceeinsatz, eine zweite Meinung. Sind Sie MTU Onsite Energy? Diese Herstellerseite beanspruchen.
Servicetechniker? Schreiben Sie den Tagesbericht für diesen Series 60 G-12cyl in OceanSphere Work — Fotos, Stunden und Teile, als PDF für den Reeder. 14 Tage kostenlos testen →
Ja. Technische Daten, Dokumente und Servicehinweise zu diesem Modell sind ohne Konto lesbar. Ein Konto bringt gespeicherte Suchen und Anfragen dazu, es nimmt nichts weg.
Ja. Nennen Sie uns Hersteller, Modell und Bedarf — ein Mensch liest jede Anfrage und antwortet per E-Mail.
Schicken Sie uns das Typenschild oder den richtigen Wert. Wir prüfen ihn gegen das Herstellerdatenblatt oder den Klassifikationsdatensatz und aktualisieren die Seite.