Turbolader · Turbolader
MAN ES Turbocharging NA-LV NA70-LV — NA-LV, 5500 kW max.
Haben Sie das Herstellerdatenblatt zu diesem Modell? Schicken Sie es mit dem Anfrageformular — wir prüfen es und nennen die Quelle.
| Bearing inspection (visual and measurement) | 8,000 - 12,000 operating hours |
|---|---|
| Bearing replacement (journal and thrust) | 16,000 - 24,000 operating hours |
| Rotor cleaning (water wash) | 250 - 500 operating hours or as indicated by performance drop |
| Major overhaul (dismantling, inspection, replacement of wear parts) | 24,000 - 36,000 operating hours or 3-5 years |
| Air filter element replacement | 1,000 - 2,000 operating hours or as indicated by differential pressure |
| Rotor axial play | New: 0.15 - 0.25 mm; Max allowed: 0.40 - 0.50 mm |
|---|---|
| Rotor radial play | New: 0.05 - 0.10 mm; Max allowed: 0.20 - 0.25 mm |
| Journal bearing clearance | Specific to design, typically 0.08 - 0.15 mm (new); Max allowed: +0.05 mm over new |
| Turbine/Compressor blade tip clearance | 0.4 - 0.8 mm (critical for efficiency and avoiding rubbing) |
| Nozzle ring passage area | Check for reduction due to erosion or deposits (visual assessment, comparison with new) |
Die Bereiche sind für diese Bauklasse typisch. Maßgeblich sind stets die Herstellerunterlagen zur jeweiligen Seriennummer.
Class surveyors will typically verify the following: 1. Review of maintenance records, including routine inspections, bearing replacements, and major overhauls, ensuring compliance with manufacturer's recommendations. 2. Examination of engine logbook data for turbocharger performance parameters (boost pressure, exhaust gas temperatures before/after turbine, turbocharger RPM, oil pressures/temperatures) to identify any deviations or trends. 3. External visual inspection for structural integrity of the casing, mounting arrangements, insulation, and absence of oil or gas leaks. 4. Verification of turbocharger vibration levels, either from onboard monitoring systems or by portable vibration analysis. 5. Check for proper functioning of safety devices and alarms related to the turbocharger (e.g., high exhaust gas temperature, low oil pressure, overspeed trip if fitted). 6. Confirmation of air filter condition and cleanliness. 7. For Tier III applications, any associated exhaust gas treatment or recirculation systems interacting with the turbocharger will also be scrutinized for proper operation and integration.
Geschätzte Lebensdauer: 24,000 - 36,000 hours before major overhaul; main casing and rotor shaft can last 100,000+ hours with proper maintenance and component replacement.
Kostenlos — senden Sie uns Ihre Anfrage zu MAN ES Turbocharging-Ausrüstung. Unser Team prüft sie und antwortet per E-Mail.
Weitere Modelle desselben Ausrüstungstyps, zuerst MAN ES Turbocharging.
Sagen Sie uns, was Sie für diesen MAN ES Turbocharging NA-LV NA70-LV benötigen — ein Ersatzteil, einen Serviceeinsatz, eine zweite Meinung. Sind Sie MAN ES Turbocharging? Diese Herstellerseite beanspruchen.
Servicetechniker? Schreiben Sie den Tagesbericht für diesen NA-LV NA70-LV in OceanSphere Work — Fotos, Stunden und Teile, als PDF für den Reeder. 14 Tage kostenlos testen →
Ja. Technische Daten, Dokumente und Servicehinweise zu diesem Modell sind ohne Konto lesbar. Ein Konto bringt gespeicherte Suchen und Anfragen dazu, es nimmt nichts weg.
Ja. Nennen Sie uns Hersteller, Modell und Bedarf — ein Mensch liest jede Anfrage und antwortet per E-Mail.
Schicken Sie uns das Typenschild oder den richtigen Wert. Wir prüfen ihn gegen das Herstellerdatenblatt oder den Klassifikationsdatensatz und aktualisieren die Seite.