Turbocharger · Turbochargers
The Napier TPS57 is a high‑performance turbocharger designed for 4‑stroke medium‑speed marine diesel engines up to about 4500 kW, featuring advanced turbine geometry for improved boost pressure and fuel efficiency.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Routine visual inspection & performance check | 250 - 500 running hours |
|---|---|
| Compressor wash (water wash) | As required, typically 250 - 1000 running hours (depending on air quality and engine operation) |
| Turbine wash (granulate or water wash) | As required, typically 500 - 2000 running hours (depending on fuel quality and engine operation) |
| Bearing inspection & replacement (journal and thrust) | 8,000 - 12,000 running hours (or annually, whichever comes first) |
| Major overhaul (full disassembly, inspection, NDT, replacement of wear parts) | 24,000 - 36,000 running hours |
Typical intervals for this design class, not the manufacturer’s figures for your model. The manufacturer’s manual is binding.
| Rotor Radial Clearance (Journal Bearings) | New: 0.15 - 0.25 mm; Wear Limit: 0.35 - 0.45 mm (check specific OEM manual) |
|---|---|
| Rotor Axial Clearance (Thrust Bearing) | New: 0.08 - 0.12 mm; Wear Limit: 0.18 - 0.22 mm (check specific OEM manual) |
| Compressor Blade Tip Clearance | Specific to model, typically 0.3 - 0.6 mm. Any contact or significant increase indicates issues. |
| Turbine Blade Tip Clearance | Specific to model, typically 0.5 - 0.8 mm. Any contact or significant increase indicates issues. |
| Bearing Housing Ovality/Distortion | Typically less than 0.05 mm deviation from true circularity. |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
The class surveyor will typically verify the turbocharger's general condition, ensuring no visible leaks, excessive vibration, or abnormal noises. They will check the maintenance records to confirm adherence to maker's recommended service intervals, especially for bearing replacements and major overhauls. Insulation integrity on hot surfaces will be checked. Performance parameters (boost pressure, exhaust gas temperatures) recorded in the logbook will be reviewed for consistency. Any alarms or trips related to the turbocharger (e.g., overspeed, high bearing temperature) will be checked for functionality and proper settings. Documentation such as the maker's manual, previous survey reports, and repair certificates will be requested.
Estimated lifetime: 24,000 - 36,000 hours before major overhaul (with proper maintenance, main components like casings and rotor shaft can last 100,000+ hours with regular replacement of wear parts)
Free of charge — send us your request for Napier (Wabtec) equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, Napier (Wabtec) first.
Tell us what you need for this Napier (Wabtec) TPS TPS57 — a part, a service call, a second opinion. Are you Napier (Wabtec)? Claim this brand page.
Service engineer? Write the day report for this TPS TPS57 in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.