Aalborg Industries (Alfa Laval)

Mission OS

The Mission OS is a compact vertical auxiliary oil‑fired composite boiler delivering up to 6 t/h of steam at 9 or 18 bar, intended for port‑side operation and low‑load hotel services on merchant vessels.

Aalborg Industries (Alfa Laval) Mission OS
5-15 t/h steam
Capacity
Oil → Steam
Medium

Inspector Detail

Common issues

  • Burner flame instability or failure to light off cleanly
  • Soot deposit buildup on fire-side tube surfaces reducing thermal efficiency
  • Water-side scale formation from inadequate feed water treatment
  • Refractory cracking or spalling around the burner throat
  • Safety valve seat leakage or set pressure drift
  • Low water level cutout malfunction
  • Fuel oil heater or viscosity control issues when firing HFO

Inspection checklist

  • Burner flame pattern and ignition sequence check, including pre-purge
  • Safety valve lift and reseat test
  • Low-low water level alarm and cutout function test
  • Boiler water chemical treatment sampling (alkalinity, phosphate, chlorides)
  • Soot blowing effectiveness on fire-side tubes
  • Refractory condition at the burner throat
  • Water level gauge glass cross-check against remote indication
  • Exhaust gas economizer fouling check, if fitted
  • Relief and vent valve operation

Service intervals

Water treatment chemical dosing/sampling typically weekly
Soot blowing daily to weekly depending on fuel and load
Safety valve function test monthly for lift check, annual for full set-pressure test
Internal inspection (waterside/fireside) typically annual, tied to the class Continuous Survey Machinery scheme
Burner nozzle/atomiser cleaning per OEM, commonly every few hundred running hours

Typical wear limits

Boiler tube wall thickness class societies typically require renewal once wall thickness has thinned by roughly 10-15% below original design thickness for boilers of this class, but the applicable minimum must be taken from the vessel's class rules and the boiler's own drawings, not assumed
Safety valve set pressure drift should not exceed the tolerance stated on the valve's test certificate

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Burner nozzle/atomiser
  • Ignition electrodes
  • Safety valve spring and seat set
  • Water level gauge glass and gaskets
  • Low water alarm float or probe
  • Refractory repair material for the burner throat

Safety

  • Pressurised steam and hot surfaces throughout the boiler and steam lines
  • Boiler damage or explosion risk from a low water condition if the cutouts fail - low water alarm testing is safety-critical
  • Fuel oil under pressure and heated to high temperature on HFO firing
  • Furnace/combustion chamber explosion risk if the pre-ignition purge sequence is bypassed
  • Confined space hazards during internal waterside/fireside inspection

Class survey

Falls under Continuous Survey Machinery for boilers; class typically requires internal waterside/fireside examination, witnessed safety valve testing, and review of water treatment logs at each boiler survey.

Estimated lifetime: Composite auxiliary boilers of this size are commonly kept in service in the order of 15-25 years with proper water treatment and periodic tube renewal; actual life depends heavily on water chemistry control and duty cycle, so treat this as an order-of-magnitude figure only.

Components & Design

Component data being added…

Technical Data

medium Oil → Steam
type Composite Oil Section
boiler type Alfa Laval Aalborg Ölgefeuerte Schiffsdampfkessel (Water Tube / D-Type)

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Tube body leakage due to corrosion, pitting, deposits (scale/sludge) or wear

Internal visual inspection of all steam/water tubes; perform pressure test if suspected; seal leaking tube with conical stop valve after steel wire brush cleaning of tube ends. Leaking tubes must be renewed.

Water level regulation: failure of differential pressure transmitter or feedwater control valve leads to flooding/drying out

Check DP transmitter unit (external reference/variable leg, 4–20 mA output); feedwater control valve functional test; sight glass for cracks, contamination; test alarm function in control unit

Safety valve failure or incorrect opening/closing pressures — overpressure or inadequate emergency steam relief

Test two safety valves under full-load steam: pressure build-up 7 min. max. +6% working pressure permissible (water tubes); pop-point of each valve max. ±3% from set pressure; class notation: perform opening + accumulation test under classifier supervision

Furnace refractory damage (cracks, spalling) or soot/corrosion → heat leaks, furnace instability, drum overheating

Inspect furnace walls and refractory lining visually (min. 2x/year); check for cracks, moisture, soot deposits. Check lower tube plate (insulation + form refractory). After 3–4 weeks operation: perform blow-down, inspect/clean boiler, remove sludge

Loss of pressure integrity due to corrosion, cracks, rivets or welds → leakage, operating loss, safety risk

Hydrostatic test: fill boiler with water 21–65 °C (water tubes max. 71 °C). Pressure: 1.5× MAWP (non-entry) or 1.25× MAWP (entry). Secure safety valves with clamps. Check all seal surfaces, rivets, welds for leaks. Class notation: every 2 years (up to 8 years), then annually

Internal corrosion (water side), scale deposits or fire side soot/flocking → tube wear, heat loss, contamination

Class survey: water side (steam drum, water drum, all tubes) check for corrosion/cracks/deposits; fire side (furnace, flue gas path) check for soot/flocking (min. 2x/year). Man holes (top/bottom) permit access. If necessary use ultrasonic/endoscope for deeper defects

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Part of Mission composite boiler system. Oil section used in port. Water treatment per Alfa Laval guidelines.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Aalborg Industries (Alfa Laval): Keep burner nozzle set, photocell and gaskets onboard. Lead time: 3–8 weeks for tubes.