46 CFR 91 – PART 91—INSPECTION AND CERTIFICATION

Title 46 – Shipping · 59 sections

§Heading (official source)
§ 91.01-1Preemptive effect.
§ 91.01-2When required.
§ 91.01-5Posting.
§ 91.01-10Period of validity for a Certificate of Inspection.
§ 91.01-15Temporary certificate.
§ 91.01-20Expired certificate.
§ 91.01-25Emergency carriage of more than 16 persons in addition to the crew on vessels not engaged in international voyages.
§ 91.05-1When issued.
§ 91.05-5To whom issued.
§ 91.05-10Conditions of permit.
§ 91.05-15Posting.
§ 91.15-1Standards in inspection of hulls, boilers, and machinery.
§ 91.15-5Alternate compliance.
§ 91.20-1Prerequisite of certificate of inspection.
§ 91.20-5When made.
§ 91.20-10Plans.
§ 91.20-15Scope of inspection.
§ 91.20-20Specific tests and inspections.
§ 91.25-1Prerequisite of reissuance of certificate of inspection.
§ 91.25-5Application for a Certificate of Inspection.
§ 91.25-7Incorporation by reference.
§ 91.25-10Scope of inspection.
§ 91.25-15Lifesaving equipment.
§ 91.25-20Fire extinguishing equipment.
§ 91.25-25Hull equipment.
§ 91.25-30Electrical engineering equipment.
§ 91.25-35Marine engineering equipment.
§ 91.25-37Tanks containing dangerous cargoes.
§ 91.25-38Pollution prevention.
§ 91.25-40Sanitary inspection.
§ 91.25-45Fire hazards.
§ 91.25-50Inspector not limited.
§ 91.27-1Annual and periodic inspections.
§ 91.27-5Certificate of Inspection: Conditions of validity.
§ 91.27-13Alternative annual inspection for offshore supply vessels less than 400 gross tons in foreign ports.
§ 91.27-15Inspectors not limited.
§ 91.30-1General or partial survey.
§ 91.35-1When made.
§ 91.40-1Definitions relating to hull examinations.
§ 91.40-3Drydock examination, internal structural examination, cargo tank internal examination, and underwater survey intervals.
§ 91.40-5Notice and plans required.
§ 91.43-1When required.
§ 91.45-1Notice required.
§ 91.45-5Inspection required.
§ 91.50-1Inspection and testing required when making alterations, repairs, or other such operations involving riveting, welding, burning or like fire-producing actions.
§ 91.55-1General.
§ 91.55-5Plans and specifications required for new construction.
§ 91.55-10Plans required for alterations of existing vessels.
§ 91.55-15Procedure for submittal of plans.
§ 91.55-20Number of plans required.