Inspection & safety data
46 CFR 45 – PART 45—GREAT LAKES LOAD LINES
Title 46 – Shipping · 71 sections
| § | Heading (official source) |
|---|---|
| § 45.147 | Hatchway coamings. |
| § 45.149 | Machinery space openings. |
| § 45.151 | Other openings. |
| § 45.153 | Through-hull piping: General. |
| § 45.155 | Inlets and discharge piping: Valves. |
| § 45.157 | Scuppers and gravity drains. |
| § 45.159 | Special conditions of assignment for type A vessels. |
| § 45.171 | Purpose. |
| § 45.173 | Eligible barges. |
| § 45.175 | Applicable routes. |
| § 45.177 | Freeboard requirements. |
| § 45.179 | Cargo limitations. |
| § 45.181 | Load line exemption requirements for the Burns Harbor and Milwaukee routes. |
| § 45.183 | Load line requirements for the St. Joseph and Muskegon routes. |
| § 45.185 | Tow limitations. |
| § 45.187 | Weather limitations. |
| § 45.191 | Pre-departure requirements. |
| § 45.193 | Towboat power requirements. |
| § 45.195 | Additional equipment requirements for the Muskegon route. |
| § 45.197 | Operational plan requirements for the Muskegon route. |
| Appendix A | Appendix A to Part 45—Load Line Certificate Form |