Skip to content
OceanSphereENGINES
Inspection & safety data

33 CFR 148 – PART 148—DEEPWATER PORTS: GENERAL

Title 33 – Navigation and Navigable Waters · 75 sections

§Heading (official source)
§ 148.400What does this subpart do?
§ 148.405What are the procedures for notifying the Commandant (CG-5P) of proposed site evaluation and pre-construction testing?
§ 148.410What are the conditions for conducting site evaluation and pre-construction testing?
§ 148.415When conducting site evaluation and pre-construction testing, what must be reported?
§ 148.420When may the Commandant (CG-5P) suspend or prohibit site evaluation or pre-construction testing?
§ 148.500What does this subpart do?
§ 148.505How do I apply for an exemption?
§ 148.510What happens when a petition for exemption involves the interests of an Adjacent Coastal State?
§ 148.515When is an exemption allowed?
§ 148.600What is the limit of financial liability?
§ 148.605How is the limit of liability determined?
§ 148.700How does the Deepwater Port Act interact with other Federal and State laws?
§ 148.702How were the environmental review criteria developed?
§ 148.705What is determined by the environmental evaluation?
§ 148.707What type of criteria will be used in an environmental review and how will they be applied?
§ 148.708Must the applicant's proposal reflect potential regulations?
§ 148.709How are these criteria reviewed and revised?
§ 148.710What environmental conditions must be satisfied?
§ 148.715How is an environmental review conducted?
§ 148.720What are the siting criteria?
§ 148.722Should the construction plan incorporate best available technology and recommended industry practices?
§ 148.725What are the design, construction and operational criteria?
§ 148.730What are the land use and coastal zone management criteria?
§ 148.735What are other critical criteria that must be evaluated?
§ 148.737What environmental statutes must an applicant follow?