Inflatable Life Raft (SOLAS-B)
A SOLAS-B life raft carries a reduced survival equipment pack compared with SOLAS-A, reflecting the shorter time to rescue expected on the voyages it is approved for — the same inflatable shelter and canopy, but with less on board while survivors wait.
Read more — Inflatable Life Raft (SOLAS-B) explained ▾
What sets a SOLAS-B raft apart from SOLAS-A
Both packs use the same style of inflatable raft — canopy, buoyancy tubes, boarding ramp, righting strap — and both must meet the same LSA Code performance requirements for inflation, capacity and stability in the water. The difference is entirely in what is packed inside. A SOLAS-A pack is built for voyages where rescue could take longer, so it carries a fuller equipment set, including a larger water and food ration, more pyrotechnics, and additional survival aids. A SOLAS-B pack strips this back to a reduced list, reflecting the shorter expected time to rescue on the voyages it is approved for. Choosing SOLAS-B is a decision about the ship's trading area, not a lower-quality raft.
Main components
Buoyancy chamber and canopy
Dual, independently inflatable buoyancy tubes and an insulated canopy that inflates automatically with the raft, giving protection from wind, spray and sun once boarded.
Painter line and hydrostatic release unit
The painter triggers inflation when paid out and, together with a hydrostatic release unit on the cradle, allows the raft to float free and inflate automatically if the ship sinks before it is launched by hand.
Equipment pack (SOLAS-B specific)
A reduced pack against the SOLAS-A list: it still includes essentials such as a bailer, sponge, paddles, repair kit, first aid kit, seasickness tablets, and signalling equipment, but with lower quantities of items like water, food rations and pyrotechnic distress signals than a SOLAS-A pack for the same raft capacity.
Cradle and stowage
Holds the raft ready for launch, typically with a weak link and hydrostatic release arrangement so the raft is not dragged down with a sinking ship.
Selection and sizing
Selection is governed by the ship's certificated area of operation as much as by capacity:
- Whether the ship's trading pattern qualifies for SOLAS-B equipment under flag and class rules, typically tied to short international voyages or defined coastal areas
- Rated capacity against the ship's maximum complement, with enough rafts of the fitted capacity to cover the total persons on board plus any required margin
- Servicing interval and the location of an approved service station on the ship's normal trading route
- Deck stowage arrangement and launching method, davit-launched or throw-overboard, suited to freeboard and available deck space
Regulations and class
SOLAS Ch. III and the LSA Code set both the raft's performance standards and the exact contents lists for SOLAS-A and SOLAS-B equipment packs. Servicing is required at intervals set by the manufacturer's approval, generally not exceeding twelve months, at a station approved for that raft type, with hydrostatic release units and painter systems checked and renewed on their own separate schedules. Flag administrations decide which ships and voyages may carry SOLAS-B rather than SOLAS-A equipment.
Typical faults
| Fault | Consequence |
|---|---|
| Service overdue at the annual station visit | Raft certificate lapses, and the ship may not be permitted to sail without a valid raft |
| Hydrostatic release unit past its expiry date | Raft may not float free and inflate automatically if the ship sinks before manual launch |
| Cradle corrosion or lashing wrongly re-secured after servicing | Raft fails to release cleanly during an actual launch |
| SOLAS-B raft carried on a voyage that actually requires SOLAS-A equipment | Non-compliance found at port state control, and a genuine shortfall in survival equipment if the raft is ever used |
What to look for in a supplier
- Approval certificate confirming SOLAS-B contents match the current LSA Code list for the raft's capacity
- Service station network covering the ship's actual trading pattern, not just the home port
- Clear labelling distinguishing SOLAS-A and SOLAS-B stock where a ship's stores hold both types
- Documented history of hydrostatic release unit and cradle condition if buying a raft already in service
Confirm which pack, SOLAS-A or SOLAS-B, is actually loaded in each raft rather than assuming from the raft's outer case — the two are visually similar and mixing them up on a voyage that requires SOLAS-A is a real port state control finding.
15 manufacturers · 201 models
Grand Ocean Marine
13 ✓ 13 verified- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)Check: Annual servicing by approved service stations within 12 months (max 17 months in remote areas per SOLAS III/20.8.1)
- Area: Inspection of seams, zippers, and inflatable supports for integrity and material degradationCheck: Inspection of seams, zippers, and inflatable supports for integrity and material degradation
- Area: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independentlyCheck: Verification of Hydrostatic Release Unit (HRU) expiry date - must be replaced every 2 years independently
- Area: Testing of manual inflation pump for proper operation and valve functionCheck: Testing of manual inflation pump for proper operation and valve function
- Area: Checking and replacement of worn instruction labels and retroreflective marking/reflector tapeCheck: Checking and replacement of worn instruction labels and retroreflective marking/reflector tape
- Area: Examination of liferaft for correct markings, capacity certification, and approval certificatesCheck: Examination of liferaft for correct markings, capacity certification, and approval certificates
- Area: Inspection of container/canister for corrosion, damage, and proper securing mechanismsCheck: Inspection of container/canister for corrosion, damage, and proper securing mechanisms
- Area: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signedCheck: Documentation review - maintenance records, servicing certificates, and repair logs must be current and signed
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
Revere Survival Inc.
10 ✓ 10 verified- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger AufblasungCheck: Faserstruktur und Nahtintegrität - Vollständige Inspektion auf Beschädigungen, Risse, Verformungen bei vollständiger Aufblasung
- Area: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und DruckabbauCheck: Auftriebskammer-Funktionalität und Drucktest - Prüfung beider Luftkammern auf Dichtheit und Druckabbau
- Area: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder InspektionCheck: Hydrostatic Release Unit (HRU) Gültigkeit und Funktion - Austausch alle 2 Jahre unabhängig vom Zustand während jeder Inspektion
- Area: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und NotfallausrüstungCheck: Ausrüstungsinventar nach SOLAS-B Packungsliste - Vollständigkeit aller geforderten Rettungsmittel und Notfallausrüstung
- Area: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und SignalraketenCheck: Pyrotechnische Mittel - Verfallsdatum prüfen, Austausch aller abgelaufenen Leuchtkörper und Signalraketen
- Area: Aufblassystem - Test der manuellen Handpumpe und automatischen AufblasanlageCheck: Aufblassystem - Test der manuellen Handpumpe und automatischen Aufblasanlage
- Area: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-VorrichtungCheck: Behälter und Cradle Inspektion - Wöchentliches visuelles Check, Verwitterung, Befestigung, Hydrostatic-Release-Vorrichtung
- Area: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfenCheck: Trink- und Notproviant - Verfallsdatum prüfen und austauschen, Thermische Schutzausrüstung überprüfen
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
Deyuan Marine Fitting Co., Ltd
9 ✓ 9 verified- Area: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und VerfaerbungenCheck: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und Verfaerbungen
- Area: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichteCheck: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichte
- Area: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)Check: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)
- Area: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und BeschaedigungenCheck: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und Beschaedigungen
- Area: Kontrolle der Dichtheit durch Druck- und LecktestsCheck: Kontrolle der Dichtheit durch Druck- und Lecktests
- Area: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und KorrosionCheck: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und Korrosion
- Area: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und BefestigungCheck: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und Befestigung
- Area: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und VerfallsdatumCheck: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und Verfallsdatum
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und VerfaerbungenCheck: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und Verfaerbungen
- Area: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichteCheck: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichte
- Area: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)Check: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)
- Area: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und BeschaedigungenCheck: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und Beschaedigungen
- Area: Kontrolle der Dichtheit durch Druck- und LecktestsCheck: Kontrolle der Dichtheit durch Druck- und Lecktests
- Area: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und KorrosionCheck: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und Korrosion
- Area: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und BefestigungCheck: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und Befestigung
- Area: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und VerfallsdatumCheck: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und Verfallsdatum
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und VerfaerbungenCheck: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und Verfaerbungen
- Area: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichteCheck: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichte
- Area: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)Check: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)
- Area: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und BeschaedigungenCheck: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und Beschaedigungen
- Area: Kontrolle der Dichtheit durch Druck- und LecktestsCheck: Kontrolle der Dichtheit durch Druck- und Lecktests
- Area: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und KorrosionCheck: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und Korrosion
- Area: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und BefestigungCheck: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und Befestigung
- Area: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und VerfallsdatumCheck: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und Verfallsdatum
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und VerfaerbungenCheck: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und Verfaerbungen
- Area: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichteCheck: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichte
- Area: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)Check: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)
- Area: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und BeschaedigungenCheck: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und Beschaedigungen
- Area: Kontrolle der Dichtheit durch Druck- und LecktestsCheck: Kontrolle der Dichtheit durch Druck- und Lecktests
- Area: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und KorrosionCheck: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und Korrosion
- Area: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und BefestigungCheck: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und Befestigung
- Area: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und VerfallsdatumCheck: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und Verfallsdatum
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und VerfaerbungenCheck: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und Verfaerbungen
- Area: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichteCheck: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichte
- Area: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)Check: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)
- Area: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und BeschaedigungenCheck: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und Beschaedigungen
- Area: Kontrolle der Dichtheit durch Druck- und LecktestsCheck: Kontrolle der Dichtheit durch Druck- und Lecktests
- Area: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und KorrosionCheck: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und Korrosion
- Area: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und BefestigungCheck: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und Befestigung
- Area: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und VerfallsdatumCheck: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und Verfallsdatum
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und VerfaerbungenCheck: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und Verfaerbungen
- Area: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichteCheck: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichte
- Area: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)Check: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)
- Area: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und BeschaedigungenCheck: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und Beschaedigungen
- Area: Kontrolle der Dichtheit durch Druck- und LecktestsCheck: Kontrolle der Dichtheit durch Druck- und Lecktests
- Area: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und KorrosionCheck: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und Korrosion
- Area: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und BefestigungCheck: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und Befestigung
- Area: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und VerfallsdatumCheck: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und Verfallsdatum
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und VerfaerbungenCheck: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und Verfaerbungen
- Area: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichteCheck: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichte
- Area: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)Check: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)
- Area: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und BeschaedigungenCheck: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und Beschaedigungen
- Area: Kontrolle der Dichtheit durch Druck- und LecktestsCheck: Kontrolle der Dichtheit durch Druck- und Lecktests
- Area: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und KorrosionCheck: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und Korrosion
- Area: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und BefestigungCheck: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und Befestigung
- Area: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und VerfallsdatumCheck: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und Verfallsdatum
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und VerfaerbungenCheck: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und Verfaerbungen
- Area: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichteCheck: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichte
- Area: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)Check: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)
- Area: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und BeschaedigungenCheck: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und Beschaedigungen
- Area: Kontrolle der Dichtheit durch Druck- und LecktestsCheck: Kontrolle der Dichtheit durch Druck- und Lecktests
- Area: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und KorrosionCheck: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und Korrosion
- Area: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und BefestigungCheck: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und Befestigung
- Area: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und VerfallsdatumCheck: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und Verfallsdatum
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und VerfaerbungenCheck: Visuelle Inspektion des Rumpfs und der Kammern auf Verschlei, Risse, Beschaedigungen und Verfaerbungen
- Area: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichteCheck: Kontrolle aller Ventile, Relie und Manometer auf Funktionsfaehigkeit und dichte
- Area: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)Check: Pruefung der Rettungsausruestung (Rettungsleinen, Messer, Angelausruestung, Signalbehoerde, Erste-Hilfe-Paket)
- Area: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und BeschaedigungenCheck: Ueberpruefung der Haltegurte und Befestigungspunkte auf Verschleiss und Beschaedigungen
- Area: Kontrolle der Dichtheit durch Druck- und LecktestsCheck: Kontrolle der Dichtheit durch Druck- und Lecktests
- Area: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und KorrosionCheck: Ueberprueung des Bezugssystems (Vormann, Anker) auf Verschleiss und Korrosion
- Area: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und BefestigungCheck: Inspektion des Baldachins (Markise) auf Staendigkeit, Teile und Befestigung
- Area: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und VerfallsdatumCheck: Ueberprueung der Gass-Inflationszylinder auf Ausloesung, Druck und Verfallsdatum
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
Matchau
8 ✓ 8 verified- Area: Visual hull and seam integrity inspection for damage, punctures, or delaminationCheck: Visual hull and seam integrity inspection for damage, punctures, or delamination
- Area: Air pressure testing and inflation system valve functionality verificationCheck: Air pressure testing and inflation system valve functionality verification
- Area: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)Check: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)
- Area: Canopy and tarpaulin condition, UV damage assessment, and securing system functionalityCheck: Canopy and tarpaulin condition, UV damage assessment, and securing system functionality
- Area: Sea anchors, painter lines, and boarding ladders structural integrity and attachment pointsCheck: Sea anchors, painter lines, and boarding ladders structural integrity and attachment points
- Area: Annual hydrostatic release unit (HRU) inspection and certification verificationCheck: Annual hydrostatic release unit (HRU) inspection and certification verification
- Area: Five-year certified maintenance and recertification compliance documentation reviewCheck: Five-year certified maintenance and recertification compliance documentation review
- Area: Container or cradle condition and securing mechanisms for deployment readinessCheck: Container or cradle condition and securing mechanisms for deployment readiness
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual hull and seam integrity inspection for damage, punctures, or delaminationCheck: Visual hull and seam integrity inspection for damage, punctures, or delamination
- Area: Air pressure testing and inflation system valve functionality verificationCheck: Air pressure testing and inflation system valve functionality verification
- Area: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)Check: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)
- Area: Canopy and tarpaulin condition, UV damage assessment, and securing system functionalityCheck: Canopy and tarpaulin condition, UV damage assessment, and securing system functionality
- Area: Sea anchors, painter lines, and boarding ladders structural integrity and attachment pointsCheck: Sea anchors, painter lines, and boarding ladders structural integrity and attachment points
- Area: Annual hydrostatic release unit (HRU) inspection and certification verificationCheck: Annual hydrostatic release unit (HRU) inspection and certification verification
- Area: Five-year certified maintenance and recertification compliance documentation reviewCheck: Five-year certified maintenance and recertification compliance documentation review
- Area: Container or cradle condition and securing mechanisms for deployment readinessCheck: Container or cradle condition and securing mechanisms for deployment readiness
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual hull and seam integrity inspection for damage, punctures, or delaminationCheck: Visual hull and seam integrity inspection for damage, punctures, or delamination
- Area: Air pressure testing and inflation system valve functionality verificationCheck: Air pressure testing and inflation system valve functionality verification
- Area: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)Check: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)
- Area: Canopy and tarpaulin condition, UV damage assessment, and securing system functionalityCheck: Canopy and tarpaulin condition, UV damage assessment, and securing system functionality
- Area: Sea anchors, painter lines, and boarding ladders structural integrity and attachment pointsCheck: Sea anchors, painter lines, and boarding ladders structural integrity and attachment points
- Area: Annual hydrostatic release unit (HRU) inspection and certification verificationCheck: Annual hydrostatic release unit (HRU) inspection and certification verification
- Area: Five-year certified maintenance and recertification compliance documentation reviewCheck: Five-year certified maintenance and recertification compliance documentation review
- Area: Container or cradle condition and securing mechanisms for deployment readinessCheck: Container or cradle condition and securing mechanisms for deployment readiness
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual hull and seam integrity inspection for damage, punctures, or delaminationCheck: Visual hull and seam integrity inspection for damage, punctures, or delamination
- Area: Air pressure testing and inflation system valve functionality verificationCheck: Air pressure testing and inflation system valve functionality verification
- Area: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)Check: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)
- Area: Canopy and tarpaulin condition, UV damage assessment, and securing system functionalityCheck: Canopy and tarpaulin condition, UV damage assessment, and securing system functionality
- Area: Sea anchors, painter lines, and boarding ladders structural integrity and attachment pointsCheck: Sea anchors, painter lines, and boarding ladders structural integrity and attachment points
- Area: Annual hydrostatic release unit (HRU) inspection and certification verificationCheck: Annual hydrostatic release unit (HRU) inspection and certification verification
- Area: Five-year certified maintenance and recertification compliance documentation reviewCheck: Five-year certified maintenance and recertification compliance documentation review
- Area: Container or cradle condition and securing mechanisms for deployment readinessCheck: Container or cradle condition and securing mechanisms for deployment readiness
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual hull and seam integrity inspection for damage, punctures, or delaminationCheck: Visual hull and seam integrity inspection for damage, punctures, or delamination
- Area: Air pressure testing and inflation system valve functionality verificationCheck: Air pressure testing and inflation system valve functionality verification
- Area: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)Check: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)
- Area: Canopy and tarpaulin condition, UV damage assessment, and securing system functionalityCheck: Canopy and tarpaulin condition, UV damage assessment, and securing system functionality
- Area: Sea anchors, painter lines, and boarding ladders structural integrity and attachment pointsCheck: Sea anchors, painter lines, and boarding ladders structural integrity and attachment points
- Area: Annual hydrostatic release unit (HRU) inspection and certification verificationCheck: Annual hydrostatic release unit (HRU) inspection and certification verification
- Area: Five-year certified maintenance and recertification compliance documentation reviewCheck: Five-year certified maintenance and recertification compliance documentation review
- Area: Container or cradle condition and securing mechanisms for deployment readinessCheck: Container or cradle condition and securing mechanisms for deployment readiness
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual hull and seam integrity inspection for damage, punctures, or delaminationCheck: Visual hull and seam integrity inspection for damage, punctures, or delamination
- Area: Air pressure testing and inflation system valve functionality verificationCheck: Air pressure testing and inflation system valve functionality verification
- Area: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)Check: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)
- Area: Canopy and tarpaulin condition, UV damage assessment, and securing system functionalityCheck: Canopy and tarpaulin condition, UV damage assessment, and securing system functionality
- Area: Sea anchors, painter lines, and boarding ladders structural integrity and attachment pointsCheck: Sea anchors, painter lines, and boarding ladders structural integrity and attachment points
- Area: Annual hydrostatic release unit (HRU) inspection and certification verificationCheck: Annual hydrostatic release unit (HRU) inspection and certification verification
- Area: Five-year certified maintenance and recertification compliance documentation reviewCheck: Five-year certified maintenance and recertification compliance documentation review
- Area: Container or cradle condition and securing mechanisms for deployment readinessCheck: Container or cradle condition and securing mechanisms for deployment readiness
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual hull and seam integrity inspection for damage, punctures, or delaminationCheck: Visual hull and seam integrity inspection for damage, punctures, or delamination
- Area: Air pressure testing and inflation system valve functionality verificationCheck: Air pressure testing and inflation system valve functionality verification
- Area: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)Check: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)
- Area: Canopy and tarpaulin condition, UV damage assessment, and securing system functionalityCheck: Canopy and tarpaulin condition, UV damage assessment, and securing system functionality
- Area: Sea anchors, painter lines, and boarding ladders structural integrity and attachment pointsCheck: Sea anchors, painter lines, and boarding ladders structural integrity and attachment points
- Area: Annual hydrostatic release unit (HRU) inspection and certification verificationCheck: Annual hydrostatic release unit (HRU) inspection and certification verification
- Area: Five-year certified maintenance and recertification compliance documentation reviewCheck: Five-year certified maintenance and recertification compliance documentation review
- Area: Container or cradle condition and securing mechanisms for deployment readinessCheck: Container or cradle condition and securing mechanisms for deployment readiness
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual hull and seam integrity inspection for damage, punctures, or delaminationCheck: Visual hull and seam integrity inspection for damage, punctures, or delamination
- Area: Air pressure testing and inflation system valve functionality verificationCheck: Air pressure testing and inflation system valve functionality verification
- Area: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)Check: Emergency equipment pack contents shelf-life and completeness inspection (first aid kit, signaling flares, sea anchors, fishing kits)
- Area: Canopy and tarpaulin condition, UV damage assessment, and securing system functionalityCheck: Canopy and tarpaulin condition, UV damage assessment, and securing system functionality
- Area: Sea anchors, painter lines, and boarding ladders structural integrity and attachment pointsCheck: Sea anchors, painter lines, and boarding ladders structural integrity and attachment points
- Area: Annual hydrostatic release unit (HRU) inspection and certification verificationCheck: Annual hydrostatic release unit (HRU) inspection and certification verification
- Area: Five-year certified maintenance and recertification compliance documentation reviewCheck: Five-year certified maintenance and recertification compliance documentation review
- Area: Container or cradle condition and securing mechanisms for deployment readinessCheck: Container or cradle condition and securing mechanisms for deployment readiness
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
Seago Ltd
7 ✓ 7 verified- Area: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)Check: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)
- Area: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damageCheck: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damage
- Area: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edgesCheck: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edges
- Area: Verification and replacement of expired pyrotechnics, water rations, and emergency food suppliesCheck: Verification and replacement of expired pyrotechnics, water rations, and emergency food supplies
- Area: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding rampsCheck: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding ramps
- Area: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)Check: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)
- Area: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflationCheck: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflation
- Area: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)Check: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)Check: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)
- Area: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damageCheck: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damage
- Area: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edgesCheck: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edges
- Area: Verification and replacement of expired pyrotechnics, water rations, and emergency food suppliesCheck: Verification and replacement of expired pyrotechnics, water rations, and emergency food supplies
- Area: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding rampsCheck: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding ramps
- Area: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)Check: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)
- Area: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflationCheck: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflation
- Area: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)Check: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)Check: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)
- Area: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damageCheck: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damage
- Area: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edgesCheck: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edges
- Area: Verification and replacement of expired pyrotechnics, water rations, and emergency food suppliesCheck: Verification and replacement of expired pyrotechnics, water rations, and emergency food supplies
- Area: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding rampsCheck: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding ramps
- Area: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)Check: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)
- Area: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflationCheck: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflation
- Area: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)Check: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)Check: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)
- Area: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damageCheck: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damage
- Area: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edgesCheck: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edges
- Area: Verification and replacement of expired pyrotechnics, water rations, and emergency food suppliesCheck: Verification and replacement of expired pyrotechnics, water rations, and emergency food supplies
- Area: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding rampsCheck: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding ramps
- Area: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)Check: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)
- Area: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflationCheck: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflation
- Area: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)Check: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)Check: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)
- Area: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damageCheck: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damage
- Area: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edgesCheck: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edges
- Area: Verification and replacement of expired pyrotechnics, water rations, and emergency food suppliesCheck: Verification and replacement of expired pyrotechnics, water rations, and emergency food supplies
- Area: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding rampsCheck: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding ramps
- Area: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)Check: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)
- Area: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflationCheck: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflation
- Area: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)Check: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)Check: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)
- Area: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damageCheck: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damage
- Area: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edgesCheck: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edges
- Area: Verification and replacement of expired pyrotechnics, water rations, and emergency food suppliesCheck: Verification and replacement of expired pyrotechnics, water rations, and emergency food supplies
- Area: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding rampsCheck: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding ramps
- Area: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)Check: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)
- Area: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflationCheck: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflation
- Area: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)Check: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)Check: Annual servicing by approved service stations at intervals not exceeding 12 months (per SOLAS III/20.8.1)
- Area: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damageCheck: Visual inspection of canopy, grab lines, buoyancy chambers, and all seams for integrity and fabric damage
- Area: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edgesCheck: Examination of seam connections (floor-to-buoyancy tube) for slippage, rupture, and lifting of edges
- Area: Verification and replacement of expired pyrotechnics, water rations, and emergency food suppliesCheck: Verification and replacement of expired pyrotechnics, water rations, and emergency food supplies
- Area: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding rampsCheck: Functional testing of mechanical components: inflation/deflation cylinders, pressure relief valves, boarding ramps
- Area: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)Check: Inspection and verification of retro-reflective tape condition and adhesion (canopy perimeter and floor cross pattern)
- Area: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflationCheck: Pressure-retention test on buoyancy chambers: minimum 5% pressure loss tolerance over 5 minutes after inflation
- Area: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)Check: Inspection of inflation cylinder condition, hydrostatic testing, and cylinder weight verification (recharge if >5% weight loss)
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
Ocean Safety
6 ✓ 6 verified- Area: Annual servicing at approved station within 12-month intervals (17 months with extension)Check: Annual servicing at approved station within 12-month intervals (17 months with extension)
- Area: Full inflation inspection of fabric, seams, and all structural components for damage or deteriorationCheck: Full inflation inspection of fabric, seams, and all structural components for damage or deterioration
- Area: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)Check: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)
- Area: Test and replace expired pyrotechnics, water rations, and food suppliesCheck: Test and replace expired pyrotechnics, water rations, and food supplies
- Area: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, laddersCheck: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, ladders
- Area: Inspect retroreflective material marking to IMO revised recommendation standardsCheck: Inspect retroreflective material marking to IMO revised recommendation standards
- Area: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of conditionCheck: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of condition
- Area: Manual inflation pump functional testing and verificationCheck: Manual inflation pump functional testing and verification
- Area: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionalityCheck: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionality
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing at approved station within 12-month intervals (17 months with extension)Check: Annual servicing at approved station within 12-month intervals (17 months with extension)
- Area: Full inflation inspection of fabric, seams, and all structural components for damage or deteriorationCheck: Full inflation inspection of fabric, seams, and all structural components for damage or deterioration
- Area: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)Check: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)
- Area: Test and replace expired pyrotechnics, water rations, and food suppliesCheck: Test and replace expired pyrotechnics, water rations, and food supplies
- Area: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, laddersCheck: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, ladders
- Area: Inspect retroreflective material marking to IMO revised recommendation standardsCheck: Inspect retroreflective material marking to IMO revised recommendation standards
- Area: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of conditionCheck: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of condition
- Area: Manual inflation pump functional testing and verificationCheck: Manual inflation pump functional testing and verification
- Area: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionalityCheck: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionality
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing at approved station within 12-month intervals (17 months with extension)Check: Annual servicing at approved station within 12-month intervals (17 months with extension)
- Area: Full inflation inspection of fabric, seams, and all structural components for damage or deteriorationCheck: Full inflation inspection of fabric, seams, and all structural components for damage or deterioration
- Area: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)Check: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)
- Area: Test and replace expired pyrotechnics, water rations, and food suppliesCheck: Test and replace expired pyrotechnics, water rations, and food supplies
- Area: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, laddersCheck: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, ladders
- Area: Inspect retroreflective material marking to IMO revised recommendation standardsCheck: Inspect retroreflective material marking to IMO revised recommendation standards
- Area: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of conditionCheck: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of condition
- Area: Manual inflation pump functional testing and verificationCheck: Manual inflation pump functional testing and verification
- Area: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionalityCheck: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionality
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing at approved station within 12-month intervals (17 months with extension)Check: Annual servicing at approved station within 12-month intervals (17 months with extension)
- Area: Full inflation inspection of fabric, seams, and all structural components for damage or deteriorationCheck: Full inflation inspection of fabric, seams, and all structural components for damage or deterioration
- Area: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)Check: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)
- Area: Test and replace expired pyrotechnics, water rations, and food suppliesCheck: Test and replace expired pyrotechnics, water rations, and food supplies
- Area: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, laddersCheck: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, ladders
- Area: Inspect retroreflective material marking to IMO revised recommendation standardsCheck: Inspect retroreflective material marking to IMO revised recommendation standards
- Area: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of conditionCheck: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of condition
- Area: Manual inflation pump functional testing and verificationCheck: Manual inflation pump functional testing and verification
- Area: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionalityCheck: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionality
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing at approved station within 12-month intervals (17 months with extension)Check: Annual servicing at approved station within 12-month intervals (17 months with extension)
- Area: Full inflation inspection of fabric, seams, and all structural components for damage or deteriorationCheck: Full inflation inspection of fabric, seams, and all structural components for damage or deterioration
- Area: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)Check: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)
- Area: Test and replace expired pyrotechnics, water rations, and food suppliesCheck: Test and replace expired pyrotechnics, water rations, and food supplies
- Area: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, laddersCheck: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, ladders
- Area: Inspect retroreflective material marking to IMO revised recommendation standardsCheck: Inspect retroreflective material marking to IMO revised recommendation standards
- Area: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of conditionCheck: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of condition
- Area: Manual inflation pump functional testing and verificationCheck: Manual inflation pump functional testing and verification
- Area: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionalityCheck: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionality
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Annual servicing at approved station within 12-month intervals (17 months with extension)Check: Annual servicing at approved station within 12-month intervals (17 months with extension)
- Area: Full inflation inspection of fabric, seams, and all structural components for damage or deteriorationCheck: Full inflation inspection of fabric, seams, and all structural components for damage or deterioration
- Area: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)Check: Verify all SOLAS equipment against manufacturer packing list (flares, mirrors, whistles, sea anchors, paddles, thermal protective aids)
- Area: Test and replace expired pyrotechnics, water rations, and food suppliesCheck: Test and replace expired pyrotechnics, water rations, and food supplies
- Area: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, laddersCheck: Inspect and test mechanical components: CO2 inflation cylinders, relief valves, boarding ramps, ladders
- Area: Inspect retroreflective material marking to IMO revised recommendation standardsCheck: Inspect retroreflective material marking to IMO revised recommendation standards
- Area: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of conditionCheck: Hydrostatic Release Unit (HRU) replacement at maximum 2-year intervals regardless of condition
- Area: Manual inflation pump functional testing and verificationCheck: Manual inflation pump functional testing and verification
- Area: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionalityCheck: Check all instruction labels, lighting systems (internal/external), and signaling equipment functionality
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
Survitec Group
6 ✓ 6 verified- Area: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seamsCheck: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seams
- Area: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrityCheck: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrity
- Area: Functional testing of manual inflation pump and CO2 inflation system for proper operationCheck: Functional testing of manual inflation pump and CO2 inflation system for proper operation
- Area: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)Check: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)
- Area: Testing of hydrostatic release unit (HRU) within validity period and functionality verificationCheck: Testing of hydrostatic release unit (HRU) within validity period and functionality verification
- Area: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanismsCheck: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanisms
- Area: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentationCheck: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentation
- Area: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervalsCheck: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervals
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seamsCheck: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seams
- Area: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrityCheck: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrity
- Area: Functional testing of manual inflation pump and CO2 inflation system for proper operationCheck: Functional testing of manual inflation pump and CO2 inflation system for proper operation
- Area: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)Check: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)
- Area: Testing of hydrostatic release unit (HRU) within validity period and functionality verificationCheck: Testing of hydrostatic release unit (HRU) within validity period and functionality verification
- Area: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanismsCheck: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanisms
- Area: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentationCheck: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentation
- Area: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervalsCheck: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervals
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seamsCheck: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seams
- Area: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrityCheck: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrity
- Area: Functional testing of manual inflation pump and CO2 inflation system for proper operationCheck: Functional testing of manual inflation pump and CO2 inflation system for proper operation
- Area: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)Check: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)
- Area: Testing of hydrostatic release unit (HRU) within validity period and functionality verificationCheck: Testing of hydrostatic release unit (HRU) within validity period and functionality verification
- Area: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanismsCheck: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanisms
- Area: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentationCheck: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentation
- Area: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervalsCheck: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervals
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seamsCheck: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seams
- Area: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrityCheck: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrity
- Area: Functional testing of manual inflation pump and CO2 inflation system for proper operationCheck: Functional testing of manual inflation pump and CO2 inflation system for proper operation
- Area: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)Check: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)
- Area: Testing of hydrostatic release unit (HRU) within validity period and functionality verificationCheck: Testing of hydrostatic release unit (HRU) within validity period and functionality verification
- Area: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanismsCheck: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanisms
- Area: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentationCheck: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentation
- Area: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervalsCheck: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervals
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seamsCheck: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seams
- Area: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrityCheck: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrity
- Area: Functional testing of manual inflation pump and CO2 inflation system for proper operationCheck: Functional testing of manual inflation pump and CO2 inflation system for proper operation
- Area: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)Check: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)
- Area: Testing of hydrostatic release unit (HRU) within validity period and functionality verificationCheck: Testing of hydrostatic release unit (HRU) within validity period and functionality verification
- Area: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanismsCheck: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanisms
- Area: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentationCheck: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentation
- Area: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervalsCheck: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervals
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seamsCheck: Visual inspection of buoyancy chambers for deterioration, cracks, or abrasion damage to the fabric and seams
- Area: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrityCheck: Examination of inflatable canopy for tears, corrosion of retro-reflective materials, and structural integrity
- Area: Functional testing of manual inflation pump and CO2 inflation system for proper operationCheck: Functional testing of manual inflation pump and CO2 inflation system for proper operation
- Area: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)Check: Verification and replacement of expired emergency supplies (pyrotechnics, food rations, fresh water bottles, first aid kit contents)
- Area: Testing of hydrostatic release unit (HRU) within validity period and functionality verificationCheck: Testing of hydrostatic release unit (HRU) within validity period and functionality verification
- Area: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanismsCheck: Inspection and functionality test of boarding ramps, grab lines, and emergency equipment securing mechanisms
- Area: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentationCheck: Verification of all SOLAS-B emergency equipment pack contents against packing list and certification documentation
- Area: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervalsCheck: Annual servicing compliance verification and certification maintenance by approved service station within 12-month intervals
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
Winslow LifeRaft Company
3 ✓ 3 verified- Area: Visual exterior inspection of raft container and retroreflective material for damage or deterioration; replace if damaged or fadedCheck: Visual exterior inspection of raft container and retroreflective material for damage or deterioration; replace if damaged or faded
- Area: Internal full inflation and structural integrity check: inspect fabric, seams, and all buoyancy tubes for tears, punctures, cracks, or seam slippageCheck: Internal full inflation and structural integrity check: inspect fabric, seams, and all buoyancy tubes for tears, punctures, cracks, or seam slippage
- Area: Pressurized seam test (NAP - Necessary Additional Pressure): pressurize to specified level, monitor for 5-minute hold with maximum 5% pressure drop allowedCheck: Pressurized seam test (NAP - Necessary Additional Pressure): pressurize to specified level, monitor for 5-minute hold with maximum 5% pressure drop allowed
- Area: Inflation system functionality: test CO2/N2 inflation cylinders for proper pressure and deploy mechanisms; inspect relief and topping-up valvesCheck: Inflation system functionality: test CO2/N2 inflation cylinders for proper pressure and deploy mechanisms; inspect relief and topping-up valves
- Area: Seawater activation and manual inflation pump testing for proper operation and responseCheck: Seawater activation and manual inflation pump testing for proper operation and response
- Area: Survival equipment inventory verification against SOLAS packing list: expired pyrotechnics, food rations, water packets, first aid kits must be currentCheck: Survival equipment inventory verification against SOLAS packing list: expired pyrotechnics, food rations, water packets, first aid kits must be current
- Area: Hydrostatic Release Unit (HRU) replacement: must be replaced at maximum 2-year intervals regardless of condition; expired HRU renders entire assembly non-compliCheck: Hydrostatic Release Unit (HRU) replacement: must be replaced at maximum 2-year intervals regardless of condition; expired HRU renders entire assembly non-compliant
- Area: Floor seam integrity testing (from 10th year service onward): full pressurization test on floor compartments with soapy water leak detection at seamsCheck: Floor seam integrity testing (from 10th year service onward): full pressurization test on floor compartments with soapy water leak detection at seams
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual exterior inspection of raft container and retroreflective material for damage or deterioration; replace if damaged or fadedCheck: Visual exterior inspection of raft container and retroreflective material for damage or deterioration; replace if damaged or faded
- Area: Internal full inflation and structural integrity check: inspect fabric, seams, and all buoyancy tubes for tears, punctures, cracks, or seam slippageCheck: Internal full inflation and structural integrity check: inspect fabric, seams, and all buoyancy tubes for tears, punctures, cracks, or seam slippage
- Area: Pressurized seam test (NAP - Necessary Additional Pressure): pressurize to specified level, monitor for 5-minute hold with maximum 5% pressure drop allowedCheck: Pressurized seam test (NAP - Necessary Additional Pressure): pressurize to specified level, monitor for 5-minute hold with maximum 5% pressure drop allowed
- Area: Inflation system functionality: test CO2/N2 inflation cylinders for proper pressure and deploy mechanisms; inspect relief and topping-up valvesCheck: Inflation system functionality: test CO2/N2 inflation cylinders for proper pressure and deploy mechanisms; inspect relief and topping-up valves
- Area: Seawater activation and manual inflation pump testing for proper operation and responseCheck: Seawater activation and manual inflation pump testing for proper operation and response
- Area: Survival equipment inventory verification against SOLAS packing list: expired pyrotechnics, food rations, water packets, first aid kits must be currentCheck: Survival equipment inventory verification against SOLAS packing list: expired pyrotechnics, food rations, water packets, first aid kits must be current
- Area: Hydrostatic Release Unit (HRU) replacement: must be replaced at maximum 2-year intervals regardless of condition; expired HRU renders entire assembly non-compliCheck: Hydrostatic Release Unit (HRU) replacement: must be replaced at maximum 2-year intervals regardless of condition; expired HRU renders entire assembly non-compliant
- Area: Floor seam integrity testing (from 10th year service onward): full pressurization test on floor compartments with soapy water leak detection at seamsCheck: Floor seam integrity testing (from 10th year service onward): full pressurization test on floor compartments with soapy water leak detection at seams
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
- Area: Visual exterior inspection of raft container and retroreflective material for damage or deterioration; replace if damaged or fadedCheck: Visual exterior inspection of raft container and retroreflective material for damage or deterioration; replace if damaged or faded
- Area: Internal full inflation and structural integrity check: inspect fabric, seams, and all buoyancy tubes for tears, punctures, cracks, or seam slippageCheck: Internal full inflation and structural integrity check: inspect fabric, seams, and all buoyancy tubes for tears, punctures, cracks, or seam slippage
- Area: Pressurized seam test (NAP - Necessary Additional Pressure): pressurize to specified level, monitor for 5-minute hold with maximum 5% pressure drop allowedCheck: Pressurized seam test (NAP - Necessary Additional Pressure): pressurize to specified level, monitor for 5-minute hold with maximum 5% pressure drop allowed
- Area: Inflation system functionality: test CO2/N2 inflation cylinders for proper pressure and deploy mechanisms; inspect relief and topping-up valvesCheck: Inflation system functionality: test CO2/N2 inflation cylinders for proper pressure and deploy mechanisms; inspect relief and topping-up valves
- Area: Seawater activation and manual inflation pump testing for proper operation and responseCheck: Seawater activation and manual inflation pump testing for proper operation and response
- Area: Survival equipment inventory verification against SOLAS packing list: expired pyrotechnics, food rations, water packets, first aid kits must be currentCheck: Survival equipment inventory verification against SOLAS packing list: expired pyrotechnics, food rations, water packets, first aid kits must be current
- Area: Hydrostatic Release Unit (HRU) replacement: must be replaced at maximum 2-year intervals regardless of condition; expired HRU renders entire assembly non-compliCheck: Hydrostatic Release Unit (HRU) replacement: must be replaced at maximum 2-year intervals regardless of condition; expired HRU renders entire assembly non-compliant
- Area: Floor seam integrity testing (from 10th year service onward): full pressurization test on floor compartments with soapy water leak detection at seamsCheck: Floor seam integrity testing (from 10th year service onward): full pressurization test on floor compartments with soapy water leak detection at seams
Typ-universelle Inspektionspunkte fuer Life Rafts (verifiziert, 2026-06).
Survitec / RFD
36Zodiac Marine
26Plastimo
20VIKING Life-Saving
20- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.
- Kapazitätsbereich
- 4 bis 35 Personen (DK+ & DKF+ Serien)
- Behältertypen
- Rund, Quadratisch, Low-Profile (Fiberglas)
- Funktionstemperatur
- -30°C bis +65°C (Standard); -50°C für Polar-Versionen
- Inflation
- Automatisch durch Painter-Linie oder CO2-Zylinder; Inflation innerhalb 1 Minute (Throw-overboard)
- Notfall-packungen
- SOLAS A (Standard) oder SOLAS B
- Behälter-Material
- Starrer Fiberglas-Container mit Schaumstoff-Polsterung
- Stabilität
- Zwei unabhängige Auftriebskammern; bleibt stabil auch bei einer deflatierten Kammer
- DK+ Throw-overboard (4-35 Personen)
- DKF+ Davit-launched (12-35 Personen)
- S30 Extended Service Interval (alle Kapazitäten)
- RescYou Recreational Series (Yachting)
- Area: Jährliches Service-Intervall (SOLAS)Check: Inspekteur prüft auf Serviceetiketten-Datum (nicht älter als 12 Monate); Standard SOLAS erfordert vollständige Inspektion, Inflations-Test, Zylinder-Kontrolle, Ausrüstungs-Inventar (Pyrotechnik, Wasser, Rationen)
- Area: HRU (Hydrostatic Release Unit) - Austausch maximal alle 24 MonateCheck: Inspekteur verifiziert HRU-Verfallsdatum unabhängig vom Raft-Service-Datum; PSC prüft beide Daten separat; muss mit Raft-Modell kompatibel sein; Hammar H20 oder ähnliche zertifizierte Modelle verwenden
- Area: Painter-Linie und Weak-Link-SystemCheck: Inspekteur prüft: Painter permanent mit Schiff verbunden; Weak-Link korrekt an HRU angebracht; Weak-Link-Bruchfestigkeit 1.6-2.0 kN; rote Farbe und 30 ft (ca. 10m) Länge bei Throw-overboard; Befestigung muss Aufzugskraft aushalten und bei Schiffsuntergang unter Raft-Gewicht reißen
- Area: Behälter-Integrität und Lashing-StrapsCheck: Inspekteur kontrolliert: Behälter auf Risse, Verformungen, Wasserschäden; Lashing-Straps fest und unbeschädigt; Wiege/Cradle sicher befestigt; Container horizontal stabil gelagert; Siegel intakt
- Area: Davit-System Prüfung (nur DKF+-Modelle)Check: Inspekteur prüft: Davit mit Schnellen/Seilen verbunden; Raft-Anschlussgurte intakt; Laterale Impact-Prüfung: Raft muss Aufprall 3.5 m/s gegen Schiffswand aushalten; Wasser-Eintauch-Test aus 3m Höhe ohne Funktionsverlust; Launching-Muster dokumentieren
- Area: S30 Extended Service Interval - Jährliche Bordsinspektion (30-Monate-Option)Check: Inspekteur (Crew) führt 3-Schritt-Bordsinspektion durch: Test-Panel für Umgebung in Aluminium-Beutel; Sichtprüfung Container; keine elektrische Ausrüstung nötig; vollständiger Service alle 30 Monate an zertifizierter Viking-Station (statt 12 Monate Standard); keine Interval-Verlängerungen möglich für S30
Typ-universelle Inspektions-/Wartungspunkte fuer Life Rafts (Viking Life-Saving Equipment, Mega-Schwarm 2026-06). Per-Modell-Specs nicht auto-gefuellt.