"> Alfa Laval S.p.A. Alfa Laval Aalborg-XW-A3-16bar
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 80 verified suppliers & service companies for Alfa Laval S.p.A. in the Maritime Network Find suppliers →
Alfa Laval S.p.A.

Alfa Laval Aalborg-XW-A3-16bar

Alfa Laval Aalborg-XW-A3-16bar exhaust gas economizer (exhaust gas economizer). Evaporation 1200 kg/h, design pressure 16 bar, heating surface 28 m2, weight 3200 kg. Recovers waste heat from main engine exhaust for steam generation.

Alfa Laval S.p.A. Alfa Laval Aalborg-XW-A3-16bar

Components & Design

Component data being added…

Technical Data

boiler type Alfa Laval Aalborg Exhaust Gas Boiler / Economizer (Abgaskessel / Abgaswärmetauscher)

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Rohrverschlammung / Rußabbrand-Gefahr (Soot Fouling)

Visual inspection of gas side for soot buildup, exhaust temperature measurement: >10-20°C above setpoint indicates sludging; perform water flushing kit application (50 l/min, 0.4-0.6 MPa pressure); operate Soot-Blower daily 3x (caution: In case of uptake fire DO NOT blow down with steam due to H₂ fire hazard)

Rohrleckage / Korrosion / Erosion (Tube Leakage)

Internal inspection test (opening of sight glasses/hand ports): inspect tubes for wear, pitting, thinning; external inspection for soot deposits, blistering, sag; perform hydraulic pressure test at 1.25 × operating pressure for maximum 10 minutes

Druckbehälter-Klassbesichtigung / Periodische Inspektion

Class surveyor: Inspect all boilers >3.5 bar working pressure and >4.65 m² heating surface. Frequency: DNV/LLOYDS every 2 years up to 8 years old, then annually; 2 comprehensive internal inspections per 5-year period, interval maximum 36 months. Inspect internal surfaces (drums, headers) for sludging, corrosion, cracks.

Sicherheitsventile / Überdruckschutz

Safety valve test: opening at ≤3% above working pressure; test pressure 15% above working pressure for maximum 10 minutes (feedwater only for water level safety); pressure rise during test maximum 10% above design pressure at full load firing with stop valves closed.

Wasserspiegel-Schauglas / Schutzeinrichtungen

Sight glass visual inspection for highest, lowest, normal water level markings; protective devices without sight obstruction; test water cushion safety ball valve for function; check drain line for safety.

Refractory / furnace room (only for fired boilers); tube bundle cleaning (XS-TC7A helix tubes)

For Aalborg OL/D and similar burner boilers: inspect refractory material (membrane walls, furnace floor) for cracks, deformation, separation; remove carbon deposits. For XS-TC7A: clean helix tube bundle with water flush kit (7–8 hours on similar ships), if necessary add cleaning chemicals before discharge to slop tank.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #66147 · ✓ still in production