Class A-60 bulkhead - LOLAMAT Wall W50 LF A60
Class A-60 bulkhead - LOLAMAT Wall W50 LF A60 by KAEFER Schiffsausbau GmbH. DNV MED certificate MEDB00002Y9.
Inspector Detail
▸
Common issues
- Damaged or missing intumescent seals at cable and pipe penetrations, breaking the fire boundary
- Unauthorized penetrations cut for later cabling or piping without an approved fire stop
- Corrosion at panel fixings and supporting steelwork
- Water damage to the insulation core, reducing its fire-rated performance
- Damaged or missing certification/type-approval label, making verification against the fire control plan difficult
- Panel joints opening up from structural movement or poor original fitting
Inspection checklist
- Visual check of panel surface for damage, denting or corrosion
- Check condition of joints and seams between panels
- Verify every penetration through the boundary is properly fire-stopped
- Check certification/type-approval label is present, legible and matches the fire control plan
- Check for unauthorized openings or modifications
- Confirm no combustible material is fixed directly to or stored against the boundary
Service intervals
| Visual condition check | at each annual survey, and as part of routine fire safety rounds |
| Structural fire protection (SFP) plan verification | at intermediate and renewal survey, confirming as-built condition matches the approved plan |
Critical spares
- Fire-rated sealant/mastic matching the approved system for penetrations
- Intumescent collars/wraps for pipe and cable penetrations
- Replacement insulation batts matching the approved type
- Panel fixing brackets and fasteners
- Replacement gasket/seal strip for panel joints
Safety
- A compromised fire boundary can allow fire and smoke to spread between compartments - any penetration must be sealed with an approved system before the ship returns to service
- Hot work near or on an A-60 boundary requires a fire watch and permit
- Mineral wool insulation inside the panel can irritate skin and airways if disturbed - use appropriate PPE
Class survey
Surveyors check that structural fire protection boundaries match the approved fire control plan, that penetrations are properly sealed, and that no unauthorized openings have been made since the last survey; A-60 rating requires the boundary to withstand the standard fire test for 60 minutes without exceeding the temperature rise limit on the unexposed side
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →DNV type approval
Verified against the DNV Approval Finder — the certificate below is issued by DNV, not by us.
- Certificate
- MEDB00002Y9