OceanSphereENGINES
Library› Deck› Ship Structure & Outfitting› Fire Division Panel› KAEFER Schiffsausbau GmbH Class B-15 bulkhead - LOLAMAT Wall W25 LF B15
KAEFER Schiffsausbau GmbH

Class B-15 bulkhead - LOLAMAT Wall W25 LF B15

Fire Division Panel · Ship Structure & Outfitting

Class-certified type (DNV register) · technical data sheet not yet verified​​‍‍‌⁠‌⁠​‌​‌‌‌⁠⁠‌​‌⁠

The LOLAMAT Wall W25 LF B15 is a KAEFER Schiffsausbau GmbH marine bulkhead system intended to form a B-15 class interior division when installed as approved. It is used inside accommodation and service areas rather than as a structural hull bulkhead. The system combines lightweight interior panels, supporting structure and approved joints or edge details so that the complete assembly provides the required fire-separation performance. Its function differs from an A-class bulkhead because the B-class division is an interior fire boundary with a different approved construction and fire-resistance role. Doors, penetrations, cable transits and interfaces with ceilings or decks must preserve the certified arrangement. Cosmetic wall finishes do not replace the need for the underlying panel and joint construction to remain intact. Any dimensional or material variation from the approved W25 LF B15 system should be checked against the KAEFER approval documentation before repair or alteration.

Specifications

Technical data.

Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.

IMO ApprovedYes
Service

Service notes.

What our service work and the manufacturer documentation say about keeping this model running.

Inspect the bulkhead as part of accommodation and passive-fire-protection rounds, focusing on joints, edges, penetrations, impact damage and signs of moisture. Verify that later cable and pipe work has been properly fire-stopped and documented. Doors or hatches installed in the division should retain their own required rating and closing function. Repairs should reproduce the approved KAEFER construction rather than merely restore appearance. Panel composition, fixing pattern, joint detail and permitted repair dimensions must be taken from the approval and manufacturer documentation for the exact system.

Inspection

Common failures & inspection points

Inspection

Inspector Detail

Common issues

  • Surface damage (impact, delamination) exposing the core insulation material
  • Compromised penetrations (cable/pipe) where fire-stopping seals have degraded or were improperly reinstated after modification
  • Corrosion or damage to the panel's supporting steel framework
  • Loss of fire-rating documentation/certification traceability during refits
  • Water staining behind the panel indicating condensation or leaks affecting core integrity

Inspection checklist

  • Visual inspection for surface damage, delamination or panel deformation
  • Check condition of all cable/pipe penetrations and fire-stop seals for gaps or degradation
  • Verify doors/hatches within the bulkhead maintain the rated fire integrity
  • Check for unauthorized modifications (added penetrations, removed panels) since the last survey
  • Confirm fire-rating labels/certification plates are present and legible
  • Check the supporting frame and fixings for corrosion

Service intervals

Fire division visual inspectiontypically at each annual survey
Penetration/fire-stop seal check after hot work or refiteach time the division is affected

Typical intervals for this design class, not the manufacturer’s figures for your model. The manufacturer’s manual is binding.

Critical spares

  • Matching fire-rated replacement panel sections
  • Certified fire-stop sealant/collars for penetrations
  • Panel fixing hardware

Safety

  • Any unauthorized penetration or damaged seal breaches the fire division and can allow fire/smoke spread between compartments
  • Repairs must use materials certified to the same fire class - substituting uncertified material invalidates the division's rating
  • Hot work on or near B-class panels requires a fire watch, as core materials can be heat-sensitive even though the finished assembly is fire-rated

Class survey

B-class divisions are checked at survey for physical integrity, correct penetration sealing, and that no unauthorized modifications have compromised the certified fire rating; repairs or alterations typically require materials with matching or better class type approval to preserve the division's certificate.

Spares

Replacement Parts

Spare parts notes

Useful onboard or refit stock includes correctly identified replacement panels, approved trims, joint materials, fasteners and compatible fire-stopping products used with the certified bulkhead arrangement. Keep small quantities of matching decorative finish where appearance matters, but do not use decorative laminate as a substitute for a damaged structural panel. Documentation linking spare material to the approved B-15 system should be retained with the stock.

Classification

DNV type approval

Listed in the DNV Approval Finder at the time we recorded it. The certificate is issued by DNV, not by us; check its current status at DNV.

CertificateMEDB00002Y8
Open the certificate at DNV
Need this part?

Request a quote for this model.

Free of charge — send us your request for KAEFER Schiffsausbau GmbH equipment. Our team checks it and replies by e-mail.

For marine equipment hardly any maker or authorised dealer will name a price while the vessel is unknown. With the vessel details, availability and price can be settled faster; without them we may have to ask first, which costs a few days. If you are not allowed to name the vessel, a photo of the rating plate is enough — attach it below or send it as a reply to our confirmation e-mail.

Your contact details are not published. No account required.
Related models

Also in Fire Division Panel.

Other models of the same equipment type, KAEFER Schiffsausbau GmbH first.

By manufacturer BIP Industries Co., Ltd. GoseongHuanan Building Materials (Shenzhen)RockwoolThermal Ceramics UKUNIFRAXKCC Corporation Ltd. Gimcheon PlantShanghai ABM Rock WoolSejin Technical Industries Co., Ltd.CBG Systems InternationalTianjin Haimen Building Material Co., Ltd.KAEFER Schiffsausbau GmbHTianjin Huali Thermal Insulation Building Material Co., Ltd.Jiangsu Haojun Huake Housing Industrial Co., Ltd.NORAC A/SJiangyin Haisheng Marine Outfitting & Decoration Co., Ltd.All manufacturersSpare parts by equipmentNew here? Create a free account Can't read the plate? Try the nameplate scanner More like Class B-15 bulkhead - LOLAMAT Wall W25 LF B15
More than the data sheet shows

We answer by e-mail, never with an automatic reply.

Tell us what you need for this KAEFER Schiffsausbau GmbH Class B-15 bulkhead - LOLAMAT Wall W25 LF B15 — a part, a service call, a second opinion. Are you KAEFER Schiffsausbau GmbH? Claim this brand page.

Service engineer? Write the day report for this Class B-15 bulkhead - LOLAMAT Wall W25 LF B15 in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →

Frequently asked

Questions that come up with this equipment.

Is this model's data free?

Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.

Can you find a part for this exact model?

Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.

The specifications look wrong — what now?

Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.