SHS-36-056PK SWE-08-360PK
SHS-36-056PK SWE-08-360PK by Oriental Precision & Engineering Co., Ltd.. DNV MED certificate 4332702 Lux.
Inspector Detail
▸
Common issues
- Hull GRP deterioration (gel-coat cracking, delamination) from UV and weather exposure
- Corrosion of the on-load release hook mechanism affecting free operation
- Engine starting failure due to battery condition or fuel system issues after long standby periods
- Skate/ramp or launching structure corrosion affecting the freefall release
- Seat belt and internal fitting deterioration
- Painter line and towing bridle wear or incorrect rigging
- Hydrostatic interlock or release mechanism seizure from lack of exercising
Inspection checklist
- Visual inspection of the hull for cracks, delamination and structural damage
- Function test the on-load release gear per the maker's procedure and SOLAS/MSC.1/Circ.1206
- Start and run the engine; check cooling water, exhaust and fuel supply
- Check battery condition and charging system
- Inspect release hook, hydrostatic interlock and safety pin/lock arrangement
- Check painter, towing bridle and rigging for wear or damage
- Inspect seat belts, canopy hatches and internal emergency equipment inventory
- Check davit/cradle chocks and retaining arrangements
Service intervals
| Operational readiness inspection | monthly, per SOLAS requirements |
| On-load release gear thorough examination/overhaul | every 5 years per SOLAS/MSC.1/Circ.1206 - confirm against flag/class requirement |
| Annual survey and function test | annually, including simulated launch where required |
| Launching appliance service | annually per the maker's schedule |
Critical spares
- On-load release hook mechanism components
- Hydrostatic interlock unit
- Starting battery
- Engine cooling water impeller
- Seat belts
Safety
- On-load release gear failure is a well-documented cause of serious injury or death during drills - strict adherence to SOLAS drill procedures and maker instructions is required
- Freefall launch produces high deceleration forces on occupants
- Engine exhaust in an enclosed lifeboat
- Battery gas and acid hazards
- Never conduct drills without the required precautions and trained personnel
Class survey
Freefall lifeboats and their release gear are subject to SOLAS/MSC.1/Circ.1206 requirements, including annual thorough examination and 5-yearly overhaul of the on-load release gear by an authorized service provider, with certification retained onboard and reviewed at class/flag survey.
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →DNV type approval
Verified against the DNV Approval Finder — the certificate below is issued by DNV, not by us.
- Certificate
- 4332702 Lux