Hilfsdiesel (Generatorsatz) · Hilfsdiesel
The MAN L21/31 is a medium‑speed, four‑stroke auxiliary diesel engine delivering 750–1980 kW at 900–1000 rpm, designed for shipboard power generation with flexible fuel capability including HFO, VLSFO, MGO and methanol retrofits.
Haben Sie das Herstellerdatenblatt zu diesem Modell? Schicken Sie es mit dem Anfrageformular — wir prüfen es und nennen die Quelle.
Was unsere Servicearbeit und die Herstellerunterlagen zum Betrieb dieses Modells sagen.
Standard MAN 4-Stroke intervals.
| Fuel Injectors (overhaul/replacement) | 3,000 - 6,000 hours |
|---|---|
| Exhaust Valves (overhaul/replacement) | 6,000 - 12,000 hours |
| Cylinder Heads (overhaul/inspection) | 12,000 - 18,000 hours |
| Turbocharger (overhaul/inspection) | 12,000 - 18,000 hours |
| Piston Overhaul (inspection/ring replacement) | 12,000 - 18,000 hours |
| Connecting Rod Bearings (inspection/renewal) | 18,000 - 24,000 hours |
| Main Bearings (inspection/renewal) | 24,000 - 36,000 hours |
| Major Overhaul (depending on condition monitoring) | 24,000 - 36,000 hours |
| Cylinder Liner Wear | Max 0.6 - 0.8 mm (at top dead center, depending on specific engine variant and manufacturer spec) |
|---|---|
| Piston Ring Groove Wear | Max 0.15 - 0.2 mm (axial clearance increase from new) |
| Crankshaft Deflection | Max 0.05 - 0.1 mm (between adjacent main bearings, depending on engine length and class rules) |
| Main Bearing Clearances | Max 0.15 - 0.25 mm (radial, depending on shaft diameter) |
| Connecting Rod Bearing Clearances | Max 0.15 - 0.25 mm (radial, depending on shaft diameter) |
| Exhaust Valve Seat Recession | Max 1.5 - 2.0 mm (from new position, before replacement) |
| Turbocharger Rotor Axial Play | Max 0.15 - 0.25 mm |
| Turbocharger Rotor Radial Play | Max 0.3 - 0.5 mm |
Die Bereiche sind für diese Bauklasse typisch. Maßgeblich sind stets die Herstellerunterlagen zur jeweiligen Seriennummer.
During annual surveys, surveyors will verify operational parameters (pressures, temperatures, speeds), visually inspect for leaks, damage, and proper securing of components. Functionality of safety devices (overspeed, low LO pressure, high CW temp shutdowns) and alarm systems are always checked. Engine logbook and maintenance records are reviewed. For intermediate and special surveys (typically every 5 years), a more comprehensive inspection is required. This often involves opening cylinder heads, pistons, connecting rod bearings, and selected main bearings for inspection and measurement. Crankshaft deflection measurement is mandatory. The integrity of the fuel oil system, including high-pressure lines, shielding, and quick-closing valves, is thoroughly checked. Emissions compliance (if applicable) and emergency shutdown functionality are also key focus areas. Documentation of condition monitoring, spare parts, and maintenance is crucial for demonstrating compliance.
Geschätzte Lebensdauer: 80,000 - 120,000 hours (with proper maintenance and scheduled major overhauls at 24,000-36,000 hour intervals)
MAN PrimeServ global.
Kostenlos — senden Sie uns Ihre Anfrage zu MAN Energy Solutions-Ausrüstung. Unser Team prüft sie und antwortet per E-Mail.
Weitere Modelle desselben Ausrüstungstyps, zuerst MAN Energy Solutions.
Sagen Sie uns, was Sie für diesen MAN Energy Solutions L21/31 benötigen — ein Ersatzteil, einen Serviceeinsatz, eine zweite Meinung. Sind Sie MAN Energy Solutions? Diese Herstellerseite beanspruchen.
Servicetechniker? Schreiben Sie den Tagesbericht für diesen L21/31 in OceanSphere Work — Fotos, Stunden und Teile, als PDF für den Reeder. 14 Tage kostenlos testen →
Ja. Technische Daten, Dokumente und Servicehinweise zu diesem Modell sind ohne Konto lesbar. Ein Konto bringt gespeicherte Suchen und Anfragen dazu, es nimmt nichts weg.
Ja. Nennen Sie uns Hersteller, Modell und Bedarf — ein Mensch liest jede Anfrage und antwortet per E-Mail.
Schicken Sie uns das Typenschild oder den richtigen Wert. Wir prüfen ihn gegen das Herstellerdatenblatt oder den Klassifikationsdatensatz und aktualisieren die Seite.