Auxiliary Engine (Generator Set) · Auxiliary Engines
The MAN L21/31 is a medium‑speed, four‑stroke auxiliary diesel engine delivering 750–1980 kW at 900–1000 rpm, designed for shipboard power generation with flexible fuel capability including HFO, VLSFO, MGO and methanol retrofits.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
What our service work and the manufacturer documentation say about keeping this model running.
Standard MAN 4-Stroke intervals.
| Fuel Injectors (overhaul/replacement) | 3,000 - 6,000 hours |
|---|---|
| Exhaust Valves (overhaul/replacement) | 6,000 - 12,000 hours |
| Cylinder Heads (overhaul/inspection) | 12,000 - 18,000 hours |
| Turbocharger (overhaul/inspection) | 12,000 - 18,000 hours |
| Piston Overhaul (inspection/ring replacement) | 12,000 - 18,000 hours |
| Connecting Rod Bearings (inspection/renewal) | 18,000 - 24,000 hours |
| Main Bearings (inspection/renewal) | 24,000 - 36,000 hours |
| Major Overhaul (depending on condition monitoring) | 24,000 - 36,000 hours |
| Cylinder Liner Wear | Max 0.6 - 0.8 mm (at top dead center, depending on specific engine variant and manufacturer spec) |
|---|---|
| Piston Ring Groove Wear | Max 0.15 - 0.2 mm (axial clearance increase from new) |
| Crankshaft Deflection | Max 0.05 - 0.1 mm (between adjacent main bearings, depending on engine length and class rules) |
| Main Bearing Clearances | Max 0.15 - 0.25 mm (radial, depending on shaft diameter) |
| Connecting Rod Bearing Clearances | Max 0.15 - 0.25 mm (radial, depending on shaft diameter) |
| Exhaust Valve Seat Recession | Max 1.5 - 2.0 mm (from new position, before replacement) |
| Turbocharger Rotor Axial Play | Max 0.15 - 0.25 mm |
| Turbocharger Rotor Radial Play | Max 0.3 - 0.5 mm |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
During annual surveys, surveyors will verify operational parameters (pressures, temperatures, speeds), visually inspect for leaks, damage, and proper securing of components. Functionality of safety devices (overspeed, low LO pressure, high CW temp shutdowns) and alarm systems are always checked. Engine logbook and maintenance records are reviewed. For intermediate and special surveys (typically every 5 years), a more comprehensive inspection is required. This often involves opening cylinder heads, pistons, connecting rod bearings, and selected main bearings for inspection and measurement. Crankshaft deflection measurement is mandatory. The integrity of the fuel oil system, including high-pressure lines, shielding, and quick-closing valves, is thoroughly checked. Emissions compliance (if applicable) and emergency shutdown functionality are also key focus areas. Documentation of condition monitoring, spare parts, and maintenance is crucial for demonstrating compliance.
Estimated lifetime: 80,000 - 120,000 hours (with proper maintenance and scheduled major overhauls at 24,000-36,000 hour intervals)
MAN PrimeServ global.
Free of charge — send us your request for MAN Energy Solutions equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, MAN Energy Solutions first.
Tell us what you need for this MAN Energy Solutions L21/31 — a part, a service call, a second opinion. Are you MAN Energy Solutions? Claim this brand page.
Service engineer? Write the day report for this L21/31 in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.