"> TGE Marine Gas Engineering / Chart Industries (Germany/USA) LNG Fuel Tank + FGSS
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
TGE Marine Gas Engineering / Chart Industries (Germany/USA)

LNG Fuel Tank + FGSS

TGE Marine Gas Engineering (Bonn, Teil von Chart Industries USA seit 2022) ist Spezialist für kryogene Tank-Systeme. TGE liefert die LNG-Tanks (Type C Druckbehälter oder Type B prismatisch) als Kernkomponente des FGSS. Auf LNG-betriebenen Containerschiffen, Kreuzfahrtschiffen und Fähren.

TGE Marine Gas Engineering / Chart Industries (Germany/USA) LNG Fuel Tank + FGSS
LNG fuel storage 100-20,000 m³
Capacity
LNG as Fuel / Cargo
Medium

Components & Design

Component data being added…

Technical Data

type LNG Tank + Fuel Gas Supply System
variant count approx 4
period start year 2000
drive type N/A (tank) + Electric (FGSS)
construction Type C pressure vessel or Type B/Membrane containment, insulation, FGSS

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Tank insulation degradation causing excessive BOG
Relief valve weeping from pressure cycling
Tank support structure fatigue
Secondary barrier integrity loss (membrane type)

Service & Maintenance

Tank insulation inspection at drydock. Relief valve test annually. Tank support inspection annually. Secondary barrier test (membrane) per GTT/Class requirements.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

TGE Marine/Chart Industries (Bonn, Germany). Lead time: 6-16 weeks for tank components.
Equipment Model #38008 · ✓ still in production