OceanSphere
Engines
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
Wärtsilä Gas Solutions (Finland/Norway)

LNGPac Fuel Gas Supply System

Wärtsilä LNGPac ist das weltweit meistinstallierte LNG-Kraftstoffsystem mit geschätzt 40% Marktanteil. LNG als Schiffskraftstoff (anstelle von HFO/MGO) wird durch den IMO 2020 Schwefelgrenzwert und EU ETS vorangetrieben. Der IMO IGF Code (International Code of Safety for Ships using Gases or other Low-flashpoint Fuels) regelt die Sicherheitsanforderungen. LNGPac umfasst den kompletten Kraftstoffpfad vom LNG-Tank über Verdampfer und Gasregeleinheit bis zum Motor.

LNG fuel storage 50-5,000 m³
Capacity
380-690V
Voltage
LNG (Liquefied Natural Gas) as Fuel
Medium

Components & Design

Component data being added…

Technical Data

type LNG Fuel Gas Supply System (FGSS)
variant count approx 5
period start year 2010
drive type Electric
construction LNG tank (Type C/IMO), vaporizer, gas valve unit (GVU), control system, bunkering station

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

LNG tank pressure buildup from Boil-Off Gas (BOG) management failure
Vaporizer tube leak from thermal cycling
Gas valve unit (GVU) solenoid failure
Bunkering connection leak
Gas detection system false alarm

Service & Maintenance

Gas detection calibration quarterly. GVU function test before each gas operation. LNG tank relief valve test annually. Bunkering connection integrity test before each bunkering. IGF Code compliance check at annual survey.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Wärtsilä Gas Solutions (Moss, Norway). Lead time: 3-8 weeks. GVU components: 2-4 weeks. Gas detection sensors: keep onboard.
Equipment Model #38006 · ✓ still in production