OceanSphereENGINES
Bibliothek› Engine Room› Hilfsdiesel› Hilfsdiesel (Generatorsatz)› Daihatsu 5/6 DK(M)-26(e)(F)(L)

5/6 DK(M)-26(e)(F)(L)

Hilfsdiesel (Generatorsatz) · Hilfsdiesel

Technische Daten aus Hersteller- oder Klassequellen · noch nicht von Hand geprüft​​‌⁠‌​⁠‌​⁠⁠⁠‍​⁠‍​‌‍‍
Per manufacturer datasheetFörderleistung
HFO / VLSFO / MGOMedium
Daihatsu im SpecCodex-Register — zur Markenseite →

The Daihatsu 5/6 DK(M)-26(e)(F)(L) is a low‑speed, four‑stroke auxiliary diesel engine featuring turbocharging, intercooling and direct injection, designed for shipboard power generation and hotel load.

Technische Daten

Technische Daten.Referenz — nicht verifiziert

Haben Sie das Herstellerdatenblatt zu diesem Modell? Schicken Sie es mit dem Anfrageformular — wir prüfen es und nennen die Quelle.

Specific Fuel Consumption (DK-28)178-190 g/kWh
Bore Mean Effective Pressure (Pme)DK-26: 2.11-2.43 MPa; DK-28: 2.33-2.43 MPa
Piston Speed (720 rpm)DK-26: 9.12 m/sec; DK-28: 9.36 m/sec
Weight (8DK-28e approx.)46 tonnes / 9500-13500 kg depending on variant
Design Type4-stroke, turbocharged, intercooled, direct injection
Emission StandardIMO Tier II/III
LubricationForced system with water-cooled exhaust manifold
Service

Servicehinweise.

Was unsere Servicearbeit und die Herstellerunterlagen zum Betrieb dieses Modells sagen.

Servicing per the manufacturer's manual and classification society requirements. Annual inspection at class survey. Stock spare parts as specified by the manufacturer.

Inspektion

Inspektor-Detail ✓ verifiziert

Häufige Probleme

  • Fuel injector nozzle wear or clogging, leading to poor combustion, increased exhaust temperatures, and potential cylinder overload.
  • Cylinder liner and piston ring wear, resulting in increased lube oil consumption, excessive blow-by, and reduced compression.
  • Bearing wear (main and connecting rod) due to lube oil degradation, contamination, or insufficient lubrication, leading to increased clearances and risk of seizure.
  • Turbocharger bearing failure or impeller damage from foreign object ingress, imbalanced rotation, or prolonged high-temperature operation.
  • Cooling water system blockages (e.g., scale, marine growth) or pump impeller wear, causing inadequate cooling and engine overheating.
  • Exhaust manifold cracks or gasket leaks, leading to hot gas escape, reduced turbocharger efficiency, and potential fire hazard.
  • Control system sensor failures (e.g., lube oil pressure, cooling water temperature, engine speed) causing nuisance alarms or unexpected shutdowns.
  • Vibration-induced loosening of fasteners, pipework, or electrical connections, leading to leaks, electrical faults, or component damage.

Prüfliste

  • Conduct a thorough visual inspection for any signs of oil, fuel, or cooling water leaks from the engine block, piping, and connections.
  • Observe exhaust gas color and opacity during operation; it should be clear or a light haze at load. Black smoke indicates poor combustion, white smoke indicates water, blue smoke indicates lube oil.
  • Monitor engine vibration levels and listen for any unusual noises (knocking, grinding, whistling) that may indicate internal issues.
  • Verify all critical gauge readings (lube oil pressure, cooling water temperature, exhaust gas temperature per cylinder, fuel pressure) are within the manufacturer's specified normal operating ranges.
  • Inspect the fuel injection system for external leaks, proper securing of high-pressure lines, and general condition of fuel pumps and injectors.
  • Check lube oil level and visually assess its condition for signs of contamination (water, fuel dilution, carbon particles).
  • Inspect the cooling water system for leaks, proper flow, and cleanliness of filters/strainers. Check expansion tank level and condition.
  • Test emergency shutdown devices (overspeed trip, low lube oil pressure shutdown, high cooling water temperature shutdown) as per class requirements.
  • Examine engine foundation bolts for tightness, signs of corrosion, or any movement/cracking in the engine seating.
  • Inspect air intake filters for cleanliness and integrity, ensuring no restriction to combustion air flow.

Wartungsintervalle

Daily/Weekly ChecksVisual inspection, fluid levels, log readings, general operational parameters.
250-500 hoursLube oil change, lube oil filter replacement.
500-1000 hoursFuel filter replacement (primary & secondary), air filter cleaning/replacement.
1000-2000 hoursFuel injector overhaul (nozzle tip replacement, pressure test), valve clearance adjustment.
4000-6000 hoursCylinder head overhaul (valve grinding, seat inspection, spring replacement), turbocharger inspection/overhaul, fuel pump calibration.
8000-12000 hoursPiston inspection (rings, grooves), connecting rod bearing inspection/replacement, main bearing inspection.
24000-36000 hoursMajor overhaul (liner inspection/replacement, crankshaft deflection check, comprehensive bearing replacement).

Typische Verschleißgrenzen

Cylinder LinerMax wear (ovality/taper) 0.6 - 0.8 mm. Replacement recommended beyond this.
Piston Ring GapMax end gap 1.0 - 1.5 mm (refer to specific ring type in manual).
Connecting Rod Bearing ClearanceMax 0.15 - 0.20 mm (measured with plastigauge or micrometer).
Main Bearing ClearanceMax 0.20 - 0.25 mm (measured with plastigauge or micrometer).
Crankshaft DeflectionMax 0.03 - 0.05 mm (measured at each web, varies with engine size/type).
Valve Seat RecessionMax 0.5 - 1.0 mm from original position (check manual for specific limits).

Die Bereiche sind für diese Bauklasse typisch. Maßgeblich sind stets die Herstellerunterlagen zur jeweiligen Seriennummer.

Kritische Ersatzteile

  • Full set of fuel filters (primary and secondary elements).
  • Full set of lube oil filters (elements).
  • Air filter elements (if applicable).
  • Fuel injector nozzle tips and associated gaskets/washers (one set per cylinder).
  • Common O-rings and gaskets (e.g., cylinder head cover, inspection covers, critical pipe flanges).
  • Connecting rod bearings (one set).
  • Piston rings (one complete set per cylinder).
  • Critical sensors (e.g., lube oil pressure, cooling water temperature, overspeed pickup).
  • Drive belts (if belt-driven pumps or alternators are present).
  • Fuel pump elements (if individual pumps per cylinder).

Sicherheit

  • Fire Hazard: Leaks of fuel or lube oil onto hot engine surfaces (exhaust manifold, turbocharger) pose a significant fire risk. Ensure proper lagging/insulation and effective leak detection/containment.
  • Rotating Machinery: Exposed rotating parts (flywheel, coupling, belts, cooling fan) present entanglement hazards. All guards must be securely in place and maintained.
  • High-Pressure Fuel Lines: Rupture of high-pressure fuel lines can spray fuel, causing fire or severe injury. Double-walled piping or effective spray shields are critical and must be intact.
  • Hot Surfaces: Exhaust system components and engine block can reach high temperatures, causing severe burns. Proper insulation, lagging, and clear warning signs are essential.
  • Exhaust Gas Leaks: Leaks from the exhaust system can release toxic gases (e.g., Carbon Monoxide) into the engine room, posing a serious health risk. Ensure exhaust system integrity and proper ventilation.

Klassenbesichtigung

For the Daihatsu DK-26 auxiliary engine, the class surveyor will typically focus on: 1. Operational Test: Witness engine start, stable running at various loads, and emergency stop from local and remote positions. 2. Safety Devices: Verification of overspeed trip, low lube oil pressure shutdown, high cooling water temperature shutdown, and emergency stop buttons. These must be tested and confirmed functional. 3. Fuel Oil System: Thorough inspection for leaks, proper shielding of high-pressure lines, condition of filters, and integrity of fuel supply/return lines, including quick-closing valves. 4. Lubrication System: Check for leaks, oil cooler condition, proper functioning of lube oil pump, and oil mist detector (if fitted). 5. Cooling System: Inspection of pumps, heat exchangers, piping for leaks or corrosion, and proper temperature control. 6. Exhaust System: Check for leaks, condition of insulation/lagging, integrity of expansion bellows, and exhaust gas economizer (if fitted). 7. Engine Foundation: Visual inspection of foundation bolts for tightness, signs of corrosion, or cracking in the foundation structure. 8. Documentation: Review of engine logbook, maintenance records, spare parts inventory, and previous survey reports to confirm adherence to planned maintenance and manufacturer guidelines. 9. General Condition: Overall cleanliness, absence of excessive corrosion, proper securing of components and wiring, and general engine room housekeeping.

Geschätzte Lebensdauer: 60,000 - 80,000 hours before major overhaul (e.g., crankshaft out, full bearing and liner replacement). Well-maintained units with diligent intermediate overhauls can exceed 100,000 hours.

Ersatzteile

Verschleißteile

Hinweise zu Ersatzteilen

Spare parts via Daihatsu Diesel Mfg. Co., Ltd. Moriyama Division or authorised distribution partners. Lead time: 2-6 weeks.

Klassifikation

DNV-Typzulassung

Im DNV Approval Finder gelistet, Stand unserer Erfassung. Das Zertifikat stellt DNV aus, nicht wir; den aktuellen Status prüfen Sie bei DNV.

ZertifikatTAM00000C4
Zertifikat bei DNV öffnen
Dieses Teil gesucht?

Angebot für dieses Modell anfragen.

Kostenlos — senden Sie uns Ihre Anfrage zu Daihatsu-Ausrüstung. Unser Team prüft sie und antwortet per E-Mail.

Für Schiffsausrüstung nennt kaum ein Hersteller oder Vertragshändler einen Preis, solange das Schiff unbekannt ist. Mit Schiffsangaben lässt sich Verfügbarkeit und Preis schneller klären; fehlen sie, müssen wir unter Umständen zuerst nachfragen, was einige Tage kostet. Dürfen Sie das Schiff nicht nennen, reicht ein Foto des Typenschilds — hängen Sie es unten an oder schicken Sie es als Antwort auf unsere Bestätigungsmail.

Ihre Kontaktdaten werden nicht veröffentlicht. Kein Konto nötig.
Verwandte Modelle

Auch in Hilfsdiesel (Generatorsatz).

Weitere Modelle desselben Ausrüstungstyps, zuerst Daihatsu.

Nach Hersteller CaterpillarMAN Energy SolutionsWärtsiläVolvo PentaScaniaMaK (Caterpillar)CumminsDeerePerkinsDaihatsuHanshinMTUYanmarBaudouinDeutzAlle HerstellerErsatzteile nach AusrüstungNeu hier? Kostenloses Konto anlegen Typenschild unleserlich? Probieren Sie den Typenschild-Scanner Alle Daihatsu-Modelle Ähnliche wie 5/6 DK(M)-26(e)(F)(L)
Mehr als das Datenblatt zeigt

Wir antworten per E-Mail, nie mit einer Automatik.

Sagen Sie uns, was Sie für diesen Daihatsu 5/6 DK(M)-26(e)(F)(L) benötigen — ein Ersatzteil, einen Serviceeinsatz, eine zweite Meinung. Sind Sie Daihatsu? Diese Herstellerseite beanspruchen.

Servicetechniker? Schreiben Sie den Tagesbericht für diesen 5/6 DK(M)-26(e)(F)(L) in OceanSphere Work — Fotos, Stunden und Teile, als PDF für den Reeder. 14 Tage kostenlos testen →

Häufig gefragt

Fragen, die bei dieser Ausrüstung aufkommen.

Sind die Daten dieses Modells kostenfrei?

Ja. Technische Daten, Dokumente und Servicehinweise zu diesem Modell sind ohne Konto lesbar. Ein Konto bringt gespeicherte Suchen und Anfragen dazu, es nimmt nichts weg.

Können Sie ein Teil genau für dieses Modell finden?

Ja. Nennen Sie uns Hersteller, Modell und Bedarf — ein Mensch liest jede Anfrage und antwortet per E-Mail.

Die Angaben scheinen falsch zu sein — was jetzt?

Schicken Sie uns das Typenschild oder den richtigen Wert. Wir prüfen ihn gegen das Herstellerdatenblatt oder den Klassifikationsdatensatz und aktualisieren die Seite.