OceanSphere
Engines
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 2 verified suppliers & service companies for Seatrax Inc. in the Maritime Network Find suppliers →
Seatrax Inc.

S10832

Seatrax Inc. S10832 — Offshore pedestal crane (Series 108) for bottom-supported structures and MODUs; 200 ft and 170 ft boom configurations documented.

Inspector Detail

Common issues

  • Hoist and boom-hoist wire rope wear, corrosion or broken wires
  • Slew bearing wear producing excessive backlash or play
  • Hydraulic cylinder seal leakage on boom hoist/luffing cylinders
  • Load moment indicator (LMI) sensor drift or calibration error
  • Sheave groove and pin wear at the boom head
  • Structural fatigue cracking at boom welds and pin connections
  • Slew and hoist brake lining wear

Inspection checklist

  • Visual structural inspection of boom, pedestal and jib for cracks or deformation
  • NDT (MPI/dye penetrant) of load-bearing pins, boom foot and sheave pins
  • Wire rope condition - broken wires, diameter reduction, lubrication
  • Slew bearing bolt torque and backlash check
  • Hydraulic system pressure test and cylinder seal inspection
  • Load moment/limiter (LMI) function and calibration test
  • Hoist and slew brake function test
  • Anti-two-block and overload protection function test
  • Sheave and pin lubrication check
  • Proof/load test per class requirement

Service intervals

Annual thorough examination (class/statutory) 12 months
Proof load test typically every 4-5 years - confirm against class and flag requirement
Wire rope inspection monthly to quarterly, replace on discard criteria regardless of calendar interval
Hydraulic oil and filter change per the maker's schedule, commonly 2000-4000 running hours or annually
Slew bearing and gearing lubrication per the maker's schedule, commonly 250-500 hours or 3-6 months
LMI calibration check annually or after any major repair

Typical wear limits

Hoist wire rope discard typically discard per ISO 4309 guidance - more than about 10 randomly distributed broken wires in one lay, or roughly 7% diameter reduction - confirm against the class wire rope standard applied to this crane
Slew bearing backlash trend against the maker's commissioning baseline; growing axial/radial play indicates raceway wear - confirm against Seatrax's maintenance manual limits
Sheave groove wear consider renewal once groove wear reaches roughly 10% of rope diameter or shows sharp-edged wear - confirm against the maker's limits for this sheave size

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Hoist wire rope of the correct diameter and construction for the winch drum
  • Boom hoist/luffing cylinder seal kits
  • Sheave bushings and pins
  • Brake linings/pads for hoist and slew brakes
  • Slew bearing (long-lead item, order well ahead of need)

Safety

  • Suspended load / dropped object hazard - never work under a raised boom without positive mechanical support
  • Hydraulic accumulators hold stored pressure - isolate and bleed down before opening circuits
  • LMI/overload protection must never be bypassed - it is the primary safeguard against structural overload
  • Slew ring and boom pivot pinch points during operation
  • High-pressure hydraulic fluid injection injury risk from pinhole leaks

Class survey

Falls under lifting appliance / Continuous Survey Machinery rules - class wants annual thorough examination records, NDT reports on critical pins and welds, current wire rope certificates, and the 4- or 5-yearly proof load test certificate; LMI calibration records should be retained and produced on request.

Estimated lifetime: Offshore pedestal cranes of this class are usually design-lifed in years (commonly on the order of 20-25 years) rather than hours, with wire ropes, seals, bearings and bushings replaced on condition throughout that life - confirm against Seatrax's design life statement for the Series 108.

Components & Design

Component data being added…

Technical Data

SWL t 310 (onboard, 160 ft boom, 35 ft radius) / 155 (offboard, 160 ft boom, 55 ft radius); API Max Structural 510 t
radius m 9.1 – 61.0

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Structural inspection of kingpost, boom chords, lattice members and gantry for cracks, corrosion, deformation and weld integrity per API 2C

Structural inspection of kingpost, boom chords, lattice members and gantry for cracks, corrosion, deformation and weld integrity per API 2C

Wire rope inspection: check all hoist cables (main, auxiliary, boom suspension) for broken wires, kinks, corrosion, reduction in diameter and proper reeving

Wire rope inspection: check all hoist cables (main, auxiliary, boom suspension) for broken wires, kinks, corrosion, reduction in diameter and proper reeving

Hydraulic system inspection: check hoses, fittings, cylinders, valves and HPU for leaks, pressure drop and fluid condition; verify relief valve settings

Hydraulic system inspection: check hoses, fittings, cylinders, valves and HPU for leaks, pressure drop and fluid condition; verify relief valve settings

Slew ring and slew drive inspection: check bearing wear, backlash, lubrication and bolt torque on slew ring fasteners

Slew ring and slew drive inspection: check bearing wear, backlash, lubrication and bolt torque on slew ring fasteners

Hoist brake inspection: inspect draw-works drum band brakes and hydraulic brakes for lining wear, adjustment and proper holding capacity under load test

Hoist brake inspection: inspect draw-works drum band brakes and hydraulic brakes for lining wear, adjustment and proper holding capacity under load test

Anti-two-block (ATB) system functional test: verify Seatrax mechanical ATB device activates correctly and disables hoist motion before two-block contact

Anti-two-block (ATB) system functional test: verify Seatrax mechanical ATB device activates correctly and disables hoist motion before two-block contact

Load chart and rated capacity indicator (RCI) / load moment indicator (LMI) calibration check: verify displayed loads against known test weights at multiple rad

Load chart and rated capacity indicator (RCI) / load moment indicator (LMI) calibration check: verify displayed loads against known test weights at multiple radii

Pedestal, base frame and deck attachment inspection: check for cracking, corrosion, loose or missing fasteners, and integrity of deck penetrations/welds

Pedestal, base frame and deck attachment inspection: check for cracking, corrosion, loose or missing fasteners, and integrity of deck penetrations/welds

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #152794 · ✓ still in production