OceanSphere
Engines
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 1 verified suppliers & service companies for Pettit Marine Paint in the Maritime Network Find suppliers →
Pettit Marine Paint

EZ Poxy 2 Two-Part Polyurethane Enamel

Pettit Marine Paint EZ Poxy 2 Two-Part Polyurethane Enamel — High-performance topside and deck enamel for above-waterline applications with superior gloss and wear resistance.

Components & Design

Component data being added…

Technical Data

coating type Two-part catalyzed silicone polyurethane enamel
VOC g l 368
DFT microns 38
volume solids pct 53
coverage sqft per gal 570
mix ratio 4:1
application temp min F 50
application temp max F 90
pot life hours 70F 3
min coats 2

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Surface preparation and substrate condition assessment before application

Surface preparation and substrate condition assessment before application

Gloss retention and UV resistance evaluation at 6-month and 12-month intervals

Gloss retention and UV resistance evaluation at 6-month and 12-month intervals

Inspection for paint chalking, fading, or discoloration indicating UV damage

Inspection for paint chalking, fading, or discoloration indicating UV damage

Check for blistering, peeling, or adhesion failure at paint edges and seams

Check for blistering, peeling, or adhesion failure at paint edges and seams

Evaluate coverage uniformity and application quality (minimum 2 coats required)

Evaluate coverage uniformity and application quality (minimum 2 coats required)

Inspect for mechanical damage, chips, cracks, or impact marks

Inspect for mechanical damage, chips, cracks, or impact marks

Monitor for mold, mildew, or algae growth on coated surfaces

Monitor for mold, mildew, or algae growth on coated surfaces

Verify proper curing and hardness before placing vessel in service (minimum 24 hours at 50-70°F)

Verify proper curing and hardness before placing vessel in service (minimum 24 hours at 50-70°F)

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #151881 · ✓ still in production