"> Wilhelmsen Unitor Deck Foam System
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
Wilhelmsen Unitor

Deck Foam System

Wilhelmsen Unitor Deck Foam System — Upper deck protection, cargo handling areas, deck-level fire suppression on vessels.

Components & Design

Component data being added…

Technical Data

System Type Fixed foam fire suppression system for marine decks
Foam Generator Models UFG-30, UFG-60, UFG-90
Foam Production Capacity UFG-30 20 cubic m/min nominal at 5-7 bar
Foam Production Capacity UFG-60 40 cubic m/min nominal at 5-7 bar
Foam Production Capacity UFG-90 60 cubic m/min nominal at 5-7 bar
Concentration Ratio Standard 3% chemical to 97% seawater (or fresh water)
Foam Concentrate Used Unitor High Expansion Foam Concentrate 2%, expansion ratio up to 940:1
Foam Monitor Quantity Directional monitors (typical 8 units on upper deck)
Tank Capacity Options Horizontal tanks 1.0-25.0 m³; Vertical tanks 50-900 litres
Proportioner Models PP 50/20 (500 l/min), PP 80/20 (1200 l/min), PP 100/50 (3100 l/min)
System Components Foam liquid tank, pump, proportioner, piping, generator, alarms, sea water pump, control panels

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Foam concentrate level verification and expiration date check

Verify adequate foam chemical levels in storage tanks; confirm concentrate has not exceeded shelf life (check product date codes); test foam mixing ratio accuracy with graduated measurement device

System pressure verification and pump operational status

Confirm fire/foam main isolating valves are in correct position; verify fire pump operation achieves minimum main pressure of 0.6 MPa; test pressure gauges on proportioners and generators

Foam generator and proportioner function testing

Test foam generator production rate against nameplate specifications (UFG models: 20-60 m³/min nominal at 5-7 bar); verify proportioner delivers correct concentrate concentration (1%, 3%, or 6%); inspect for blockages in generator nozzles

Piping, valve, and component corrosion inspection

Inspect all foam piping, monitor valve connections, and proportioner components for visible corrosion, scale buildup, or physical damage; check for proper coating integrity on stainless steel components; verify no leaks at connection points

System discharge and alarm testing

Test audible and visible alarm systems for functionality; verify discharge nozzles and monitors spray pattern and reach distance; inspect eductor valve operation; perform test discharge to confirm proper foam generation and mixing (follow operational procedures to avoid directing foam at ignition sources until foam appears at nozzle)

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #148768 · ✓ still in production