Common issues
- Internal plate leakage from thermal fatigue cracking after years of cycling
- Fouling/scaling on the water side reducing heat transfer, seen as rising approach temperature
- Leak-detection port on the double-wall safety channel weeping, indicating a breached plate
- Brazed joint corrosion at connections where dissimilar metals or poor water treatment is present
- Reduced flow from partial blockage, since a brazed plate pack cannot be mechanically opened for cleaning
- Copper braze attack from aggressive or high-chloride cooling water
Inspection checklist
- Check pressure drop and approach temperature against the commissioning baseline to detect fouling
- Inspect the leak-detection/drainage port on the safety channel for any trace of fluid
- Verify insulation and connections are free of external corrosion or weeping
- Confirm operating pressure and temperature remain within the plate rating
- Review water treatment/dosing records for the cooling circuit
- Chemically clean (CIP), rather than mechanically open, per manufacturer instructions if fouling is suspected
Service intervals
| Performance check (approach temperature, pressure drop) vs baseline | 6 months |
| Leak-detection port inspection | at each engine room round, minimum monthly |
| Chemical (CIP) cleaning if fouling indicated | as needed, guided by performance trend |
| Full external and connection inspection | annually or at class survey |
Typical wear limits
| Maximum rated operating pressure/temperature | 30 bar / +200 C as stated by the manufacturer - never exceed, confirm against the nameplate for this specific unit |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Critical spares
- Complete replacement unit (brazed plate packs are not field-repairable or re-brazable)
- Gaskets/seals for connection flanges (not the internal brazed joints)
- Pressure and temperature sensors/gauges fitted to the unit
- Isolation valves and strainer elements on the connecting pipework
Safety
- The double-wall design exists specifically to stop the two media mixing if one plate pack leaks - never bypass or blank the drainage/detection port
- Unit can be hot and under pressure; isolate and depressurise both circuits before any connection work
- Do not attempt to mechanically open a brazed plate pack - it is not designed to be disassembled
Class survey
Class treats the leak-detection/drain port on double-wall safety heat exchangers as the key survey item - surveyors expect it logged as checked and dry at each round, since it is the main external evidence that the internal barrier between the two media is intact.
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Common failures & inspection points
Visual inspection for voids, porosity and predetermined fracture points in solder joints; pressure test (helium-hydrogen test gas mixture: 95% nitrogen + 5% hydrogen) for detection of microscopically small leaks through hydrogen diffusion
Visual inspection for corrosion scars, surface rust, intergranular corrosion and pitting on plate surfaces and solder lines; surface roughness measurement for early detection of erosion in aggressive media
Surface crack inspection by penetrant testing (penetrant method) or eddy current testing; thermal load monitoring through pressure and temperature difference measurement; vibration testing during rapid temperature changes
Pressure test (operating pressure + 50%), leak tests with hydrogen gas detectors; inspection for deterioration of seal through swelling or hardening; inspection of leakage gap in double-wall designs (GPLS, SPL)
Measurement of current pressure drop and comparison with nominal value; inspection flushing test with test fluid to detect deposits and contamination; cleaning when limit values are exceeded; inspection of filters for degree of contamination
Type-general inspection and maintenance points for this equipment category — not model-specific.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →