Turbocharger · Turbochargers
MAN ES Turbocharging TCT 12 — TCT, 55000 kW max.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Compressor/Turbine Water Wash/Dry Clean | 500 - 1000 running hours (or as indicated by performance drop) |
|---|---|
| Bearing Inspection/Replacement | 8,000 - 12,000 running hours |
| Minor Overhaul (Inspection of rotor, nozzle ring, diffuser, bearings, seals) | 16,000 - 24,000 running hours |
| Major Overhaul (Complete disassembly, inspection, replacement of worn parts, balancing) | 24,000 - 36,000 running hours |
| Journal Bearing Clearance | Max allowable increase from new specification: 0.10 - 0.15 mm (e.g., new 0.15-0.25mm, max 0.35-0.40mm). |
|---|---|
| Thrust Bearing Axial Play | Max allowable increase from new specification: 0.05 - 0.10 mm. |
| Rotor Shaft Run-out | Max allowable run-out at bearing journals: 0.02 - 0.03 mm. |
| Nozzle Ring/Diffuser Clearance | Max allowable increase from new specification (radial): 0.5 - 1.0 mm. Visual inspection for significant erosion or damage. |
| Blade Erosion/Fouling | Visual assessment for significant material loss, cracks, or heavy, uneven deposits that could cause imbalance or reduce aerodynamic performance. |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
A class surveyor will typically check the following: 1. Documentation: Verification of maintenance records, service reports, spare parts inventory, and class-approved overhaul procedures. Review of logbook entries for operational parameters and reported defects. 2. Operational Performance: Review of historical and current operational data (RPM, temperatures, pressures) to ensure the turbocharger is operating within design parameters and without chronic issues (e.g., surging, high vibration). 3. Safety Devices: Functionality check of overspeed trip, low lubricating oil pressure alarm, and high bearing temperature alarms. Verification of emergency shutdown procedures. 4. Physical Condition: External visual inspection for oil leaks, cracks, corrosion, proper insulation, and secure mounting. Assessment of general cleanliness and housekeeping around the unit. 5. Vibration Levels: May request recent vibration readings or witness a vibration check to ensure levels are within acceptable limits. 6. Compliance: Ensure compliance with SOLAS, MARPOL, and relevant classification society rules regarding machinery installation, maintenance, and safety.
Estimated lifetime: 24,000 - 36,000 hours (before major overhaul with component replacement; the unit itself can last the lifetime of the engine with proper maintenance and component renewal)
Free of charge — send us your request for MAN ES Turbocharging equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, MAN ES Turbocharging first.
Tell us what you need for this MAN ES Turbocharging TCT 12 — a part, a service call, a second opinion. Are you MAN ES Turbocharging? Claim this brand page.
Service engineer? Write the day report for this TCT 12 in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.