| Routine visual inspection (running condition) | 250-500 operating hours |
|---|---|
| Compressor washing (water/chemical) | 500-1000 operating hours (or as required by differential pressure) |
| Turbine washing (dry/wet) | 1000-2000 operating hours (or as required by exhaust temperature spread) |
| Bearing inspection and replacement (minor overhaul) | 8,000-16,000 operating hours |
| Major overhaul (rotor balancing, casing inspection, full disassembly) | 24,000-32,000 operating hours |
| Overspeed trip test | 4,000-8,000 operating hours or annually |
Typische Intervalle für diese Bauart, keine Herstellerangabe für Ihr Modell. Verbindlich ist das Handbuch des Herstellers.
| Axial bearing clearance (new) | 0.15 - 0.30 mm |
|---|---|
| Axial bearing clearance (wear limit) | 0.40 - 0.50 mm |
| Radial bearing clearance (new) | 0.10 - 0.20 mm |
| Radial bearing clearance (wear limit) | 0.25 - 0.35 mm |
| Turbine blade erosion/cracks | Any visible crack or significant erosion (e.g., >10% material loss) typically requires replacement/repair. |
| Nozzle ring deformation/fouling | Significant blockage (>20%) or deformation affecting gas flow, specific limits in manual for throat area. |
| Compressor wheel blade tip clearance | Evidence of rubbing marks or increased clearance beyond manufacturer's specified limits (typically 0.5-1.0 mm new, wear limit usually 1.5-2.0 mm). |
Die Bereiche sind für diese Bauklasse typisch. Maßgeblich sind stets die Herstellerunterlagen zur jeweiligen Seriennummer.
A class surveyor will typically focus on the overall condition, cleanliness, and evidence of proper maintenance. Key checks include visual inspection for oil/exhaust gas leakage, security of mounting, integrity of insulation and safety guards, and verification of the overspeed trip test records. If the turbocharger is opened for a scheduled overhaul, the surveyor will witness bearing clearance measurements, rotor inspection, and casing integrity checks. They will also review the maintenance logbook entries for routine cleaning, bearing replacements, and previous overhaul reports to ensure compliance with classification society requirements.
Geschätzte Lebensdauer: 60,000 - 100,000+ operating hours (with regular maintenance and major overhauls at 24,000-32,000 hr intervals)
Kostenlos — senden Sie uns Ihre Anfrage zu MAN ES Turbocharging-Ausrüstung. Unser Team prüft sie und antwortet per E-Mail.
Weitere Modelle desselben Ausrüstungstyps, zuerst MAN ES Turbocharging.
Sagen Sie uns, was Sie für diesen MAN ES Turbocharging TCA 55 benötigen — ein Ersatzteil, einen Serviceeinsatz, eine zweite Meinung. Sind Sie MAN ES Turbocharging? Diese Herstellerseite beanspruchen.
Servicetechniker? Schreiben Sie den Tagesbericht für diesen TCA 55 in OceanSphere Work — Fotos, Stunden und Teile, als PDF für den Reeder. 14 Tage kostenlos testen →
Ja. Technische Daten, Dokumente und Servicehinweise zu diesem Modell sind ohne Konto lesbar. Ein Konto bringt gespeicherte Suchen und Anfragen dazu, es nimmt nichts weg.
Ja. Nennen Sie uns Hersteller, Modell und Bedarf — ein Mensch liest jede Anfrage und antwortet per E-Mail.
Schicken Sie uns das Typenschild oder den richtigen Wert. Wir prüfen ihn gegen das Herstellerdatenblatt oder den Klassifikationsdatensatz und aktualisieren die Seite.