The ABB TPL‑A 85 is a high‑capacity turbocharger designed for two‑stroke low‑speed marine diesel main engines, delivering up to 50 MW of boost power in a compact frame‑size 85 housing.
Haben Sie das Herstellerdatenblatt zu diesem Modell? Schicken Sie es mit dem Anfrageformular — wir prüfen es und nennen die Quelle.
| Daily/Weekly Visual Checks | General cleanliness, leaks, abnormal noise/vibration, oil pressure/temperature. |
|---|---|
| Compressor Water Washing | Daily to weekly, depending on engine load and air quality. |
| Turbine Water Washing | Monthly to quarterly, depending on fuel quality and engine load. |
| Bearing Inspection/Replacement | 8,000 - 16,000 running hours (plain bearings), or every 1-2 years. |
| Rotor Cleaning & Inspection (Minor Overhaul) | 16,000 - 24,000 running hours, or every 2-3 years. |
| Major Overhaul (Full Disassembly, Inspection, Component Replacement) | 24,000 - 48,000 running hours, or every 3-5 years. |
| Axial Play (Rotor) | Max. 0.40 - 0.50 mm (compared to new 0.15-0.25 mm). Exceeding this indicates thrust bearing wear. |
|---|---|
| Radial Play (Rotor) | Max. 0.50 - 0.60 mm (compared to new 0.20-0.35 mm). Exceeding this indicates journal bearing wear. |
| Compressor Wheel Blade Tip Clearance | Increase of >0.5 mm from new value (manufacturer specific) indicates casing wear or shaft displacement. |
| Turbine Blade Erosion/Cracks | Any visible cracks are unacceptable. Erosion leading to >10% material loss or significant profile change requires replacement. |
| Nozzle Ring Deformation | Max. 1-2 mm distortion or significant erosion/cracking of vanes. |
Die Bereiche sind für diese Bauklasse typisch. Maßgeblich sind stets die Herstellerunterlagen zur jeweiligen Seriennummer.
Class surveyors will primarily focus on verifying that the turbocharger's maintenance has been carried out in accordance with the manufacturer's recommendations and the vessel's approved planned maintenance system. They will check maintenance records, logbook entries, and service reports for bearing replacements, rotor overhauls, and cleaning operations. A visual inspection will be conducted for any signs of leaks, excessive vibration, or external damage. They may request to witness the operation of safety devices, such as the overspeed trip, and verify alarm functions. If the turbocharger is opened for inspection during a special survey, the surveyor will typically check bearing clearances, rotor condition, and the integrity of the compressor and turbine sections.
Geschätzte Lebensdauer: The main rotating assembly (rotor shaft, compressor wheel, turbine wheel) can achieve 48,000 - 72,000 running hours before requiring major reconditioning or replacement, assuming regular maintenance and component replacements (bearings, seals). The robust casings can last significantly longer, often the lifetime of the vessel with proper care.
Kostenlos — senden Sie uns Ihre Anfrage zu ABB Turbocharging / Accelleron-Ausrüstung. Unser Team prüft sie und antwortet per E-Mail.
Weitere Modelle desselben Ausrüstungstyps, zuerst ABB Turbocharging / Accelleron.
Sagen Sie uns, was Sie für diesen ABB Turbocharging / Accelleron TPL-A 85 benötigen — ein Ersatzteil, einen Serviceeinsatz, eine zweite Meinung. Sind Sie ABB Turbocharging / Accelleron? Diese Herstellerseite beanspruchen.
Servicetechniker? Schreiben Sie den Tagesbericht für diesen TPL-A 85 in OceanSphere Work — Fotos, Stunden und Teile, als PDF für den Reeder. 14 Tage kostenlos testen →
Ja. Technische Daten, Dokumente und Servicehinweise zu diesem Modell sind ohne Konto lesbar. Ein Konto bringt gespeicherte Suchen und Anfragen dazu, es nimmt nichts weg.
Ja. Nennen Sie uns Hersteller, Modell und Bedarf — ein Mensch liest jede Anfrage und antwortet per E-Mail.
Schicken Sie uns das Typenschild oder den richtigen Wert. Wir prüfen ihn gegen das Herstellerdatenblatt oder den Klassifikationsdatensatz und aktualisieren die Seite.