960 kWPower
12Cylinders
170 mmBore

The Mitsubishi 12VS12R-MPTK is a medium‑speed, V‑12, four‑stroke marine diesel engine delivering about 960 kW at 1 500 rpm and used as the main propulsion unit on a range of merchant vessels.

Specifications

Technical data.

Every value below comes from the manufacturer datasheet or class-society record on file for this model.

ConfigurationV
Speed (rpm)1500
Fuel TypeMGO
TechnologyMechanical
Power (kW)960
📄
Download datasheet (PDF) (41623 KB)
Inspection

Inspector Detail ✓ verified

Common issues

  • Piston ring wear and breakage: Insufficient piston ring and groove clearance leading to ring sticking at operating temperature (as per known failure). This is critical for high-speed engines due to thermal loads.
  • Fuel injector fouling or malfunction: Common with MGO and mechanical injection, leading to poor atomization, incomplete combustion, high exhaust gas temperatures, and potential cylinder damage.
  • Turbocharger bearing wear or compressor/turbine fouling: High RPM operation makes bearings susceptible to wear; fouling reduces efficiency and can lead to surging.
  • Exhaust valve burning or seat wear: High thermal stress and corrosive elements in exhaust gases can lead to premature wear, affecting compression and performance.
  • Connecting rod bearing wear: High dynamic loads at 1500 RPM necessitate careful lubrication and monitoring to prevent premature wear or failure.
  • Cooling system blockages or corrosion: Especially in raw water circuits or scaling in freshwater systems, leading to inadequate cooling and potential engine overheating.
  • Increased lubricating oil consumption: Often indicative of worn piston rings, valve stem seals, or turbocharger oil seal leakage.
  • Vibration issues: Can stem from engine imbalance, worn couplings, or foundation problems, leading to accelerated wear on components and structural fatigue.

Inspection checklist

  • Daily visual inspection for leaks (fuel, lube oil, cooling water) and general engine room cleanliness.
  • Verify all engine parameters (pressures, temperatures, RPM, load) are within normal operating ranges and log them.
  • Check crankcase breather for excessive blow-by, indicating potential piston ring or liner wear.
  • Inspect turbocharger for unusual noises, excessive axial/radial play (if accessible), and cleanliness of compressor/turbine sides.
  • Check fuel filters for clogging indications and drain water traps.
  • Listen for unusual engine noises (knocking, rattling, squealing) that may indicate internal component issues.
  • Inspect exhaust manifold insulation for damage or hot spots, indicating potential gas leaks or insulation failure.
  • Verify tightness of engine mounting bolts and chocking arrangements.
  • Check lubricating oil level and condition (visual, smell); take samples for lab analysis as per schedule.
  • Verify emergency stop functionality and all safety shutdown devices (overspeed, low oil pressure, high temperature).

Service intervals

DailyVisual checks, fluid levels, gauge readings.
250-500 hoursLubricating oil and filter change (based on oil analysis results and operating conditions).
1000-2000 hoursFuel filter replacement, valve clearance check and adjustment, fuel injector inspection/cleaning/testing.
4000-6000 hoursTurbocharger inspection/overhaul, cylinder head overhaul (valves, springs, seats), fuel injection pump calibration/inspection.
8000-12000 hoursPiston inspection (rings, grooves, piston pin), connecting rod bearing inspection/renewal.
20000-24000 hoursMajor overhaul (main bearings inspection/renewal, crankshaft inspection, cylinder liner wear measurement, full engine disassembly and inspection).

Typical wear limits

Cylinder liner wearMaximum 0.6-0.8 mm on diameter at the top ring reversal point.
Piston ring groove wearMaximum 0.15-0.2 mm increase in axial clearance.
Crankshaft main/connecting rod bearing clearanceMaximum 0.15-0.25 mm.
Valve stem to guide clearanceMaximum 0.15-0.2 mm.
Turbocharger rotor axial playMaximum 0.15 mm (refer to specific TC manufacturer data).
Turbocharger rotor radial playMaximum 0.25 mm (refer to specific TC manufacturer data).

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Full set of piston rings (for at least one cylinder).
  • Fuel injector nozzles/elements (one set).
  • Fuel filters (primary and secondary, multiple sets).
  • Lubricating oil filters (multiple sets).
  • Cylinder head gasket set.
  • Connecting rod bearing shells (one set).
  • Turbocharger bearing cartridge or repair kit.
  • Assorted O-rings and gaskets for common maintenance tasks.

Safety

  • High-pressure fuel leaks: Risk of fire, explosion, and injection injury. Ensure double-walled piping integrity and leak detection.
  • Hot surfaces: Exhaust manifold, turbocharger, and other engine components can cause severe burns. Ensure proper insulation and guarding.
  • Rotating machinery: Flywheel, belts, and shafts pose entanglement and crushing hazards. Ensure guards are in place.
  • Crankcase pressure build-up: While less common in smaller engines, potential for crankcase explosion if conditions are met. Monitor blow-by.
  • Noise exposure: High engine noise levels can cause hearing damage. Ensure hearing protection is used in the engine room.

Class survey

A class surveyor will typically check the following: 1. Documentation: Review of engine logbooks, maintenance records, oil analysis reports, and previous survey reports. 2. Safety Devices: Verification of overspeed trip, low lube oil pressure shutdown, high cooling water temperature alarm/shutdown, and emergency stop functionality. 3. Crankshaft Deflection: Readings taken at specified intervals (e.g., annually or biennially) to assess alignment and bearing condition. 4. Cylinder Head Lift: May be required at specific intervals or if performance issues are suspected, to inspect piston crown, cylinder liner, and valve condition. 5. Fuel Oil System: Integrity of high-pressure fuel lines, double-walled piping, leak detection arrangements, and fuel filter condition. 6. Exhaust Gas System: Inspection of insulation, expansion bellows, and general integrity to prevent leaks and hot spots. 7. Engine Foundation: Visual inspection of engine mounting bolts, chocking, and overall foundation integrity. 8. Performance Data: Review of recorded engine parameters (power, RPM, fuel consumption, EGTs) to ensure consistent and safe operation. 9. Crankcase Relief Valves: Inspection and function test of crankcase relief valves.

Estimated lifetime: 25,000 - 30,000 hours before first major overhaul, with potential for 50,000+ hours total with subsequent overhauls and proper maintenance.

Documentation

Manuals

Need this part?

Request a quote for this model.

Free of charge — send us your request for Mitsubishi Heavy Industries equipment. Our team checks it and replies by e-mail.

For marine equipment hardly any maker or authorised dealer will name a price while the vessel is unknown. With the vessel details, availability and price can be settled faster; without them we may have to ask first, which costs a few days. If you are not allowed to name the vessel, a photo of the rating plate is enough — attach it below or send it as a reply to our confirmation e-mail.

Your contact details are not published. No account required.
Related models

Also in Main Engine 4-Stroke.

Other models of the same equipment type, Mitsubishi Heavy Industries first.

By manufacturer MAN Energy SolutionsWärtsiläCaterpillarHiMSENMTUVolvo PentaYanmar Power Technology Co., Ltd.HanshinDaihatsuPielstickMaK (Caterpillar)Rolls-Royce / BergenCaterpillar MaKCumminsBaudouinAll manufacturersSpare parts by equipmentNew here? Create a free account Can't read the plate? Try the nameplate scanner All Mitsubishi Heavy Industries models More like 12VS12R-MPTK
More than the data sheet shows

We answer by e-mail, never with an automatic reply.

Tell us what you need for this Mitsubishi Heavy Industries 12VS12R-MPTK — a part, a service call, a second opinion. Are you Mitsubishi Heavy Industries? Claim this brand page.

Service engineer? Write the day report for this 12VS12R-MPTK in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →

Frequently asked

Questions that come up with this equipment.

Is this model's data free?

Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.

Can you find a part for this exact model?

Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.

The specifications look wrong — what now?

Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.