Main Engine 4-Stroke · Main Engines (4-Stroke)
The Hanshin 6LEL44 is a medium‑speed, four‑stroke diesel main engine delivering about 5 280 kW at 510 rpm, designed for direct‑drive propulsion on merchant vessels.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Fuel Injector Overhaul | 2,000 - 4,000 running hours |
|---|---|
| Exhaust Valve Overhaul (inspection/grinding) | 4,000 - 8,000 running hours |
| Piston Overhaul (inspection/ring replacement) | 8,000 - 12,000 running hours |
| Turbocharger Minor Overhaul (bearings, cleaning) | 8,000 - 12,000 running hours |
| Turbocharger Major Overhaul (rotor balancing, full inspection) | 24,000 - 36,000 running hours |
| Main/Crankpin Bearing Inspection | 16,000 - 24,000 running hours |
| Major Engine Overhaul (liners, pistons, bearings, valves) | 24,000 - 36,000 running hours |
| Lube Oil Analysis | Monthly |
| Cylinder Liner Wear (Maximum Taper/Ovality) | 0.6 - 0.8 mm from new diameter |
|---|---|
| Piston Ring Groove Wear (Axial Clearance) | Max 0.15 - 0.20 mm over new specification |
| Crankshaft Deflection (Max Deviation between adjacent units) | 0.05 - 0.10 mm |
| Main/Crankpin Bearing Clearance | Max 0.15 - 0.25 mm over new specified clearance |
| Exhaust Valve Seat Recession | Max 1.0 - 1.5 mm from original position |
| Fuel Injector Nozzle Hole Enlargement | Max 10-15% increase in diameter |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
A class surveyor typically checks the overall engine condition, cleanliness, and absence of leaks. Key areas include verification of safety devices (overspeed trip, low lube oil pressure shutdown, high cooling water temperature shutdown, emergency stops), inspection of crankcase relief valves (flame traps, spring condition) and oil mist detector functionality. Crankshaft deflection readings are often required at Special Survey or intermediate surveys depending on class rules and engine age. Main and/or crankpin bearing inspections are conducted as per survey schedule (e.g., Special Survey). The integrity of high-pressure fuel lines, leak-off arrangements, and fire insulation is crucial. Functionality of starting air valves, emergency starting arrangements, and air bottle pressure are also verified. Logbook entries for engine running hours, maintenance records, lube oil analysis reports, and performance data are reviewed. Turbocharger general condition, bearing play (if accessible), and signs of surging or fouling are also noted.
Estimated lifetime: 80,000 - 120,000 running hours before requiring a major, comprehensive overhaul (e.g., crankshaft regrinding, full component replacement). With diligent maintenance, some units exceed this significantly.
Free of charge — send us your request for Hanshin equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, Hanshin first.
Tell us what you need for this Hanshin 6LEL44 — a part, a service call, a second opinion. Are you Hanshin? Claim this brand page.
Service engineer? Write the day report for this 6LEL44 in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.