Main Engine 4-Stroke · Main Engines (4-Stroke)
The Hanshin 6LEL35 is a medium-speed, inline‑six 4‑stroke marine diesel engine delivering about 2 880 kW at 660 rpm, designed for flexible fuel use (HFO/MGO) and mechanical control.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Daily/Watch Checks | Visual inspection, gauge readings, log entries. |
|---|---|
| 250-500 Running Hours | Fuel injector overhaul/replacement. |
| 1000-2000 Running Hours | Exhaust valve inspection/grinding, valve clearance adjustment, fuel pump timing check. |
| 4000-6000 Running Hours | Turbocharger inspection/cleaning, fuel pump element inspection/replacement. |
| 8000-12000 Running Hours | Piston withdrawal for inspection of piston rings, grooves, liner, connecting rod bearings. Main bearing inspection (often staggered). |
| 16000-24000 Running Hours | Major overhaul of cylinder heads, comprehensive bearing inspection, cylinder liner calibration. |
| Cylinder Liner Wear (Taper/Ovality) | Max 0.6-0.8 mm (or 0.1% of bore diameter per 1000 hours, specific to manual). |
|---|---|
| Piston Ring Groove Wear (Side Clearance) | Max increase of 0.15-0.25 mm over new clearance. |
| Crankshaft Deflection | Max deviation between adjacent webs 0.05-0.10 mm (cold engine). |
| Main/Connecting Rod Bearing Clearances | Max increase over new clearance 0.10-0.15 mm. |
| Exhaust Valve Seat Recession | Max 1.5-2.0 mm from original position. |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Class surveyors typically focus on the integrity of the engine's structure and its safety systems. Key checks include a thorough review of maintenance records (PMS adherence, logbooks, oil analysis reports), functional testing of all safety devices (overspeed, low lube oil pressure, high temperature shutdowns), and verification of alarm systems. Crankshaft deflection measurements are often required at specific intervals. During major surveys, a specified number of main and connecting rod bearings will be opened for visual inspection and clearance checks. The overall condition of the engine room, including fire safety arrangements, lagging of hot surfaces, and absence of leaks, is also critically assessed. Fuel system integrity, especially high-pressure lines and shielding, is a priority due to fire risk. Turbocharger condition and overhaul records are also reviewed.
Estimated lifetime: 80,000 to 120,000 running hours before requiring a major overhaul (e.g., crankshaft out, full rebuild), assuming diligent maintenance and component replacement.
Free of charge — send us your request for Hanshin equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, Hanshin first.
Tell us what you need for this Hanshin 6LEL35 — a part, a service call, a second opinion. Are you Hanshin? Claim this brand page.
Service engineer? Write the day report for this 6LEL35 in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.