6DK-20e
The Daihatsu 6DK‑20e is a vertical water‑cooled, direct‑injection 4‑stroke diesel auxiliary engine delivering up to 1 200 kW at 900 rpm, equipped with an electronic governor and capable of running on HFO or MDO.
Engine Specifications
Inspector Detail
▸
Common issues
- Fuel injector nozzle coking or wear, worse on HFO than MDO
- Turbocharger fouling on compressor and turbine sides
- Cylinder liner wear or cold corrosion if jacket water temperature is not properly controlled
- Piston ring sticking/carbon buildup
- Exhaust valve burning from sustained high load or poor combustion
- Jacket cooling water corrosion/scale from inadequate chemical treatment
- Lubricating oil contamination from fuel dilution or water ingress
- Governor/actuator wear affecting speed regulation and load sharing
Inspection checklist
- Exhaust temperature per cylinder, trended against baseline
- Turbocharger speed and vibration trend
- Fuel injector spray pattern/condition at overhaul
- Jacket cooling water treatment level (nitrite or equivalent) and coolant analysis
- Lube oil analysis (TBN, water content, wear metals)
- Governor response and load-sharing check on parallel operation
- Crankcase oil mist detector and relief valve check
- Turbocharger air filter condition
- Engine foundation/mounting bolt tightness
Service intervals
| Lube oil analysis | typically every 500 running hours |
| Fuel injector overhaul | typically every 4,000-8,000 running hours depending on fuel quality |
| Turbocharger water-wash | condition-based, commonly every 1,000-2,000 running hours, with full overhaul at a longer interval - confirm exact figures against Daihatsu's manual for the DK series |
| Top overhaul (piston/liner/valve inspection) | typically every 8,000-12,000 running hours |
| Cooling water treatment check | monthly or per the maker's chemical treatment schedule |
Typical wear limits
| Piston ring gap | typically 0.8-1.5 mm depending on ring position for this bore class - confirm against Daihatsu's own manual |
| Main/big-end bearing clearance | typically in the region of 0.15-0.35 mm for an engine this size when renewal is due - confirm against the maker's manual |
| Cylinder liner bore wear | monitor closely and plan renewal as wear approaches roughly 0.3-0.5% of bore diameter (on a 200 mm bore this is on the order of 0.6-1.0 mm) - confirm against Daihatsu's actual limit |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Critical spares
- Fuel injector nozzle/injector assembly
- Piston ring set
- Cylinder liner
- Main/big-end bearing shells
- Turbocharger bearing cartridge
- Cylinder head gasket
- Exhaust valve
- Fuel pump plunger and barrel
Safety
- HFO handling - fuel is heated, so leaks present a burn/scald risk in addition to fire risk near hot exhaust surfaces
- Crankcase explosion risk - oil mist detector must be operational and alarm-tested
- High-pressure fuel injection lines present an injection-injury risk during testing/cleaning - never check for leaks with a hand
- Rotating flywheel/coupling guards must be in place
- Oil-soaked exhaust lagging is a fire risk and should be replaced, not just re-taped
Class survey
Auxiliary generator engines have their governor and protective trips (overspeed, low lube oil pressure) function-tested at survey, crankcase explosion relief valves checked, generator insulation resistance tested, and parallel/load-sharing operation demonstrated; oil analysis and overhaul records are reviewed.
Other Cylinder Configurations 17
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Common failures & inspection points
Type-general inspection and maintenance points for this equipment category — not model-specific.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →