"> Provision/Stores Crane - Equipment Database

Provision/Stores Crane

medium 2 models total

A provision or stores crane lifts food, spares and general stores aboard, usually smaller and lighter-duty than a cargo crane on the same ship, sized for occasional pallet and drum lifts rather than continuous cargo cycles.

Read more — Provision/Stores Crane explained

What makes this type distinct

A provision or stores crane is built for a lighter, less frequent duty cycle than a main cargo crane: it exists to bring food, spare parts, lube oil drums and general stores aboard at anchor or alongside, not to discharge the ship's cargo. On a container ship or tanker where no cargo crane is fitted at all, the provision crane may be the only lifting appliance aboard, and it is sized and located specifically for stores handling near the accommodation or a dedicated stores hatch rather than over the main cargo holds. Where a ship does carry cargo cranes, the provision crane is usually a smaller separate unit so cargo operations and stores handling do not compete for the same equipment.

Provision / stores crane arrangement
Side view of a deck-mounted provision crane showing the pedestal, slewing ring, luffing jib, luffing cylinder, hoist wire and hook lifting a stores pallet.

Main components

Crane structure and pedestal or davit base

Lighter-built than a cargo crane, since the rated load and duty cycle are both lower, but still requiring a reinforced deck foundation matched to the crane's overturning moment.

Boom or jib

Fixed or luffing jib giving reach over the ship's side or to a stores hatch; telescoping is less common than on cargo or offshore cranes given the more limited reach needed.

Winch and hook

Single hoist winch in most cases, since stores cranes rarely need the dual-hook or heave-compensated arrangements found on cargo or offshore support cranes.

Control station

Local pendant or a simple cab, often positioned for a clear view down onto the stores boat or the quay stores point rather than across the whole deck.

Selection and sizing

Rated capacity is set by the heaviest single item routinely lifted, typically a loaded pallet, a drum or a small container of spares, plus margin, rather than by cargo tonnage. Reach needs to cover the distance from the ship's side or a stores boat alongside to the stores hatch or deck stowage point. On ships without a dedicated cargo crane, the provision crane's capacity sometimes gets tested informally for occasional heavier lifts it was never rated for, which is the single most common way this type of crane gets overloaded.

Regulations and class

Class societies certify provision cranes under the same lifting appliance rules applied to cargo cranes, scaled to the lower rated capacity: proof load test before entry into service, periodic thorough examination, and a load chart kept aboard. There is no separate lighter regulatory regime just because the crane is smaller; a stores crane rated at two tonnes is surveyed with the same rigour, proportionate to its capacity, as a forty-tonne cargo crane.

Typical faults

FaultConsequence
Crane used beyond its rated SWL for an occasional heavy liftOverload of structure or wire rope not designed for the load, the leading cause of stores crane failure
Winch brake wear from infrequent but heavy useLoad creep or drop when holding a suspended load, especially noticeable on older mechanical brake designs
Corrosion of an exposed pedestal or jib from long idle periods between usesHidden structural thinning that a routine visual check can miss if the crane is rarely operated
Wire rope neglect due to infrequent inspection on a low-use craneRope condition deteriorates unnoticed between the infrequent lifts that would reveal a problem

What to look for in a supplier

  • Rated SWL matched honestly to the heaviest items actually expected, with a documented load chart aboard.
  • Corrosion protection suited to a crane that may sit idle and exposed for long stretches between uses.
  • Simple, robust winch brake design that holds reliably even after long idle periods, since stores cranes see fewer duty cycles than cargo cranes.

Because a stores crane sits idle for long stretches, treat every lift as the first test of the day: check the hook, wire rope and brake before loading, not after noticing something looked wrong mid-lift.

2 manufacturers · 2 models

HS Marine

1
HS Marine HS Marine Knuckle Boom NMF
HS Marine Knuckle Boom NMF
SWL 3-10t · Cargo / Equipment · knuckle boom crane
Type
knuckle_boom
Safe Working Load (t)
3-10
Common Failures & Inspection Points
  • Hydraulic cylinder seal failure
  • Boom bearing wear
  • Control valve stiction
Service: Norwegian/Danish manufacture. 5-year certification.
Spare Parts: HS Marine: Drahtseil-Ersatz per Herstellerplan. SLI-Kalibrierung per zugelassenem Service. Lead time: 3-8 Wochen.
Strengths
  • Compact footprint suitable for vessels with limited deck space
  • High maneuverability thanks to the articulated knuckle design, allowing precise placement of loads in confined areas
  • Rated lift capacity (3‑10 t) matches typical provisioning and spare‑parts handling requirements on supply and offshore support ships
  • Standard 5‑year certification from Norwegian/Danish authorities simplifies compliance for operators
Weaknesses
  • Limited maximum lift compared with larger deck cranes; not suitable for heavy cargo (>10 t)
  • Hydraulic cylinder seals have a known failure mode, requiring regular inspection and replacement
  • Boom bearing wear can become significant after high‑cycle operation, increasing maintenance intervals
  • Control valve stiction may affect fine positioning and demand periodic valve servicing
Typical Vessels: Offshore supply vesselCoastal cargo shipResearch / survey vesselFisheries support vesselSmall container feeder
Decision Guide: Choose if you need a low‑profile crane with 3‑10 t capacity for frequent provisioning, spare‑parts handling or small cargo on vessels where deck space is at a premium. Avoid if the operation requires higher lift capacities, long outreach, or if maintenance resources to address known hydraulic seal and bearing wear issues are limited.
Use Cases: The NMF is typically installed on offshore supply ships to load provisions, tools, and spare parts onto other vessels or platforms; on coastal cargo carriers for handling pallets, drums, and small containers; and on research vessels for deploying equipment and supplies in tight dockside environments.

Liebherr Maritime

1
Liebherr Maritime LBS 150 Ship Crane
LBS 150 Ship Crane
SWL 3t · Cargo / Equipment · hydraulic crane
Type
ship_crane
Safe Working Load (t)
3
Common Failures & Inspection Points
  • Hydraulic pump failure
  • Slewing ring wear
  • Wire rope deterioration
Service: German manufacture. 5-year load test.
Spare Parts: Liebherr Maritime: Drahtseil-Ersatz per Herstellerplan. SLI-Kalibrierung per zugelassenem Service. Lead time: 3-8 Wochen.
Strengths
  • Compact design suitable for vessels with limited deck space
  • German engineering reputation for reliability and precision
  • 5‑year load test certification ensures long‑term structural integrity
  • Modular installation simplifies integration into new builds or retrofits
  • Integrated safety devices (overload protection, emergency stop)
Weaknesses
  • Limited to 3 t SWL – insufficient for heavier cargo handling tasks
  • Hydraulic pump failures have been reported in service history
  • Slewing ring wear can increase maintenance intervals
  • Wire‑rope deterioration requires regular inspection and replacement
Typical Vessels: TankerContainer shipGeneral cargo vesselCruise shipOffshore supply vessel
Decision Guide: Choose if: you need a reliable, compact 3 t provision crane for medium‑size vessels where deck space is at a premium and a proven load‑test record is required. Avoid if: your operations demand higher lifting capacities or heavy cargo handling beyond the 3 t limit.
Use Cases: Commonly installed on tankers and container ships to handle stores, spare parts, lifeboat equipment, and other deck cargo during port calls; also used on cruise and offshore supply vessels for routine provisioning tasks.