OceanSphere
Engines

Quick Release Hook

medium 4 models total
Ship-side hooks for rapid mooring line release in emergency.

3 manufacturers · 4 models

Peck & Hale

2
P&H QRH-150 Single Hook
SWL 150t · Anchor Chain / Mooring Lines · single
Safe working load tonnes
150
Type
single
Actuation
pneumatic
Common Failures & Inspection Points
  • Trigger mechanism seizure
  • Corrosion of pivot pin
  • Air cylinder leak
Service: Test release mechanism monthly; grease pivot pin quarterly.
Spare Parts: Peck & Hale: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.
P&H QRH-200 Triple Hook
SWL 200t per hook · Anchor Chain / Mooring Lines · triple
Safe working load tonnes
200
Type
triple
Actuation
hydraulic
Common Failures & Inspection Points
  • Sequential release failure
  • Hook jaw wear
  • Hydraulic line failure
Service: Test sequential release quarterly; NDT hook jaws annually.
Spare Parts: Peck & Hale: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.

MacGregor

1
MG-QRH Hydraulic Release Hook
SWL 150t · Anchor Chain / Mooring Lines
Safe working load tonnes
150
Actuation
hydraulic
Technical Specifications
Brake Holding Capacity (first layer)
Up to 500 tonnes, or ISO/classification society compliant
Load Capacity
5 to 300 tonnes on first layer (configurable)
Windlass with Chain Stopper
Brake must withstand min. 45% of chain cable breaking strength
Windlass without Chain Stopper
Brake must withstand min. 80% of chain cable breaking strength
Drum Configuration
Single to triple drums, modular HPU or full electrical drive
Product Lines
  • Hatlapa (merchant ship segment, anchor handling)
  • Pusnes (offshore mooring systems, eccentric fairlead chain stopper EFCS)
  • Triplex (chain stopper systems)
  • MacGregor MEW (electrical drive)
  • MacGregor MHW (modular hydraulic power unit)
Common Failures & Inspection Points
  • Area: Brake Holding Capacity insufficiency or deterioration
    Check: Conduct brake rendering test using Brake Testing Kit or torque spanner method. Accept only if PRIMARY brake holds min. 60% of ship design MBL. Test after every brake lining renewal, before delivery, within 30 days takeover, and annually. Adjust lining if wear exceeds 40% residual thickness.
  • Area: Chain/Gypsy Wear, Corrosion, Pitting (gypsy teeth, chain links)
    Check: Measure link diameter at wear points - maximum 12% reduction allowed by class rules. Inspect for cracks, distortion, corrosion pitting, especially under gypsy where crevice corrosion occurs. Monitor for abrasion from rocks/sand. In saltwater, check galvanized steel for oxidation; in stainless, examine for crevice attack in oxygen-starved spots.
  • Area: Hydraulic System Contamination (brake efficiency loss)
    Check: Check hydraulic lines and piping monthly for leaks, tightness, proper valve function. Inspect hydraulic fluid condition (contamination, moisture, oil breakdown). Oil, moisture, or heavy rust on brake lining/drum can reduce holding capacity up to 75%. Temperature monitoring on hydraulic pipelines indicates lubrication issues.
  • Area: Brake Lining Wear (linings must maintain adequate thickness)
    Check: Inspect brake lining thickness regularly - renewal required when residual thickness drops below 50-60% of original (e.g., 8mm original -> replace at 4-5mm). Check for discoloration, scorching, unevenness, rough spots. Replace upper AND lower linings simultaneously. On non-tank vessels, renew at every drydock regardless of condition.
  • Area: Chain Stopper Hydraulic Function & Mechanical Lock (Pusnes EFCS, Hatlapa roller stopper)
    Check: Test hydraulic-operated chain stopper self-locking release capability under FULL DESIGN LOAD. Verify proper engagement/disengagement cycles. For Pusnes EFCS: check eccentric mechanism for wear, hydraulic pressure (motor protection integration). For Hatlapa roller stopper: inspect roller wear, high-pressure hydraulic motor function. Examine for leaks, cracks, corrosion on stopper pins/bushings.
  • Area: Foundation Integrity & Corrosion (windlass mounting, fairlead supports)
    Check: Examine foundation bolts, welds, support frame before and after heavy anchoring/mooring operations for stress cracks, corrosion pitting, galvanic corrosion at dissimilar metal joints (fairlead/deck interface). Verify no settlement or deformation. In rough weather operations, monitor for fatigue cracking under excessive loads. Apply protective coatings where needed (zinc-rich primer + topcoat).

Typ-universelle Inspektions-/Wartungspunkte fuer Anchor & Mooring Equipment (MacGregor + DNV/OSHA, 2026-06). Per-Modell-Specs NICHT auto-gefuellt.

Service: Replace seals every 3 years; protect control cables from UV.
Spare Parts: MacGregor: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.

Mampaey

1
Mampaey QRH-Twin 100
SWL 100t per hook · Anchor Chain / Mooring Lines · twin
Safe working load tonnes
100
Type
twin
Actuation
mechanical
Common Failures & Inspection Points
  • Release cable stretch
  • Hook body corrosion
  • Spring fatigue
Service: Replace release cables every 2 years; blast and paint at 5-year intervals.
Spare Parts: Mampaey: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.