Wire Rope (Mooring)
medium
6 / 6 models (Inspector)
Steel wire ropes for mooring operations.
5 manufacturers · 6 models
Bridon
2
Tiger 18x7 Mooring Wire
36mm dia, MBL 120t
· Anchor Chain / Mooring Lines
Construction
18x7 compacted
Diameter (mm)
36
Mbl tonnes
120
Material
steel
Common Failures & Inspection Points
- Broken wires at termination
- Corrosion pitting
- Birdcaging
Service: Grease annually; retire per class rules (broken wire count).
Spare Parts: Bridon: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.
Dyform 34LR Mooring Wire
42mm dia, MBL 160t
· Anchor Chain / Mooring Lines
Construction
34x7 low rotation
Diameter (mm)
42
Mbl tonnes
160
Material
steel
Common Failures & Inspection Points
- Core rope failure
- Torque imbalance
- External corrosion
Service: Use swivel at one end; coat with preservation grease.
Spare Parts: Bridon: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.
Casar
1
Casar Stratoplast Mooring
38mm dia, MBL 135t
· Anchor Chain / Mooring Lines
Construction
compacted with plastic filler
Diameter (mm)
38
Mbl tonnes
135
Material
steel
Common Failures & Inspection Points
- Plastic filler deterioration
- Fatigue at sheave
- Corrosion under filler
Service: Monitor filler condition; minimum sheave D/d 20:1.
Spare Parts: Casar: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.
NEADE INDUSTRIA E COMERCIO DE PRODUTOS PARA ELEVACAO E MOVIMENTACAO DE CARGAS LTDA
1
Wire rope lifting sets
Pull force per Hersteller-Datenblatt
· Anchor Chain / Mooring Lines
Common Failures & Inspection Points
- Band brake Belagverschleiß bei häufigen Hafenmanövern
- Wildcat-Taschenverschleiß nach 15.000+ Betriebsstunden
- Hydraulikmotor-Dichtungsleck bei hydraulischen Varianten
- Elektromotor-Isolationsfehler durch Deckbelastung und Feuchtigkeit
Service: Bremsbelag-Inspektion alle 6 Monate. Getriebeöl-Wechsel alle 2 Jahre. Wildcat-Messung bei Dockung. Motor-Isolationstest jährlich.
Spare Parts: NEADE INDUSTRIA E COMERCIO DE PRODUTOS PARA ELEVACAO E MOVIMENTACAO DE CARGAS LTDA: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.
Redaelli
1
Redaelli Flexpack Mooring Wire
34mm dia, MBL 110t
· Anchor Chain / Mooring Lines
Construction
6x36 compacted
Diameter (mm)
34
Mbl tonnes
110
Material
steel
Common Failures & Inspection Points
- Wire breakage at swage
- Surface corrosion
- Kinking if improperly spooled
Service: Maintain proper spooling tension; lubricate every 6 months.
Spare Parts: Redaelli: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.
Usha Martin
1
UM Galaxy Mooring Wire
36mm dia, MBL 115t
· Anchor Chain / Mooring Lines
Construction
6x36 Warrington-Seale
Diameter (mm)
36
Mbl tonnes
115
Material
steel
Common Failures & Inspection Points
- Corrosion in tropical waters
- Broken wires at drum
- Lubrication loss
Service: Re-lubricate in tropical climates every 3 months.
Spare Parts: Usha Martin: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.