"> d-i davit international-hische GmbH D-FH.65 06.05.02
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 2 verified suppliers & service companies for d-i davit international-hische GmbH in the Maritime Network Find suppliers →
d-i davit international-hische GmbH

D-FH.65 06.05.02

The D‑FH.65 davit system is a modular lifeboat/raft launch apparatus featuring electric, hydraulic or manual drive options with optional stored‑power (battery or spring) and a docking head to eliminate pendulum motion during launch.

d-i davit international-hische GmbH D-FH.65
06.05.02
Persons capacity per SOLAS certification
Capacity
Crew Evacuation / Safety
Medium

Inspector Detail

Common issues

  • Wire fall corrosion or wear from saltwater exposure
  • Hydraulic power pack leaks or slow loss of holding pressure
  • Winch brake lining wear affecting controlled lowering speed
  • Limit switch misalignment or failure
  • Davit arm and pivot pin corrosion or pitting
  • Winch gearbox oil contamination or leakage
  • On-load release gear (hook) mechanism stiffness or misadjustment

Inspection checklist

  • Weekly visual inspection of falls, davit structure and winch
  • Monthly operational test, lowering under power
  • Annual thorough examination by a competent person
  • 5-yearly dynamic winch brake test at 1.1 x SWL per SOLAS/class
  • On-load release gear overhaul and test on the manufacturer's/SOLAS cycle
  • Wire fall inspection for broken wires, corrosion and lubrication
  • Hydraulic system pressure test and hose inspection
  • Limit switch and interlock function test
  • Structural check of pivot pins and davit arm

Service intervals

Operational check weekly
Thorough examination (SOLAS LSA Code) annually
Dynamic winch brake test every 5 years at 1.1 x SWL
On-load release gear overhaul every 5 years, by an approved service provider, per SOLAS MSC.1/Circ.1206 rev.1
Hydraulic oil change per the manufacturer's manual, typically every 2-3 years or on condition
Wire fall re-reeving/replacement typically every 5 years or on condition, whichever comes first - confirm against the maker's manual

Typical wear limits

Wire fall discard criteria per class/ISO broken-wire and diameter-reduction rules for this rope construction - confirm against the applicable class table
Brake lining wear replace below the manufacturer's minimum thickness - no generic figure available, confirm against the maker's manual

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Matched wire fall sets
  • Winch brake linings
  • Hydraulic power pack seals and hoses
  • Limit switches
  • On-load release gear components (maker-approved kit only)

Safety

  • Suspended lifeboat/liferaft during launch and recovery drills is a fall/crush hazard
  • Stored hydraulic and spring energy within the davit and release gear
  • Crush hazard at davit arm pivot points during operation
  • On-load release gear must only be serviced by an approved provider - a mis-set release gear is a documented cause of fatal lifeboat accidents

Class survey

SOLAS/LSA Code requires annual thorough examination, a 5-yearly dynamic test of the winch brake at 1.1 x SWL, and on-load release gear overhaul every 5 years by an approved service supplier, with all records kept in the vessel's LSA maintenance/register.

Estimated lifetime: Davit systems are assessed on condition and calendar-based SOLAS surveys rather than running hours; structural design life is typically 20+ years with periodic thorough examination, dynamic testing and on-load release gear overhaul.

Components & Design

Component data being added…

Technical Data

imo approved True

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

On-load release gear functionality and wear

Annually: operational test of on-load release gear by positioning the boat partially in water for load support by fall, actuation of release gear, reset and inspection for damage. Every 5 years: overhaul of release system with 110% proof-load test. Inspect release gear before and after operational test; verify hook securing and reset.

Wire rope condition (wires/falls) – corrosion, wear, breakage

Monthly: visual inspection for fraying, kinks, corrosion, broken strands. Annually: wire rope and sheaves for scratches, dents, corrosion, missing lubrication. Every 5 years: wire rope replacement per SOLAS Chapter III required. Lubrication of wires, sheaves and moving parts to be checked.

Brake system - inspection function and wear parts

Annually: brake test by suspension of rated load and verification that brake holds without slippage. For centrifugal brakes: sinking speed against SOLAS formula (max. 1.3 m/s) to be checked. Brake pads to be inspected and replaced when worn. Every 5 years: brake system to be opened and condition thoroughly checked.

Sheaves - wear, abrasion, corrosion, wear rings

Annually: sheaves for wear grooves, wear ring wear, corrosion, incorrect alignment, loose bolts to be checked. A worn or corroded sheave damages new wires and leads to premature wire rope failure. Wear ring thickness to be measured and replaced if necessary. Lubrication to be checked.

Overall structure - corrosion, wear, deformation and clearance

Annually: davit structure for corrosion (especially welds), wear, deformation, excessive clearance, cracks to be checked. All bolt locking devices to be verified. Hydraulic cylinders for leakage to be checked. Every 5 years: selective disassembly with NDT (roughness inspection, crack inspection) to be performed. Foundations to be inspected.

Proof-load test at 110% of rated load

Annually: dynamic winch brake test at 110% of Safe Working Load to be performed (simulated by water bag equipment or certified load cells). Every 5 years: comprehensive proof-load test of entire davit, winch, wire rope and hook system at 110% SWL to be performed. System must hold load, show no deformation or damage.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Engine test weekly (min. 5 min). Release hook maintenance annually by approved service (SOLAS MSC.402(96)). GRP hull inspection at docking. 5-year basic survey.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Spare parts via d-i davit international GmbH or authorized distributors. Lead time: 2-6 weeks.
Equipment Model #9984 · ✓ still in production