"> Wartsila Moss N2 Membrane NG-1000 99.5%
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
Wartsila Moss

N2 Membrane NG-1000 99.5%

Wärtsilä Inert Gas Systems. Wärtsilä Moss inert gas generators (IGG) are maritime-based safety systems that prevent explosive atmospheres in cargo tanks by generating oxygen-lean exhaust gas. The system combines a combustion chamber with a scrubber (seawater-cooled components) and produces inert gas with less than 5% oxygen content. The plant is operated via >2500 S

Components & Design

Component data being added…

Technical Data

capacity m3h 1000
o2 content percent 0.5
dew point c -40
ig type membrane N2

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Scrubber-Rohrsystem Verschmutzung & Korrosion

Visual inspection through man-holes for sludging, corrosion damage, deposits; check nozzles, cooling tubes, floats, sensors, demister elements. Inspection frequency 6-12 months (doubled under critical conditions). Drydock entrance inspectable (scrubber discharge line).

Oxygen analyser sample line blockage due to carbon deposits

Periodic test & cleaning of inert gas sample line to O₂ analyser (critical service position). Analyser itself: 2-point calibration (Zero-Gas N₂ 0%, Span-Gas known O₂ concentration) before operation. Calibration accuracy per manufacturer. Alarm setting: >8% O₂ volume.

Deck Water Seal Wasserniveau & Funktionsprüfung

Check water supply (min. 2 separate pumps required). Visual inspection water level (equipped with low-level alarm). Inspection PMS interval per manufacturer; special attention during IG system shutdown. Check for blockage/corrosion at openings.

Pressure/Vacuum Breaker (P/V-Breaker) Druckeinstellung & Flammschutz

Check flame screens/meshes (replacement per PMS plan). Calibration for required pressure values + test at operating pressure. Liquid-filled breakers: check fluid type & level; check anti-freeze additive in case of frost risk. Labelling with opening pressures & fluid type/concentration + min. operating temperature.

Rückschlagventil (Non-Return Valve / Check Valve) Freigang & Ventilsitz

Ventil zur Inspection öffnen. Prüfung auf Korrosion, Ventilsitz-Zustand, freie Ventilbewegung über volle Hublänge. Betriebsprobe im Service durchführen. Mindestens zwei Rückschlagvorrichtungen erforderlich (Deck Seal + Isolierventil). Kritisch für Hydrokarbon-Rückfluss-Verhinderung in Maschinenraum.

Brennkammer-Zustand & Lagerzustand Flue-Gas-Rückzirkulations-Ventile

Access to combustion chamber via hinged front (tool-free accessible — check for wear). Flue gas & recirculation valves regularly stroked (stroke test) when system out of service — ensure free operation over full stroke range. Inspection frequency per operating frequency.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #94469 · ✓ still in production