"> Alfa Laval Aalborg Alfa Laval Aalborg Mission OL 5t/16bar
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 80 verified suppliers & service companies for Alfa Laval Aalborg in the Maritime Network Find suppliers →
Alfa Laval Aalborg

Alfa Laval Aalborg Mission OL 5t/16bar

Alfa Laval Aalborg Alfa Laval Aalborg Mission OL 5t/16bar — HFO/MDO.

Alfa Laval Aalborg Alfa Laval Aalborg Mission OL 5t/16bar

Components & Design

Component data being added…

Technical Data

boiler type Alfa Laval Aalborg Ölgefeuerte Schiffsdampfkessel (Water Tube / D-Type)
steam capacity th 5
design pressure bar 16
fuel type HFO/MDO

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Tube body leakage due to corrosion, pitting, deposits (scale/sludge) or wear

Internal visual inspection of all steam/water tubes; perform pressure test if suspected; seal leaking tube with conical stop valve after steel wire brush cleaning of tube ends. Leaking tubes must be renewed.

Water level regulation: failure of differential pressure transmitter or feedwater control valve leads to flooding/drying out

Check DP transmitter unit (external reference/variable leg, 4–20 mA output); feedwater control valve functional test; sight glass for cracks, contamination; test alarm function in control unit

Safety valve failure or incorrect opening/closing pressures — overpressure or inadequate emergency steam relief

Test two safety valves under full-load steam: pressure build-up 7 min. max. +6% working pressure permissible (water tubes); pop-point of each valve max. ±3% from set pressure; class notation: perform opening + accumulation test under classifier supervision

Furnace refractory damage (cracks, spalling) or soot/corrosion → heat leaks, furnace instability, drum overheating

Inspect furnace walls and refractory lining visually (min. 2x/year); check for cracks, moisture, soot deposits. Check lower tube plate (insulation + form refractory). After 3–4 weeks operation: perform blow-down, inspect/clean boiler, remove sludge

Loss of pressure integrity due to corrosion, cracks, rivets or welds → leakage, operating loss, safety risk

Hydrostatic test: fill boiler with water 21–65 °C (water tubes max. 71 °C). Pressure: 1.5× MAWP (non-entry) or 1.25× MAWP (entry). Secure safety valves with clamps. Check all seal surfaces, rivets, welds for leaks. Class notation: every 2 years (up to 8 years), then annually

Internal corrosion (water side), scale deposits or fire side soot/flocking → tube wear, heat loss, contamination

Class survey: water side (steam drum, water drum, all tubes) check for corrosion/cracks/deposits; fire side (furnace, flue gas path) check for soot/flocking (min. 2x/year). Man holes (top/bottom) permit access. If necessary use ultrasonic/endoscope for deeper defects

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #78047 · ✓ still in production