"> Kongsberg Maritime Kongsberg K-LC Loading Computer System
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 5 verified suppliers & service companies for Kongsberg Maritime in the Maritime Network Find suppliers →
Kongsberg Maritime

Kongsberg K-LC Loading Computer System

Kongsberg Maritime Kongsberg K-LC Loading Computer System — Tanker Cargo Systems.

Inspector Detail

Common issues

  • Loading instrument software approval lapsing or falling out of date with the vessel's current condition after a conversion or tank modification
  • Mismatch between the on-board loading manual and the installed software revision after an update
  • Interface faults with draft gauges or tank sounding/level sensors feeding the computer, giving unreliable input data
  • Incorrect trim, stress, or stability output after hardware replacement carried out without re-approval by the issuing authority
  • Backup power (UPS) failure causing loss of an in-progress calculation or corrupted data during a power dip
  • Operating system or platform becoming obsolete and no longer receiving manufacturer security patches
  • Operator input errors (wrong tank sounding, wrong density) not flagged because a plausibility check is disabled or misconfigured

Inspection checklist

  • Verify the current approval certificate for the loading instrument is valid and matches the installed software version
  • Check that annual/periodical stability instrument test results are on file and match the class-approved test conditions
  • Run a known load case and compare computer output against the approved test booklet figures
  • Check UPS backup battery condition and confirm it can carry the system through a normal power interruption
  • Verify interfaces to draft gauges and tank sounding/level sensors are reading correctly
  • Confirm backup output (printer or secondary storage) is functioning
  • Check that the on-board loading manual edition matches the installed software revision
  • Verify user access control and that crew operating the system have received instrument-specific training

Service intervals

Annual loading instrument test class/flag requirement, typically annual, and after any major conversion or hull modification
UPS backup battery replacement typically every 3-5 years, confirm against the UPS manufacturer's own guidance
Software/firmware version review at each dry-docking or whenever hull/tank data changes
Sensor calibration (draft gauges/tank sounding feeding the system) annually or per the sensor manufacturer's schedule

Critical spares

  • UPS backup battery pack
  • Backup storage/data module
  • Display/monitor unit
  • Keyboard or operator input unit
  • Network/interface card linking the computer to draft and tank sensors

Safety

  • An incorrect stability or hull-stress calculation from unapproved software or hardware changes can lead to overstress or a stability incident - never operate on a version that does not match the approval certificate
  • Reliance on an informal backup calculation method during a system outage without following the approved contingency procedure
  • Electrical hazard when opening the cabinet - isolate power before internal work
  • Cyber-security exposure if the instrument is networked to other ship systems without proper segregation

Class survey

Tankers are required to carry an approved loading/stability instrument under SOLAS and Load Line requirements; the annual verification test compares computer output against the approved test conditions in the loading manual. Re-approval by the issuing authority is required after any hull conversion, tank modification, or significant hardware/software change, and the certificate of approval together with the matching software revision must be available on board for survey.

Estimated lifetime: Not meaningfully measured in running hours - a loading computer is normally kept in service for the working life of the hull, in the order of 15-25 years, with a hardware refresh commonly needed every 8-10 years and mandatory re-approval after any hull conversion or major software change.

Components & Design

Component data being added…

Technical Data

instrument type loading_computer

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #68820 · ✓ still in production