Rigid Secondary Barrier (RSB): HRT-2001
Rigid Secondary Barrier (RSB): HRT-2001 by Hankuk Carbon Co., Ltd.. DNV TA certificate TAK000008B.
Inspector Detail
▸
Common issues
- Delamination or debonding of the composite laminate at panel edges or overlaps, often surfacing during cooldown-related mechanical stress
- Cracking of the resin/glass-fibre laminate surface, typically near penetrations, corners or stiffener attachments
- Loss of bond at the mastic/adhesive interface between the secondary barrier and hull insulation structure
- Moisture ingress behind the barrier compromising interbarrier space nitrogen inerting integrity
- Surface abrasion or puncture damage from tools or access equipment during tank entry
- Overlap seam failure at panel joints, usually detected through nitrogen leak-rate trending
Inspection checklist
- Visual inspection of accessible barrier surfaces for cracking, delamination, discoloration
- Review interbarrier space nitrogen pressure/leak-rate trend since last survey
- Check overlap seams and corner details for lifting or separation
- Inspect pipe/cable penetrations and sealing collars for integrity
- Review interbarrier space gas analysis (hydrocarbon detection) logs for anomalies
- Check for evidence of moisture or ice formation in the interbarrier space
- Confirm nitrogen purge system pressure and flow are within specification
- Cross-check maker's periodic survey report against actual accessible panel condition
Service intervals
| Interbarrier space nitrogen pressure/leak monitoring | continuous, reviewed each watch |
| Visual inspection of accessible barrier areas | at each dry-docking / class special survey |
| Full nitrogen leak-rate test of secondary barrier | class special survey interval, typically 5 years - confirm against the applicable class notation |
| Interbarrier space gas detection sensor calibration | typically annual |
Critical spares
- Maker-approved laminate repair kit (resin and reinforcement cloth) for local repairs
- Replacement mastic/adhesive compound for local re-bonding repairs
- Nitrogen purge system filters and pressure regulators as fitted
- Interbarrier space gas detection sensor elements
- Penetration seal/collar spares for pipe and cable entries
Safety
- Confined space entry into the interbarrier space requires full gas-free and oxygen verification
- Loss of nitrogen inerting can allow hydrocarbon accumulation in the interbarrier space - explosion/asphyxiation risk
- Cryogenic exposure risk if primary barrier integrity is also compromised
- Repair resin systems may carry inhalation/skin hazards - follow the maker's safety data sheet
Class survey
Category mismatch: this listing is filed under Steering Gear, but the product is a GTT-type membrane LNG cargo containment Rigid Secondary Barrier (RSB) panel system by Hankuk Carbon, not steering equipment - the notes above address the actual product. Class (DNV) surveys typically review interbarrier space nitrogen pressure/leak trend records, gas detection logs, and accessible panel condition at each special survey, with any laminate repair subject to approval under the ship's approved containment system manual.
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →DNV type approval
Verified against the DNV Approval Finder — the certificate below is issued by DNV, not by us.
- Certificate
- TAK000008B
- Approved as
- Insulation Materials for Gas Carriers · Non-metallic Materials
- Certificate holder
- Hankuk Carbon Co., Ltd. (Republic of Korea)
- Valid until
- 2028-08-22