"> Hyundai Marine Machinery Co., Ltd. MAXI T50SL WS, T100SL WS, T150SL WS
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
Hyundai Marine Machinery Co., Ltd.

MAXI T50SL WS, T100SL WS, T150SL WS

MAXI T50SL WS, T100SL WS, T150SL WS by Hyundai Marine Machinery Co., Ltd.. DNV MED certificate MEDB00001J8.

Hyundai Marine Machinery Co., Ltd. MAXI T50SL WS, T100SL WS, T150SL WS

Inspector Detail

Common issues

  • Wash water pH or turbidity readings drifting outside compliance limits
  • Spray nozzle or tower packing fouling from soot/particulate build-up reducing SOx removal efficiency
  • Wash water circulation pump wear or cavitation from particulate-laden water
  • Corrosion of scrubber tower and ducting internals from acidic wash water
  • CEMS sensor fouling or calibration drift affecting SO2/CO2 ratio compliance readings
  • Bypass/exhaust routing damper faults affecting gas flow control

Inspection checklist

  • Check CEMS calibration status and compare readings against reference gas
  • Inspect wash water pH/turbidity monitoring and the compliance log
  • Open tower manholes to inspect for scale, soot and corrosion where access allows
  • Inspect spray nozzles and demister for fouling
  • Check wash water pump seals and bearings for leakage or vibration
  • Verify bypass damper operation and position feedback
  • Confirm the exhaust gas cleaning system record book is up to date
  • Inspect exhaust ducting and expansion joints for corrosion

Service intervals

CEMS calibration per class/maker requirement, typically quarterly with an annual full calibration - confirm against maker manual
Wash water pump seal/bearing check annually or at first sign of leakage/vibration
Tower internal inspection annually or opportunity-based at dry-docking
pH/turbidity sensor cleaning monthly or per observed fouling rate

Critical spares

  • Wash water circulation pump seal kit
  • Spray nozzle set
  • pH and turbidity sensor probes
  • Bypass damper actuator
  • CEMS sample line filters

Safety

  • Acidic or caustic wash water contact hazard during sampling and maintenance
  • Confined space entry for tower internal inspection - verify gas-free before entry
  • Hot ducting and tower surfaces near the exhaust connection
  • Chemical dosing system hazards where caustic soda is used for pH control

Class survey

Class reviews the EGCS Onboard Monitoring Manual, wash water discharge and CEMS calibration records against MEPC.259(68); confirm current survey scope and EGCS certificate validity with the vessel's class notation.

Components & Design

Component data being added…

Technical Data

imo approved True

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

DNV type approval

Verified against the DNV Approval Finder — the certificate below is issued by DNV, not by us.

Certificate
MEDB00001J8
Open the certificate at DNV →
Equipment Model #43568 · ✓ still in production