"> Jingjiang Haihong Plastics & Rubbers Science-Technology Co., Ltd Pipe penetration through "A" class bulkheads and decks
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 1 verified suppliers & service companies for Jingjiang Haihong Plastics & Rubbers Science-Technology Co., Ltd in the Maritime Network Find suppliers →
Jingjiang Haihong Plastics & Rubbers Science-Technology Co., Ltd

Pipe penetration through "A" class bulkheads and decks

Pipe penetration through "A" class bulkheads and decks by Jingjiang Haihong Plastics & Rubbers Science-Technology Co., Ltd. DNV MED certificate MEDB000023E.

Inspector Detail

Common issues

  • Incorrect or insufficient annular gap fill/intumescent material at installation
  • Seal displaced or damaged during later pipe or cable work by other trades
  • Incompatible pipe material or diameter not matching the tested/approved configuration
  • Sealant or sleeve material ageing and shrinking over time
  • Missing certification label or marking at the penetration
  • Additional unauthorised penetrations made nearby, weakening the boundary

Inspection checklist

  • Visual condition of the seal material at each penetration
  • No visible gap or daylight around the pipe
  • Sealant/sleeve firmly bonded to both the pipe and the bulkhead/deck opening
  • Pipe type and size matches the tested/approved configuration
  • Penetration documented on the structural fire protection/fire zone drawing
  • No unauthorised additional penetrations nearby
  • Certification marking present and legible

Service intervals

Visual condition check at each periodic structural fire protection inspection, typically annually
Full boundary/documentation audit at renewal survey
Re-check after any nearby pipework or cable modification immediately following the work
Certification marking legibility check at each periodic fire safety inspection

Typical wear limits

Gap between pipe and seal material should show no visible gap - any gap indicates the seal has failed and needs reinstatement per the approved installation method
Sealant condition cracking, shrinkage, or separation from the pipe or structure should be assessed against the type approval installation instructions before the boundary is accepted
Overlap/embedment depth of the seal system should match the depth specified in the approved installation drawing - confirm against certificate MEDB000023E

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Matching type-approved penetration seal kit, by certificate reference
  • Intumescent sealing material of the approved type
  • Mounting/sleeve hardware matching the approved installation
  • Certification/identification label for reinstatement
  • Backing/packing material matching the approved system

Safety

  • An improperly sealed or damaged penetration compromises the "A" class fire and smoke boundary between compartments
  • Any modification must be re-certified/approved, not field-improvised
  • Loss of boundary integrity here directly undermines the fire zone subdivision relied on for escape and firefighting

Class survey

Note: this catalog entry is filed under 'Fire Hoses & Nozzles' but the product is a fire-rated pipe penetration seal for 'A' class bulkheads/decks (MED certificate MEDB000023E), not a hose - the content above addresses the actual product. Class surveyors check structural fire protection at each penetration against the approved drawings and the MED certificate during SOLAS II-2 related surveys.

Estimated lifetime: Not applicable in running hours; passive fire penetration seals are inspected for physical integrity for the life of the installation, provided they remain undamaged and unmodified.

Components & Design

Component data being added…

Technical Data

imo approved True

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #42541 · ✓ still in production