HK-24/A60/C, HK-24/A0/C, HK-24/A60/J, HK-24/A0/J Multi Cable Penetration

HK-24/A60/C, HK-24/A0/C, HK-24/A60/J, HK-24/A0/J Multi Cable Penetration by Shanghai Huoke New Material Co., Ltd.. DNV MED certificate MEDB0000AT1.

Inspector Detail

Common issues

  • Transit frame installed with insert orientation that does not match the certified drawing, voiding the A60/A0 rating
  • Unused cable ways left open or fitted with an incorrectly sized blank insert instead of the approved filler block
  • Compression bolts left under-torqued after cables are added or removed later in the ship's life
  • Cable fill exceeding the frame's certified maximum after later cable additions
  • Corrosion or paint over-spray obscuring the type-approval marking on the frame
  • Sealing compound (compound-filled variants) shrinking or cracking over time, opening a path through the fire barrier
  • Re-cabling work leaving glands unsealed at the transit, especially in engine room and cable-deck bulkheads

Inspection checklist

  • Confirm the frame model and A60/A0 marking is legible and matches the approved drawing
  • Check that every cable way is filled with either a live cable or an approved blank insert - no open ways
  • Verify compression bolts are torqued to the value on the manufacturer's installation sheet
  • Inspect the sealing face for visible gaps, cracks or missing sealant beads
  • Check frame welds and mounting to the bulkhead/deck for corrosion or mechanical damage
  • Verify the earthing/bonding strap from frame to hull structure is intact
  • Confirm no cables have been added since the last certified installation without updating the cable schedule
  • Check the transit is not obstructed by later-fitted lagging, cable trays or outfitting

Service intervals

Visual condition and torque check annually, as part of fire safety rounds
Full re-verification against the cable schedule at each dry-docking or after any re-cabling work
Sealing compound renewal (compound-sealed variants only) when compound shows shrinkage or cracking, typically after several years - condition-based, not fixed

Typical wear limits

Gap between adjacent insert blocks after compression should be effectively zero - any visible gap points to a wrong block size or under-torqued bolts, confirm against the installation manual
Compound shrinkage crack width cracks visibly opening the barrier normally call for compound renewal - confirm against the manufacturer's guidance

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Replacement filler/blank inserts matching the frame's cable-way size
  • Sealing compound sticks or strips (compound-sealed variants only)
  • Compression bolts and washers matching the original specification
  • Frame sealing gasket/strip, where fitted
  • Cable glands for re-terminating any disturbed cables

Safety

  • Loss of A60/A0 fire and gas-tight integrity if blank inserts or compound are missing - never leave a cable way open, even temporarily
  • Hot work near the transit requires a fire permit; the frame itself is not fire-resistant once disturbed
  • Do not over-tighten compression bolts beyond the specified torque - this can crack insert blocks and create new leak paths

Class survey

Surveyors typically confirm the installed transit matches the type-approved drawing and current cable schedule, that fire integrity markings remain legible, and that no unrecorded cable additions have compromised the certified rating. Usually covered under hull/fire safety rounds rather than a dedicated CSM item.

Estimated lifetime: Not applicable in running hours - this is a passive fire-rated penetration. Expected service life follows the vessel's structural life, subject to periodic condition and compression checks.

Components & Design

Component data being added…

Technical Data

imo approved True

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

DNV type approval

Verified against the DNV Approval Finder — the certificate below is issued by DNV, not by us.

Certificate
MEDB0000AT1
Open the certificate at DNV →
Equipment Model #40369 · ✓ still in production