OceanSphereENGINES

L48/60CR

Silnik główny 4-suwowy · Silniki główne (4-suwowe)

Dane techniczne ze źródeł producenta lub towarzystwa · jeszcze niesprawdzone ręcznie​​‍‌‌​‍​‌⁠‍‌‌⁠​⁠⁠⁠⁠​
6 / 7 / 8 / 9 / 12 / 14 / 16 / 18Cylindry
480 mmŚrednica cylindra
600 mmSkok
7,200-14,400 kW (6-9L, 12-18V)Wydajność
HFO / VLSFO / MGOMedium

Der MAN L/V48/60CR ist MANs leistungsstärkster 4-Takt-Hauptmotor für diesel-mechanische und diesel-elektrische Antriebe auf großen Fähren, Kreuzfahrtschiffen und Offshore-Einheiten. Bis 18V: ~14.4 MW pro Motor.

Dane techniczne

Dane techniczne.dane referencyjne — niezweryfikowane

Masz kartę katalogową producenta dla tego modelu? Wyślij ją razem z formularzem zapytania — sprawdzimy ją i podamy źródło.

Bore480 mm
Stroke600 mm
Swept volume per cylinder108.6 dm³
Fuel consumption (SFOC) at MCR181 g/kWh
Fuel consumption (SFOC) at 85% MCR173-173.5 g/kWh
Specific lube oil consumption (SLOC)0.5 g/kWh
Mean Effective Pressure (MEP)25.8-26.5 bar
Power per cylinder1,200 kW per cylinder (V-config), 1,200 kW per cylinder (L-config)
Injection systemAdvanced electronic common rail (HPCR)
TurbochargingHigh efficiency constant pressure MAN TCA series with two-stage configuration
Emissions complianceIMO Tier II and IMO Tier III (with SCR system)
Power-to-weight ratio12.3-14.7 kg/kW (varies by configuration)
Typ4-Stroke Medium-Speed Trunk Piston Engine (Common Rail)
Sfoc g (kWh)172
TierIMO Tier II/III
Typ napęduGearbox + CPP or Generator
KonstrukcjaTrunk piston, inline or V, CR
Serwis

Uwagi serwisowe.

Co nasza praca serwisowa i dokumentacja producenta mówią o utrzymaniu tego modelu w ruchu.

## 30,000-hour Major Overhaul Workflow (per anonymized service report) Typical scope: 2 weeks per engine, all 9 cylinders or selected cylinders by inspection. Performed at yard or in-port with engine cooled and isolated. ### 1. Cylinder Heads - Dismantle from engine, transport to workshop - Recondition Valve Seats and Valve Spindles by special machine - Inspect Valve Guides, Springs, Injector Sleeves; clean - Disassemble Valve Rotators (intake + exhaust); replace worn parts; reassemble - Pressure-test each head (must show no leakage) - Reassemble with **new O-rings and Seal Rings** - Install in place; tighten per MAN-ES manual specs ### 2. Rocker Arm Casings - Dismantle, clean, visual inspection - Install with **new seal rings**; tighten to specified torque - Readjust Valve Clearance per manual; lock ### 3. Piston Connecting Rods - Dismantle pistons, disassemble, clean - Check Piston Groove Height (must be within wear limit) - Penetration test on Piston Skirts (no abnormality acceptable) - Inspect Piston Pins (Gudgeon Pins) - Inspect Conrod Small End Bushes — scratches indicate LO contamination - Reassemble with **new piston rings** (Top, Sec, Oil) - Tighten Con-rod Small End nuts per manual - Verify Bolt Elongation ΔI within specified range ### 4. Cylinder Liners - Clean; measure diameter (must be within wear limits) - Hone internal surface to restore running geometry - Replace **Top Land Rings** with reconditioned spare parts ### 5. Crankpin Journals & Bearings - Open up requested bearings (typical: 1-2 bearings per overhaul as sample inspection) - Inspect crankpin journal at TDC + BDC positions - Polish bearing if scratches found (LO contamination signature) - Reassemble with bolt elongation check within range ### 6. Main Bearings - Open up sample main bearing - Inspect Main Journal - Polish bearing if scratches found - Verify **Crankshaft Deflection** at all units - Verify **Axial Clearance** - Reassemble; bolt elongation check ### 7. Camshafts - 9 sections incl. bearings — clean and inspect each - Document scratches/seizures (especially on intake cams + rollers) - Verify Camshaft Bearing Clearance within wear limit - Polish minor scratches; replace seized components ### 8. Control Drives - Open Control Drive Case cover; visual inspection - Verify Camshaft Drive Gearwheel + Intermediate Gearwheel + Crankshaft Gearwheel surfaces - Check gear backlash (must be within range) - Verify lubrication injection nozzle clear with priming pump running ### 9. VVT Control (Variable Valve Timing) - Test with hydraulic pump running - Verify VVT Cylinder + Shaft activate sensitively in manual mode ### 10. Fuel Injection Valves - Dismantle requested valves, disassemble, clean, inspect - **Replace Nozzles + Pressure Springs as standard** - Adjust Opening Pressure on test rig - Reassemble with **new O-rings and Seal Rings** - Clean Fuel Injection Pipes; install with new sealing rings - Scrap entire valve if nut corrosion found ### 11. Engine Test - Fill cooling water; verify no leakage - Clean oil sump thoroughly - Start priming pump; verify LO flow at all main bearings, crankpin bearings, pistons, camshaft, rocker arms - Start engine at rated speed (~500 RPM) - Open crankcase covers for inspection at 5/10/30 minutes idle - Verify CR-system pressure values, lube oil pressures + temperatures within normal range ## Post-overhaul recommended re-checks (after 500 running hours) - Conrod Nuts (re-torque check) - Big End Nuts (re-torque check) - Valve Clearance (readjust if needed) - Crankshaft Deflection (verify alignment held) ## Critical operating recommendation **Lube Oil Purifier must remain in continuous operation.** Most documented failure modes (bearing scratches, cam seizure) trace directly to LO contamination. Idle purifier = accelerated wear.

Części zamienne

Części zamienne

Uwagi o częściach zamiennych

## Spare parts consumed at 30k-hour overhaul (per cylinder unless noted) ### Sealing & gaskets (always replaced) - O-rings + Seal Rings — Cylinder Head - Seal Rings — Rocker Arm Casing - O-rings + Seal Rings — Fuel Injection Valve - Sealing Rings — Fuel Injection Pipe ### Cylinder & combustion - **Piston Rings** — full set (Top + Sec + Oil) per piston - **Top Land Rings** (often available as reconditioned spare parts — ~50% cost savings) ### Fuel injection - **Pressure Springs** — Fuel Injection Valve - **Nozzles** — Fuel Injection Valve - Spring Plates (if worn) - Whole Fuel Injection Valve assembly (if nut corrosion) ### Valve train - Valve Rotator worn parts (intake + exhaust) ### Bearings (replace only if non-polishable) - Conrod Small End Bushes (replace if deep scratches) - Crankpin Bearings (typically polishable) - Main Bearings (typically polishable) - Camshaft Cams + Rollers (replace if seized) ### Notes on sourcing - All parts available via MAN Energy Solutions global service network - Reconditioned parts (Top Land Rings, valve components) accepted by major class societies — significant cost reduction - Lead times typically 4-12 weeks for standard items, 12-20 weeks for major components (heads, liners)

Potrzebujesz tej części?

Zapytaj o ofertę na ten model.

Bezpłatnie — wyślij zapytanie dotyczące sprzętu MAN Energy Solutions. Nasz zespół je sprawdzi i odpowie e-mailem.

W przypadku sprzętu okrętowego prawie żaden producent ani autoryzowany dystrybutor nie podaje ceny, dopóki statek jest nieznany. Z danymi statku dostępność i cenę da się ustalić szybciej; bez nich być może musimy najpierw dopytać, co kosztuje kilka dni. Jeśli nie wolno Ci podać statku, wystarczy zdjęcie tabliczki znamionowej — dołącz je poniżej lub odeślij w odpowiedzi na nasz e-mail potwierdzający.

Twoje dane kontaktowe nie są publikowane. Konto nie jest wymagane.
Powiązane modeli

Także w Silnik główny 4-suwowy.

Inne modele tego samego typu sprzętu, najpierw MAN Energy Solutions.

Według producenta MAN Energy SolutionsWärtsiläCaterpillarHiMSENMTUVolvo PentaYanmar Power Technology Co., Ltd.HanshinDaihatsuPielstickMaK (Caterpillar)Rolls-Royce / BergenCaterpillar MaKCumminsBaudouinWszyscy producenciCzęści według urządzeńNowy użytkownik? Załóż darmowe konto Nieczytelna tabliczka? Wypróbuj skaner tabliczek Wszystkie modele MAN Energy Solutions Podobne do MAN L48/60CR
Więcej, niż pokazuje karta katalogowa

Odpowiadamy e-mailem, nigdy automatem.

Powiedz nam, czego potrzebujesz do tego MAN Energy Solutions L48/60CR — części, wizyty serwisowej, drugiej opinii. Czy jesteś MAN Energy Solutions? Przejmij tę stronę marki.

Serwisant? Napisz raport dzienny dla tego L48/60CR w OceanSphere Work — zdjęcia, godziny i części, jako PDF dla armatora. Wypróbuj 14 dni za darmo →

Często pytane

Pytania, które pojawiają się przy tym sprzęcie.

Czy dane tego modelu są bezpłatne?

Tak. Dane techniczne, dokumenty i uwagi serwisowe tego modelu są dostępne bez konta. Konto dodaje zapisane wyszukiwania i zapytania, niczego nie odbiera.

Czy znajdziecie część dokładnie do tego modelu?

Tak. Podaj producenta, model i czego potrzebujesz — każde zapytanie czyta człowiek i odpowiada e-mailem.

Dane techniczne wydają się błędne — co teraz?

Wyślij nam tabliczkę lub prawidłową wartość. Sprawdzimy ją w karcie danych producenta lub rejestrze towarzystwa klasyfikacyjnego i zaktualizujemy stronę.